Mod 9 to Contract NRC-04-96-060
ML20153D141
Person / Time
Issue date: 09/18/1998
From: Aufmuth M, Wiggins E
NRC OFFICE OF ADMINISTRATION (ADM), SCIENTECH, INC.
To:
References
CON-FIN-F-6011, CON-FIN-F-6059, CON-NRC-04-96-060, CON-NRC-4-96-60 NUDOCS 9809240331
Download: ML20153D141 (4)


Text

.- __

.m

_. - - _. - =

[2 AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT i

2. $.MENOMINT/MOOtHCATION NO
3. UFECTivE DATE 4 REQUt$4TK)N/ PURCHASE REQ. No. RFPA NO.

s PRoxCT NO. He m@umel 9

gygg RES 96 060 8/6/98 RES C98 476 & 477 f

7. ADMINISTERED BY Ut. 5.t th.n it.en 6) s essutD BY U.S. Nuclear Regulatory Consnission Division of Contracts and Property Mgt.

Attn: DTt2 Contract Management Branch Washington DC 20555

4. NAME AND ADDREs$ OF CONTRACTOM (No.tr t. county, st.t..nd zip Codel (X) 9A. AMENDMENT OF souCITArlON NO.

ee. oATED csEE ITEM 11)

Scfentech, Inc.

Leonard Ward, Project Manager loa. Mo IRCAYlON OF CONTRACTIORDER NO.

910 Clopper Road Galthersburg MD 20878 Con # NRC-04-96-060 toe. DATED ISEE ITEM 13) lFActuTv Coof X

09 23 1996 CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS l

The above numbered solicitation is amended an set forth in item 14. The hour and date specified for receipt of OffersOi extended.

i notextended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the folloceing methods:

t) By completing hems 8 and 15, and retuming copies of the amendment; (b) By acknowledging receipt of this amendment of each opy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR.\\C-KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be ma1e by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening luur and det* specified.

tr. ACCOUNTDIG ANO APPRomATION DATA of t.quw.d)

B&R: 86060826100 APPN: 31X0200.860 80Ct 252A JCNr F6011 Obtloatg_$25.000.

JCN: F6059 Oblicatt $25.000.

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

00 A. THIS CHANGE ORDER t$ IsSUEO PUR$UANT TO: ($p.cdy.uthentyt THE CHANGES SET FORTH H ITEM to ARE MADE IN THE CONTRACT ORDER NO. IN ITEM toA.

S. THE AsoVE NUMeERED CONTRACT /OfcER is WODIRED TO REFLECT THE ADMH$TRATIVE CHANGES (such ch.ng In p.png offic...ppropn.uon d.t.,.tc.)

SET FORTH IN rTEM 14, PUR$UANT TO THE AUTHORITY OF FAR 43.1o3tbl.

C.TMs SUPPLEMENTAL AGREEMENT IS ENTERED INTO FUR $UANT TO AUTHomTV OF:

0,0THER cspec.sy tw..e nmene.o n.ne.v"=atvl Pursuant to FAR 52.243-2 & mutual agreement of the parties.

X Contrector C is not. x is required to sign this document and return 2 copies to the issuing office, l

.E. IMPORTANT:

14. 0EsCRFTION OF AMENOMENT/MOceRCATION forg.rua.d by UCP ucuan h dene.,includmg.oncit.non/contr.ct.ube.ct m.tt.r who e f a.td.)

See page 2 for description of modification.

s

's 9009240331 980918 mys PDR CONTR

'Kr I

NRC-04-96-060 PDR u

E.c t u

,W.4 h., n..a

.nd can.

n.

e.oev nt

.<.ne.4 in it e4 or ioA. u h..avo,. ch.ne.o.

n. unch.no.4.no in eue so,c..no.n.a N

1sA. NAME AND TITLE OF CONTRACTING OFFICER (Type or pant)

IsA.NAME l

Etois J. Wiggins COntf9Ct3 M80898f Contracting Officer isa.

sp

[I tsC. DATE slGNED WUNIT TEs 84 ERICA 16C. DATE slGNED rh / /,conpfneoe c.o mu

<A W /W 7/7h

.Y 4

<s.ea.iu,..ee.,.on e n d a en

@/

<4n.iu,..

sT_RD,_,o

,o.,,

l Contract No. NRC-04-96-060 Modification No. 9 Page 2 of 2 The purpose of this modification is to (1) increase the ceiling of the contract by $714,404.00 from $1,922,619.91 to $2,637,023.91 to accommodate a within-scope change for performance of Option Year 2 and Optional Task 58 in accordance with the contract statement of work as modified by the attached, and the Contractor's technical proposal dated August 28,1998, as revised September 4,1998, hereby incorporated, (2) provide incremental funding in the amount of $50,000.00, (3) incorporate the Contractor's plan for consolidation of the TRAC codes (developed under Task Sa) by reference into the contract. Accordingly, the contract is modified as follows.

i Under Section B.3, " Consideration and Obligation - Cost Plus Fixed Fee," paragraphs a, e, and f are deleted in their entirety and replaced with the following in lieu thereof:

"a.

The total estimated cost to the Govemment for full performance of this contract is $2,637,023.91 of which the sum of $2,459,902.90 represents the estimated l

reimbursable costs and of which $177,121.01 represents the fixed fee.

1 e.

The amount presently obligated by the Government with respect to this contract is $1,782,488.00.

l f.

It is estimated that the amount currently allotted will cover performance through November 2,1998."

Section F.6, " Duration of Contract Period (MAR 1987), Attemate 2 (MAR 1987),"is hereby deleted in its entirety and substituted with the following:

"This contract shall commence on 09/23/96 and will expire on 10/01/99. The term of this contract may be extended at the option of the Govemment for two additional 1-year option periods" A summary of obligations for this contract, from award date through the date of this action, is l

given below:

Total FY96 Obligations:

$100,000.00 Total FY97 Obligations:

712,488.00 l

Total FY98 Obligations:

970,000.00 Cumulative total of NRC obligations:

$1,782.488.00 l

j This modification obligates FY98 funds in the amount of $50,000.00

. All other terms and conditions of this contract remain unchanged.

l l

I L

Statement of Work - Revision No.1 Contract NRC-04-96-060, Modification No. 9 for Option Year 2 and Optional Task SB Maintenance of TRAC-BWR Thermal-Hydraulic Simulation Code for Reactor Transients The objective of this contract modification is to implement changes to the statement of work for performance of Option Year 2 and Optional Task 58. The changes to the statement of work follow.

Option Year 2 Task 1 A decrease in the level of effort for this task is required based on the fact that the current number of TRAC users is lower than estimated at initiation of the contract. (See " Level of Effort.")

Task 2 No changes.

Task 3 A decrease in the level of effort for this task is required based on the fact that the current number of TRAC users is lower than estimated at initiation of the contract. (See " Level of Effort.")

Ialk4 No change.

Ootional Task 5B The following BWR components are to be implemented as stated in the NRC approved Consolidation Plan (SCIE-NRC-316-97, August 11,1997) by September 22,1999:

(1) Jet Pump Component (2) Level Tracking Method (3) Channel Component (4) Turbine Component (5) Feedwater Heater Component (6) Control System

( A TRAC-8 Input Processing.

(8) Containment model

D l

l l

l l

Statement of Work - Revision No.1 Contract NRC-04-96-060, Modification No. 9 3

Option Year 2 and Optional Task 58 l

Ootional Task SB (continued)

Postpone all developmental assessment activities until Option Year 3 Delete implementation of the One-Dimensional Kinetics Model and Decay Heat Modelinto the TRAC-'M code.

i Period of Performance The period of performance for Option Year 2 is changed to commence September 23,1998, and expire on October 1,1999.

Level of EffoIt Estimated reduction in the Task SB effort is 9 staff-months Estimated reduction for Task 1 and 3 is approximately 4 staff-months.

The estimated level of effort for Tasks 2 and 4 remains unchanged.

-