OPERATING DATA REPORT 50-348 DOCKET NO.
DATE 2/4 /86 COMPLETED BY.T Aunnanrd TELEPHONE (204 899-5156 OPERATING STATUS Joseph M. Farley - Unit 1 Notes
- 1. Unit Name:
3). cumulative data since Januarv. 1986 I2-1-77, date of corrmercial
- 2. Reporting Period:
2652 operation.
- 3. ucensed Thermal Power (MWt):
860
- 4. Namepiste Rating (Gross MWe):
829
- 5. Design Electncal Rating (Net MWe):
873.4
- 6. Maximum Dependable Capacity (Gross MWe):
A27 5
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
Items #6 and #7 have been changed due to evaluation of operating experience.
- 9. Power Level To Which Restricted.lf Any (Net MWe): N/A N/A
- 10. Reasons For Restrictions If Any:
i This Month Yr.-to-Date Cuniulative 744 744 71,616 _
- 11. Hours In Reporting Period 74 4. 0 744.0 50,377.1
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 3,650.0
- 13. Reactor Reserve Shutdown Hours 744.0 744.0 49,149.6
- 14. Hours Generator On-l.ine v.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1.877.709 1.877.709 124.749.251
- 17. Gross Electrical EnerEy Generated (MWH) 624.48R 624.48R J 9.927.R6R
- 18. Net Electrical Energy Generated (MWH) s97.n74 so? n74
__tv sno 7o9
- 19. Unit Service Factor 1on n 1ofLa An 6
- 20. Unit Availability Factor 100.0 100.0 68.6 96.2, 96.2 65.6
- 21. Unit Capacity Factor (Using MDC Net) 96.0 96.0 63.3
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 11.5
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
N/A N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status t Prior to Commercial Operation):
Forecast Achieved 08-06-77 08-09-77 INITIAL CRITICALITY 08-20-77 08-18-77 INITIAL ELECTRICITY 12-01-//
I z-ul- / /
COMMERCIAL OPER ATlON
[M'"ina P4ha M
//
e,y,,
y..
--_q -
DQCgy,7 NO, 50-348 UNIT I
DATE Fahrunev 4_
19R6 COMPLETED BY 1 n. L'nnanra
(
TELEPHONE (205) 899-5156 3gogg Januarv. 1986 f
DAY AVERACE DAILY PO VER LEVEL DAY' AVERACE DAILY POWER LEVEL (5tWe-Net)
(AlWe%t) 832 829 1,
37 2
831 gg 828
-~
.. 3 6 ~ ~
- -- - - -- ---- g 9 - -
829 7
3 4'
'A6 20 R11 829 383 73 3
827 6
Ran
, 22 831 7
23 829 833 24 831 g
(
9 834 25-831 1
10 831 g
831 831 11 27 831
[2 832 3
831 l3 R19 29 R7R 833 830 14 30 j
s 832 33 831 16 831 INSTRUCUONS On this form:t. list the average daily unit power !ctelin M%'e Net for each day in the reporting month. Campute to
, the neste:t whule me;2 watt.
(9(77) i e.,
7
,,_7
...m.,
,-.e...
,_,.,__n._,_,
4 UNIT Salu1 DOWNS AND POWER REIMJCI1ONS DOCKET NO. 55-348 UNITNAME J.M.Farlev-Unit!
i DATE Fahrunry 3.
1986
't 1
I REPORT MONTil J wary COMPLETED BY
_J. D. Wooda rd TELEtt00NE (205)899-5156 j
i 5:
4
. h Lkensee Ev, k
Causs & Cmtective l
.l E "k
No.
Desc
{
g=
,gae Event uv Acia.. so uY0 P**"'R*#"'*"'"
b jig Repms #
u o
a i
4
~
860103 F
0 A
4 N/A M
FCV Power was reduced to approximately 001 38.5% due to a high sodium level in the j
Unit 1 steam generator blowdown.. The i
high sodium was caus' d by a valve e
I failure in the Unit 2 Water Treatment I
Plant during secondary regeneration, j
Yne sodium level was reduced by feed 1
and bleed process and the valve was j
repaired and the unit was returned to full power operation.
l i.
)
l
(
I t
2 3
4 1:
F: Foeced Reason:
. Meehod:
EaWhis G-lassenesiums S: Scheduled A-Easmipenses Failwe(Emplain)
I-Manual fw Psepasaa6an of Dasa -
B-Maissemencs ad Test 2 Manual Scrasm.
Emesy Seicets (a Lkensee L
C-Refueleng 3 Amenenatic Sceaan.
Evans Repewe (LERn FileINUREG-D Regulaemy Resesectism 4 Osleet(Empiahs) 0161)
E-Operasar Tsaining & Ucense Exameinasius i
F-Adadaisseasive 5
G-Opesasional Essur (Emplain)
Ezhibis 1 Same Sima e 49/77)
Il Gehen (Emplain)
m 1
f'*,
1 J
JOSEPH M. FARLEY NUCLEAR PIANT UNIT 1 NARRATIVE SID9tARY OF OPERATIONS January, 1986 There were no unit shutdowns during the month of January.
A significant power reduction began on 1-3-86.
Power was reduced to approximately 38.5% of rated thermal power due to a high sodium level in the Unit 1 steam generator blowdown. After the sodium level was reduced, the Unit returned to full power operation on 1-6-86.
The following majcr safety-related maintenance was performed in the month of January:
1.
Miscellaneous corrective and preventive maintenance was performed on diesel generators.
l l
l l
I i
i I
1 i
l j
2 OPERATING DATA REPORT 50-348 DOCKET NO.
DATE 2/4 /86 COMPLETED BY rn waard TELEPHONE r?ns)a99-5156 OPERATING STATUS Notes Joseph M. Farley - Unit 1
- 1) ePulative data sinceI-77, date of connercial
- 1. Unit Nome:.
I Januarv. 1986
- 2. Repesting Pened.
2652 operation.
- 3. Licensed Thennal Power (MWt):
860
- 4. Namepiste Ratang (Gross MWe):
829
- 5. Domen Elecincel Ratmg(Net MWe):
873 4
- 6. Maximum C., - - "E Capacity (Gross MWe)-
R2 7. 5
- 7. Maxiesman C.,:M ": Capacity (Net MWe):
- 8. If Cheeses Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
Items #6 and #7 have been changed due to evaluation of operating experience.
'I N/A
- 9. Power Level To Which Restncted.If Any (Net MWe):
N/A
- 10. Reasons For Restrictions. If Any:
g This Month Yr to.Dete Cur'nulative 744 744 71,616
- 11. Hours la Reportmg Period 74 4.0 744.0 50,377.1
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 3,650.0
- 13. Reactor Reserve Shutdown Hours 744.0 744.0 49,149.6
- 14. Hours Generator On.Line
. U.u o.o o.o
- 15. Unit Reserve Shutdown Hours 1.877.709 1.877.709 124.749.251
- 16. Grom Thermal En'.ly Generated (MWH) 624.488 624.4aa 19.927.R6R
- 17. Gross Electncalinergy Generated (MWH) 997.n74 so? n7a sv 'uto 7o9
- 18. Net Electrical Energy Generated (MWH) inn n inn n An A
- 19. Unit Serv;ce Factor 100.0 100.0 68.6
- 20. Unit Avadabdity Factor 96.2 96.2 65.6
- 21. Unit Capacny Factor (Using MDC Net) 96.0 96.0 f.3. 3
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 11.5
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Durationef Eacht:
N/A l
5 N/A
- 25. If Shut Down At End Of Report PeriM. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercal Operation):
Forecast Achieved 08-06-77 08-09-77.
INITIAL CRITICALITY 08-20-77 08-18-77 INITIAL ELECTRICITY Iz-ul-//
12-u1-7/
COMMERCIAL OPERATION (4/77)
DOCKIT NO.
50-348 UNIT I
i DAll Fahrinnrv 4_
10A6 i
COMPLETED BY J-D-
L'n a d a rd TELEPHONE - (205) 899-5156 310 E I January, 1986 f
DAY AVERACE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL (51We-Net)
(5tWe-Net) 832 829 37 2
831 gg 828 3
829 738' -
4 966 20 All 029 383 21 827 6
- 10 22 831 7
23 829 833 24 831 g
9 834 25-831 831 831 3
10 831 11 27 831 12 832 3
831 13 R17 23 978 830 833 30 14 is 832 33 831 16 831 M UCIONS
~
On this form:t. list the aves,ge dsdy unit powe !cvelin MWe-Net for each dsy in the reporting month. Compute io
, the neare:t whole me;swatt.
(9fl7)
-,,wv y
wwwma
4
+,
O Sb-348 UNIT Silu1 DOWNS AND POWER REDt)CHONS DOCKET NG.
UNIT NAME J.M.Farlev-Unitl DATE Februnrv 3.
1986 I
COMPLETEI) BY J.D.Woodard REPORT MONTil
'1""""U TELEPilONE (205)899-5156 "t.
w e
g
.l'E
}
} s a:Ej Lkcuscc Eg Cause & Curreceive No.
Daic k
jE ok jgg RepinI #
g}
Event g?
Acekwi to m
E F
oE vi U Prgvent Recurrence 001 860103 F
0 A
4 N/A KIl FCV Power was reduced to approximately 38.5% due to a high sodium level in the Unit I steam generator blowdown. The high sodium was caus'ed by a valve failure in the Unit 2 Water Treatment Plant during seccndary regeneration.
Tne sodium level was reduced by feed and bleed process and the valve was repaired and the unit was returned to full power operation.
f l
l 2
3 4
F: Forced Reason:
Method:
Exhibit G. Inserncsions 1-Manual for PreParackni of Dasa S: S(lieduled A Eiguipenent Failure (Emplain)
B. Maintenance or Test 2 Manual Scrase.
Entry Sheces for Lkensee C Refueling 3 Aulomatic Scrmen.
Event Repent (l.ER) File INUREG-D Regulaeusy Resericsiewi 4 Oslier (Empiakt) 0161)
E Operator Teaining & IJcense Emandnation F-Adudnistrative 5
G Opesallemal Eisor (Emplain)
Exhibit 1 Same Sinn.e (9/77) ll Othes (Explain)
=\\
, stW ' '
'Memng Address.
u.'~
' Alabim3 Power Comp <ny 600 North 18th Street Post Office Box 2641 Birmingham, Alabama *3291
'~
Telephcr.c 005 783 E000 R. P. Mcdonald Senior Vice President
. Flintndge Building AlabamaPower?
t% 5:amm secir c hs:ur
- February. 11, 1996 Docket No. '50-348
- Director, Office of Resource' Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
~RE: Joseph M. Farley Nuclear Plant Unit l' Monthly Operating Data Report Attached are two (2) copies of the January 1986 Monthly Operating
' Report for Joseph M. Farley. Nuclear Plant Unit 1,. required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Yours very rul,
y R. P. Mcdonald RPM /BCE:amh/F-2 Enclosures xc: Director, IE (10 copies)
Director, RII (1 copy)
+
r
,...e
M
,.e -
JOSEPH M. FARLEY NUCLEAR PIANT.
UNIT 1 NARRATIVE SIM4ARY OF OPERATIONS January, 1986 There were no unit shutdowns during the month of January.
A significant power reduction began on 1-3-86.
Power was reduced to approximately 38.5% of rated thermal power due to a high sodium level in the Unit I steam generator blowdown. After the sodium level was reduced,'
the Unit returned to full power operation on 1-6-86.
The following major safety-related maintenance was performed in the month of January:
4 1.
Miscellaneous-corrective and preventive maintenance was performed on diesel generators.