Monthly Operating Rept for Jan 1986
ML20153D040
Person / Time
Site: Farley 
Issue date: 01/31/1986
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8602240012
Download: ML20153D040 (9)


Text

-

~

OPERATING DATA REPORT 50-348 DOCKET NO.

DATE 2/4 /86 COMPLETED BY.T Aunnanrd TELEPHONE (204 899-5156 OPERATING STATUS Joseph M. Farley - Unit 1 Notes

1. Unit Name:

3). cumulative data since Januarv. 1986 I2-1-77, date of corrmercial

2. Reporting Period:

2652 operation.

3. ucensed Thermal Power (MWt):

860

4. Namepiste Rating (Gross MWe):

829

5. Design Electncal Rating (Net MWe):

873.4

6. Maximum Dependable Capacity (Gross MWe):

A27 5

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

Items #6 and #7 have been changed due to evaluation of operating experience.

9. Power Level To Which Restricted.lf Any (Net MWe): N/A N/A
10. Reasons For Restrictions If Any:

i This Month Yr.-to-Date Cuniulative 744 744 71,616 _

11. Hours In Reporting Period 74 4. 0 744.0 50,377.1
12. Number Of Hours Reactor Was Critical 0.0 0.0 3,650.0
13. Reactor Reserve Shutdown Hours 744.0 744.0 49,149.6
14. Hours Generator On-l.ine v.0 0.0 0.0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1.877.709 1.877.709 124.749.251
17. Gross Electrical EnerEy Generated (MWH) 624.48R 624.48R J 9.927.R6R
18. Net Electrical Energy Generated (MWH) s97.n74 so? n74

__tv sno 7o9

19. Unit Service Factor 1on n 1ofLa An 6
20. Unit Availability Factor 100.0 100.0 68.6 96.2, 96.2 65.6
21. Unit Capacity Factor (Using MDC Net) 96.0 96.0 63.3
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 11.5
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):

N/A N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status t Prior to Commercial Operation):

Forecast Achieved 08-06-77 08-09-77 INITIAL CRITICALITY 08-20-77 08-18-77 INITIAL ELECTRICITY 12-01-//

I z-ul- / /

COMMERCIAL OPER ATlON

[M'"ina P4ha M

//

e,y,,

y..

--_q -

DQCgy,7 NO, 50-348 UNIT I

DATE Fahrunev 4_

19R6 COMPLETED BY 1 n. L'nnanra

(

TELEPHONE (205) 899-5156 3gogg Januarv. 1986 f

DAY AVERACE DAILY PO VER LEVEL DAY' AVERACE DAILY POWER LEVEL (5tWe-Net)

(AlWe%t) 832 829 1,

37 2

831 gg 828

-~

.. 3 6 ~ ~

- -- - - -- ---- g 9 - -

829 7

3 4'

'A6 20 R11 829 383 73 3

827 6

Ran

, 22 831 7

23 829 833 24 831 g

(

9 834 25-831 1

10 831 g

831 831 11 27 831

[2 832 3

831 l3 R19 29 R7R 833 830 14 30 j

s 832 33 831 16 831 INSTRUCUONS On this form:t. list the average daily unit power !ctelin M%'e Net for each day in the reporting month. Campute to

, the neste:t whule me;2 watt.

(9(77) i e.,

7

,,_7

...m.,

,-.e...

,_,.,__n._,_,

4 UNIT Salu1 DOWNS AND POWER REIMJCI1ONS DOCKET NO. 55-348 UNITNAME J.M.Farlev-Unit!

i DATE Fahrunry 3.

1986

't 1

I REPORT MONTil J wary COMPLETED BY

_J. D. Wooda rd TELEtt00NE (205)899-5156 j

i 5:

4

. h Lkensee Ev, k

Causs & Cmtective l

.l E "k

No.

Desc

{

g=

,gae Event uv Acia.. so uY0 P**"'R*#"'*"'"

b jig Repms #

u o

a i

4

~

860103 F

0 A

4 N/A M

FCV Power was reduced to approximately 001 38.5% due to a high sodium level in the j

Unit 1 steam generator blowdown.. The i

high sodium was caus' d by a valve e

I failure in the Unit 2 Water Treatment I

Plant during secondary regeneration, j

Yne sodium level was reduced by feed 1

and bleed process and the valve was j

repaired and the unit was returned to full power operation.

l i.

)

l

(

I t

2 3

4 1:

F: Foeced Reason:

. Meehod:

EaWhis G-lassenesiums S: Scheduled A-Easmipenses Failwe(Emplain)

I-Manual fw Psepasaa6an of Dasa -

B-Maissemencs ad Test 2 Manual Scrasm.

Emesy Seicets (a Lkensee L

C-Refueleng 3 Amenenatic Sceaan.

Evans Repewe (LERn FileINUREG-D Regulaemy Resesectism 4 Osleet(Empiahs) 0161)

E-Operasar Tsaining & Ucense Exameinasius i

F-Adadaisseasive 5

G-Opesasional Essur (Emplain)

Ezhibis 1 Same Sima e 49/77)

Il Gehen (Emplain)

m 1

f'*,

1 J

JOSEPH M. FARLEY NUCLEAR PIANT UNIT 1 NARRATIVE SID9tARY OF OPERATIONS January, 1986 There were no unit shutdowns during the month of January.

A significant power reduction began on 1-3-86.

Power was reduced to approximately 38.5% of rated thermal power due to a high sodium level in the Unit 1 steam generator blowdown. After the sodium level was reduced, the Unit returned to full power operation on 1-6-86.

The following majcr safety-related maintenance was performed in the month of January:

1.

Miscellaneous corrective and preventive maintenance was performed on diesel generators.

l l

l l

I i

i I

1 i

l j

2 OPERATING DATA REPORT 50-348 DOCKET NO.

DATE 2/4 /86 COMPLETED BY rn waard TELEPHONE r?ns)a99-5156 OPERATING STATUS Notes Joseph M. Farley - Unit 1

1) ePulative data sinceI-77, date of connercial
1. Unit Nome:.

I Januarv. 1986

2. Repesting Pened.

2652 operation.

3. Licensed Thennal Power (MWt):

860

4. Namepiste Ratang (Gross MWe):

829

5. Domen Elecincel Ratmg(Net MWe):

873 4

6. Maximum C., - - "E Capacity (Gross MWe)-

R2 7. 5

7. Maxiesman C.,:M ": Capacity (Net MWe):
8. If Cheeses Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

Items #6 and #7 have been changed due to evaluation of operating experience.

'I N/A

9. Power Level To Which Restncted.If Any (Net MWe):

N/A

10. Reasons For Restrictions. If Any:

g This Month Yr to.Dete Cur'nulative 744 744 71,616

11. Hours la Reportmg Period 74 4.0 744.0 50,377.1
12. Number Of Hours Reactor Was Critical 0.0 0.0 3,650.0
13. Reactor Reserve Shutdown Hours 744.0 744.0 49,149.6
14. Hours Generator On.Line

. U.u o.o o.o

15. Unit Reserve Shutdown Hours 1.877.709 1.877.709 124.749.251
16. Grom Thermal En'.ly Generated (MWH) 624.488 624.4aa 19.927.R6R
17. Gross Electncalinergy Generated (MWH) 997.n74 so? n7a sv 'uto 7o9
18. Net Electrical Energy Generated (MWH) inn n inn n An A
19. Unit Serv;ce Factor 100.0 100.0 68.6
20. Unit Avadabdity Factor 96.2 96.2 65.6
21. Unit Capacny Factor (Using MDC Net) 96.0 96.0 f.3. 3
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 11.5
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Durationef Eacht:

N/A l

5 N/A

25. If Shut Down At End Of Report PeriM. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercal Operation):

Forecast Achieved 08-06-77 08-09-77.

INITIAL CRITICALITY 08-20-77 08-18-77 INITIAL ELECTRICITY Iz-ul-//

12-u1-7/

COMMERCIAL OPERATION (4/77)

DOCKIT NO.

50-348 UNIT I

i DAll Fahrinnrv 4_

10A6 i

COMPLETED BY J-D-

L'n a d a rd TELEPHONE - (205) 899-5156 310 E I January, 1986 f

DAY AVERACE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL (51We-Net)

(5tWe-Net) 832 829 37 2

831 gg 828 3

829 738' -

4 966 20 All 029 383 21 827 6

  • 10 22 831 7

23 829 833 24 831 g

9 834 25-831 831 831 3

10 831 11 27 831 12 832 3

831 13 R17 23 978 830 833 30 14 is 832 33 831 16 831 M UCIONS

~

On this form:t. list the aves,ge dsdy unit powe !cvelin MWe-Net for each dsy in the reporting month. Compute io

, the neare:t whole me;swatt.

(9fl7)

-,,wv y

wwwma

4

+,

O Sb-348 UNIT Silu1 DOWNS AND POWER REDt)CHONS DOCKET NG.

UNIT NAME J.M.Farlev-Unitl DATE Februnrv 3.

1986 I

COMPLETEI) BY J.D.Woodard REPORT MONTil

'1""""U TELEPilONE (205)899-5156 "t.

w e

g

.l'E

}

} s a:Ej Lkcuscc Eg Cause & Curreceive No.

Daic k

jE ok jgg RepinI #

g}

Event g?

Acekwi to m

E F

oE vi U Prgvent Recurrence 001 860103 F

0 A

4 N/A KIl FCV Power was reduced to approximately 38.5% due to a high sodium level in the Unit I steam generator blowdown. The high sodium was caus'ed by a valve failure in the Unit 2 Water Treatment Plant during seccndary regeneration.

Tne sodium level was reduced by feed and bleed process and the valve was repaired and the unit was returned to full power operation.

f l

l 2

3 4

F: Forced Reason:

Method:

Exhibit G. Inserncsions 1-Manual for PreParackni of Dasa S: S(lieduled A Eiguipenent Failure (Emplain)

B. Maintenance or Test 2 Manual Scrase.

Entry Sheces for Lkensee C Refueling 3 Aulomatic Scrmen.

Event Repent (l.ER) File INUREG-D Regulaeusy Resericsiewi 4 Oslier (Empiakt) 0161)

E Operator Teaining & IJcense Emandnation F-Adudnistrative 5

G Opesallemal Eisor (Emplain)

Exhibit 1 Same Sinn.e (9/77) ll Othes (Explain)

=\\

, stW ' '

'Memng Address.

u.'~

' Alabim3 Power Comp <ny 600 North 18th Street Post Office Box 2641 Birmingham, Alabama *3291

'~

Telephcr.c 005 783 E000 R. P. Mcdonald Senior Vice President

. Flintndge Building AlabamaPower?

t% 5:amm secir c hs:ur

February. 11, 1996 Docket No. '50-348

- Director, Office of Resource' Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

~RE: Joseph M. Farley Nuclear Plant Unit l' Monthly Operating Data Report Attached are two (2) copies of the January 1986 Monthly Operating

' Report for Joseph M. Farley. Nuclear Plant Unit 1,. required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Yours very rul,

y R. P. Mcdonald RPM /BCE:amh/F-2 Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy)

+

r

,...e

M

,.e -

JOSEPH M. FARLEY NUCLEAR PIANT.

UNIT 1 NARRATIVE SIM4ARY OF OPERATIONS January, 1986 There were no unit shutdowns during the month of January.

A significant power reduction began on 1-3-86.

Power was reduced to approximately 38.5% of rated thermal power due to a high sodium level in the Unit I steam generator blowdown. After the sodium level was reduced,'

the Unit returned to full power operation on 1-6-86.

The following major safety-related maintenance was performed in the month of January:

4 1.

Miscellaneous-corrective and preventive maintenance was performed on diesel generators.

4 J

l w

i 9

e e

n yv c

.,-,e

<se

-*.-,m

.