Commonwealth Edison 4-O-
One First National Plaza. Chicago, Ilknois O-Address Reply to. Post Office Box 767 Chicago, Illinois 60690 e
February 13, 1986 Mr. James G. Keppler Regional Administrator 4
i U.S. Nuclear Regulatory Conuttission Region III 799. Roosevelt Road Glen Ellyn, IL 60137
Subject:
Byron Station Units 1 & 2 Braidwood Station Units.1 & 2 Response to IE Bulletin 85-01 NRC Docket Nos. 50-454/455 & 50-456/457 Reference (a):
IE Bulletin 85 JM Taylor letter to all OLS &
CPS listed in Attachment 1 dated October 29, 1985.
Dear Mr. Keppler:
Reference (a) requested that licensee develop procedures for monitoring fluid conditions within the AFW system, for recognizing steam binding, nnd for restoring the AFW system to operable status should steam binding occur. Attachment 1 contains the requested information and copies of procedures implemented at Byron-Unit 1.
These same procedures will be implemented for Byron 2 when it receives an operating license.
The Braidwood units, which are under construction, will have substantially the same requirements imposed. A followup report will be filed
)
within one year of the date of the Bulletin with the requested information.
1 Please address any questions that you or your staff may have concerning our response to this office.
i One (1) signed original with Attachment is being sent directly to the l
USNRC Document Control Desk in Washington, DC for reproduction and distribution as requested in the Bulletin.
Respectfully, G. L. Alexander Nuclear Licensing Administrator U.S. NRC, Document Control Desk Washington DC 20555 SUBS ElBED and Sg p to bef this/J) 5 dav
$g213[
/
, 1986 0
g$021 koc4kA Botary Fablit
.tEU 1304K l
=
r ATTACHMENT 1 Byron' Station personnel have completed a review of I.E.Bulletin 85-01.
This bulletin raquired that Byron Station develop and implement procedures to:
Monitor fluid conditions within the Auxiliary Feedwater (AF) system on a regular basis, ensuring that the fluid is maintained approximately at ambient temperature.
Ensure recognition of steam binding in the AF pumps and restore the AF system to operable status should steam binding occur, t
The above mentioned two items have been addresced in the attached procedures; Byron Systems Operating Procedure (BOP) 197-A40, and Byron Operating Abnormal Procedure, Unit 1, (IBOA) SEC-12.
These procedures were approved for use in final form on January 22, 1986 and were place into the procedure manuals on January 28,~1986.
BOP 199-A40 is an Equipment Attendant (EA) rounds sheet. This rounds sheet specifically calls for a temperature check of the AF piping at the AF005 valves. The specific step dealing with.the AF005 valve draws attention to Note 1, which states:
"If temperature at any AF005 valve exceeds 130F, then notify S.E.(shift engineer) immediately and enter 1 BOA SEC-12".
This temperature surveillance on the AF005 valves is performed by an EA and
_ reviewed shiftly by the shift foreman and the Nuclear Station Operator (NSO).
i 1 BOA SEC-12 is the procedure entered anytime the temperature of the AF system rises above 130F(AS determined by BOP 199-A40). The express purpcse of this procedure is to" ---provide the actions required to prevent steam binding of Auxiliary Feedwater pumps and potential water hammer of Auxiliary Feedwater piping due to check valve leakage".
These two procedures, BOP 199-A40 and IBOA SEC-12, address and satisfy the issues put forth in Bulletin 85-01.
The training required for these j
procedures will be accomplished by:
I Covering these procedures in the next EA retraining cycle, February 12 to March, 1986.
i Including IBOA SEC-12 in licensed operator required reading and insuring that this reading has been completed by March 28, 1986.
l The implementation of this training'is being tracked by Byron Action Item Record (AIR) #6-86-017.
1304K J
4
-, __ _. - -... _. - _ _~.
____.__.e.
_. ~.. _.. _ _.___
o
.I 180A SEC-1 REV. O AUXILIARY FEEDWATER CHECK VALVE LEAKAGE UNIT 1 j
7 i
A.
PURPOSE l
1 This Procedure provides the actions required to prevent steam j
binding of Auxiliary Feedwater pumps and potential water hammer of auxiliary feedwater piping due to check valve leakage.
B.
SYMPTOMS OR ENTRY CONDITIONS l
l 1.
The following conditions may cause entry into this procedure:
4 a) Auxiliary feedwater piping temperature greater than 130*F.
I b) Steam vapor is released when opening auxiliary feedwater piping high point vent.
I I
i 1
i I
l I
l i
l l
APPROVED JAN 2 21986 l
B. O. S. R.
Page 1 of 4 (0150E/0016E)
REV. O AUXILIARY FEEDWATER CHECK VALVE LEAKAGE 180A SEC-12 UNIT 1 1
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE With this procedure in effect, notify
- the Station Director who will evaluate for GSEP conditions per BZP 200-A1.
i
[
1 CHECK TEMPERING LINE SUBC00 LED:
Go to 1 BOA SEC-ll, LOSS OF TEMPERING LINE SUBCOOLING and return to this procedure when completed.
SUBCOOLED
- c. SG IC-U8003 - GREATER THAN 75 SUBCOOLED
~~~
2 CHECK TEMPERATURE AT AF-004 VALVE (S):
- a. Piping temperature - LESS THAN
- a. Go to Step 3.
130*F 1AF004A l
1AF004B APPROVED JAN 2 21986 B.O.S.R.
Page 2 of 4 (0150E/0016E)
I REV. O AUXILIARY FEEDWATER CHECK VALVE LEAKAGE 180A SEC-12 UNIT 1 ST EP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION DO NOT ISOLATE MORE THAN ONE TRAIN OF AUXILIARY FEEDWATER AT A TIME.
3 ISOLATE AND C00LDOWN AFFECTED LOOP:
- a. Enter Action Statement for Technical Specification 3.7.1.2
- b. Close affected Auxiliary l
Feedwater Pump DSCH Isol Vlv(s) l 1AF13A e
1AF13B e
1AF13C e
1AF13D e
1AF13E e
1AF13F e
IAF13G e
1AF13H
- c. Allow loop to cool for 12 HOURS before continuing with this procedure I
APPROVED JAN 2 21986 B. O. S. R.
Page 3 of 4
'(0150E/0016E)
i l!
REV. O AUXILIARY FEEDWATER CHECK VALVE LEAKAGE 180ASEC-1.'l UNIT 1 1
ST EP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED
- ~
CAUTION STEAM MAY BE PRESENT WHEN OPENING AUXILIARY FEEDWATER PIPING HIGH POINT VENT.
i 4
FLUSH AUXILIARY FEEDWATER PIPING:
- a. Start auxiliary feedwater pump l
per BOP AF-1, STARTUP OF AF PUMP
- b. Throttle flow to SG using AF013 vlv(s) until loop is cool i
- c. Exit LCOAR or repeat steps 2 I
thru 4 for other affected loops
- 1
-END-1 I
i l
i l
l l
\\,
I l
APPROVED JAN 2 21986 B. O. S. R.
Page 4.of 4 (0150E/0016E)
FINAL
383 ELEV HX AISLE, AF READINESS /U-l BOP 193-A40
- DATE:'
Rivicion 5 EQUIPMENT DESCRIPTION SHIFT ONE SHIFT TWO SiiIFT THREE MIN MAX T EXOIANGER AISLE - 383 MIN MAX RCP THER BARR CC RET TEMP 137*
RCP OIL COOLER CC RET TEMP 115*
SEAL HX CC OUTLET TEMP-RM 170*
SEAL HX CV OUTLET TEMP-RM 140*
SEAL HX CC FLOW 250 280 EXCESS LETDOWN HX CC FLOW 275 RCP THER BARR CC RET FLOW 160 180 RCP SEAL INJ FLOW (A) 8 10 RCP SEAL INJ FLOW (D) 8 10 AUX FEED PUMP (READINESS) 1A 1B 1A 1B 1A 1B MIN MAX l
AF PIPING TEMP - AF005 130*F (NOTE 1) l DISCHARGE TEST VALVE -AF004 OPDJ CD RECIRC VALVE - AF022 OPDJ SX RECIRC VALVE - AF024 CLOSE MOTOR / ENGINE OIL LEVELS OK rMP OIL RESERVOIR LEVEL OK SX SUCTION TELLTALE FLOW ZERO DIESEL AF PUMP (READINESS)
MIN MAX GEAR OIANGER OIL LEVEL OK AUX. SX PUMP OIL LEVEL OK FAN GEAR OIL LEVEL OK FULL ENGINE WATER LEVEL (FRONT)
ENGINE LOCAL C/S AUTO READY TO START LIGIT ON CUBICLE COOLER C/S AUTO DAY TANK LEVEL ***
19.5*4 100%
BOS DC-25 COMPLETE YES SHIFT ONE NOTES SHIFT TWO NOTES SIIIFT THREE NOTES u E 1:
If temperature at any AF005 valve exceeds 130*F, then notify S.E. immediately and enter IBOA Sec-12.
(Final)
APPROVED (3238P)