ML20153C057

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 99900902/85-04 on 851118-22.No Failure to Meet NRC Requirements Noted
ML20153C057
Person / Time
Issue date: 02/13/1986
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Holbrook W
WYLE LABORATORIES
Shared Package
ML20153C061 List:
References
REF-QA-99900902 NUDOCS 8602180243
Download: ML20153C057 (2)


Text

. .. , .

! ' n a neog'o UNITED STATES g

7

  • 8 o NUCLEAR REGULATORY COMMISSION r, a WASHINGTON D. C. 20655

% , , , , ** February 13, 1986 Docket No. 99900902/85-04 Wyle Laboratories Scientific Services and Systems Group ATTN: Mr. W. W. Holbrook, General Manager Eastern Test and Engineering Operations 7800 Governors Drive Huntsville, Alabama 35807 Gentlemen:

This refers to the inspection conducted by Mr. R. Moist of this office on November 18-22, 1985, of your facility at Huntsville, Alabama and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.

The purpose of this inspection was to perform a technical evaluation of your equipment qualification test activities for safety-related equipment and to witnes:1 equipment qualification testing being performed for Tennessee Valley Authority. Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observatiens by the inspector.

Within the scope df this inspection, we found no instance where you failed to meet NRC requirements.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

) 7 ylll~h,Chiefjw Gary G. Zec Vendor Program Branch 86021s0243 PDR GA999  % PDR 2$ E Civision of Quality Assurance, Vendor 99900902 and Technical Training Center Programs Office of Inspection and Enforcement Enclo'sures:

1. Appendix A-Inspection Report No. 99900902/85-04
2. Appendix B-Inspection Data Sheets (2 pages) ggf II il

o Wyle Laboratories February 13,1986'

\ Distribution:

DMB:IE:09 VPB Reading DQAVT Reading.

RVollmer JStone Region I, II UPotapovs RNMoist RHLasky JThomas, D?C GHolahan, NRR

$b \\

SC/VPB:0QAVT fB B :DQAVT VPB:0QAVT RNMoist:tt UPotapovs GG f/f/86 F/b /86 '2f/\gh

>/86

f601

'll