Advises That Guidelines of NUREG-0612 Phase I Will Continue to Be Met as Min.Actions Identified Under Phase II Will Be Implemented Where Addl Protection Considered Appropriate,Per Generic Ltr 85-11
ML20153B939
Person / Time
Site: Peach Bottom  
Issue date: 02/11/1986
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Muller D
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR GL-85-11, NUDOCS 8602180202
Download: ML20153B939 (2)


Text

{{#Wiki_filter:y L PHILADELPHIA ELECTRIC COMPANY 23O1 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 SHIELDS L DALTROFF ELEc n c Pn c son February 11, 1986 Docket No. 50-277 50-278 Mr. Daniel R. Muller, Director BWR Project Directorate #2 Division of Boiling Water Reactor Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

SUBJECT:

Peach Bottom Atomic Power Station NUREG-0612, " Control of Heavy Loads at Nuclear Power Plants"

Dear Mr. Muller:

We have reviewed Generic Letter 85-11, dated June 28, 1985 with respect to the Peach Bottom Atomic Power Station. The generic letter addresses the requirements of NUREG-0612, " Control of Heavy Loads of Nuclear Power Plants", and concludes that implementation of NUREG-0612, Phase I requirements provide sufficient protection such that the risk associated with potential heavy load drops-is acceptably small. The generic letter also concludes, based on the implementation of Phase I, that actions described in NUREG-0612, Phase II regarding the handling of heavy loads are not required to be implemented. However, the letter encourages the implementation of any actions identified in Phase II that the licensee considers appropriate. We will continue to meet, as a minimum, the guidelines of Phase I which will adequately provide the intended level of protection against load drop accidents. As recommended la your letter, PECo is currently reviewing those actions which were identified under Phase II and will implement those actions B602180202 B60211 fA kh: O oss x.+)= N 10uld-$$p6 &?r J

'r f 'iiw Mr. Daniel R.. Muller,. Director February 11, 1986 Page 2 regarding the handling of heavy loads where additional protection is considered appropriate. Consequently, previous commitments to implement Phase II provisions will be modified _on a case-by-case ~ basis as : permitted by Generic Letter.85-11. If you have any questions.or require additional information, please do not hesitate to contact us. Very truly yours, / , -{A cc:- Dr. T. E. Murley, Administrator, Region I, USNRC T. P.' Johnson, Resident Site Inspector ,}}