ML20153B906

From kanterella
Jump to navigation Jump to search
Forwards Semiannual Monitoring Rept,Jan-June 1988 & Rev 2 to Offsite Dose Calculation Manual
ML20153B906
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/23/1988
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20153B910 List:
References
CON-NRC-88-077, CON-NRC-88-77 VPNPD-88-435, NUDOCS 8808310145
Download: ML20153B906 (1)


Text

r s

O Wisconsin Electnc POWER COMPANY 231 W. Michqn Po. Bc4 20h Mho;kee. W 53201 (414) 221-2345 VPNPD-8 8 -4 35 NRC-8 8-07 7 August 23, 1988 U.S. NUCLEAR REGULATORY COMMISSION Document Control Desk Washington, D.C.

20555 Gentlemen:

DOCKET NOS. 50-266 AND 50-301 SEMIANNUAL MONITORING REPORT POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed is the Semiannual Monitoring Report for the Point Beach Nuclear Plant, Units 1 and 2, for the period from January 1 through June 30, 1988.

This report is submitted in accordance with Technical Specification 15.7.8.4.A and contains information regarding plant releases, solid waste shipments, new and spent fuel shipments, environmental monitoring, circulating water system operations, leak testing of sources, and other miscellaneous l

reportable items from this reporting period.

Three copies of this report are provided for your convenience.

We are also required by Technical Specification 15.7.8.4.A.6 to provide a description of changes to the PBNP Offsite Dose Calcu-lation Manual (ODCM) which became effective during the reporting period.

Accordingly, three copies of the manual are provided for your use.

Very truly yours, l

[hV Af 1

C. W. Fay l

Vice President Nuclear Power 39 Enclosures Copies to NRC Regional Administrator, Region III NRC Resident Inspector hhR h6 OK R

A suMm dHkuub,aravavsmae

.