Forwards Safety Evaluation Accepting Proposed Revisions to Quality Assurance Program for Perry Nuclear Power Plant
ML20153B803
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 09/16/1998
From: Pickett D
NRC (Affiliation Not Assigned)
To: Myers L
CENTERIOR ENERGY
Shared Package
ML20153B807 List:
References
TAC-MA3325, NUDOCS 9809230247
Download: ML20153B803 (4)


Text

_. _ _ _ _ ______..

Septunber 16, 1998 Mr. Lew W. Myers Vice President - Nuclear, Perry Centerior Service Company P.O. Box 97, A200 Perry, OH 44081

SUBJECT:

10 CFR 50.54(a)(3) ORGANIZATION CHANGE FOR THE INDEPENDENT SAFETY ENGINEERING GROUP - PERRY NUCLEAR POWER PLANT, UNIT NO.1 (TAC MA3325)

By letter dated July 22,1998 (PY-CEl/NRR-2288L), and supplemented on September 1,1998 l

(PY-CEl/NRR-2316L), pursuant to 10 CFR 50.54(a)(3), FirstEnergy submitted proposed revisions to the quality assurance program for the Perry Nuclear Power Plant (PNPP). The proposed changes include: (1) The reporting point of the Independent Safety Engineering Group (ISEG) will change from the Director, Perry Nuclear Services Department to the Manager, Quality Assurance Section; (2) the ISEG function to review and assess operation and maintenance audits will be transferred to the Company Nuclear Review Board; (3) ISEG membership will be reduced from five to four members, and (4) the ISEG qualifications will be revised. The staff has reviewed the submittalin accordance with 50.54(a) and determined that the changes are acceptable in that the quality assurance program continues to meet the requirements of Appendix B of 10 CFR Part 50.

The staff's safety evaluation is enclosed.

Sincerely, Original signed by:

Douglas V. Pickett, Senior Project Manager Project Directorate Ill 3 Division of Reactor Projects ill/IV I

/

Office of Nuclear Reactor Regulation Distribution:

Docket No. 50-440 PUBLIC EAdensam BBoger

/)h

Enclosure:

as stated PDlll-3 r/f RBellamy cc: see next page SBlack GGrant, R3 DOCUMENT NAME: G:\\ PERRY \\MA3325.LTR To receive a copy of this document, Indicate in the box:

"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy 0FFICE PM:PDQL-b E

LA:PDIII-3 6 BC:HOMB NAME DPickeE' EBarnhillPfy SBlack*

DATE 09/ IW98 09/lb/98 09/08/98 09/ /98 09/ /98

  • See memo from SBlack to RBellamy dated 9/8/98 0FFICIAL RECORD COPY l

l i)~ '^30 l

.. ~

i i

9809230247 900916 PDR ADOCK 05000440 NGC Rtf CENTES COPY

Septanber 16,1998 I

Mr. Lew W. Myers Vice President - Nuclear, Perry Centerior Gervice Company P.O. Box 97, A200 Perry, OH 44081

SUBJECT:

10 CFR 50.54(a)(3) ORGANIZATION CHANGE FOR THE INDEPENDENT SAFETY ENGINEERING GROUP - PERRY NUCLEAR POWER PLANT, UNIT NO.1 (TAC MA3325)

By letter dated July 22,1998 (PY-CEl/NRR 2288L), and supplemented on September 1,1998 (PY-CEl/NRR-2316L), pursuant to 10 CFR 50.54(a)(3), FirstEnergy submitted proposed revisions to the quality assurance program for the Perry Nuclear Power Plant (PNPP). The proposed changes include: (1) The reporting po!nt of the Independent Safety Engineering Group (ISEG) will change from the Director, Perry Nuclear Services Department to the Manager, Quality Assurance Section; (2) the (SEG function to review and assess operation and maintenance audits will be transferred to the Company Nuclear Review Board; (3) ISEG membership will be reduced from five to four members; and (4) the ISEG qualifications will be revised. The staff has reviewed the submittalin accordance with 50.54(a) and determined that the changes are acceptable in that the quality assurance piogram continues to meet the requirements of Appendix B of 10 CFR Part 50.

The staff's safety evaluation is enclosed.

Sincerely, original signed by:

Douglas V. Pickett, Senior Project Manager Project Directorate 111-3 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation Distribution:

Docket No. 50-440 PUBLIC EAdensam BBoger

Enclosure:

as stated PDill 3 r/f RBellamy cc: see next page SBlack GGrant, R3 DOCUMENT NAME: G:\\ PERRY \\MA3325.LTR To receive a copy of this document. Indicate in the box: *C' = Copy without enclosures

  • E" = Copy with enclosures "N' = No copy 0FFICE PM:PDUl-S E

LA:PDIII-3l6 BC:HOMB NAME DPickett' EBarnhill &

SBlack*

DATE 09/ IW98 09/lb/98 09/08/98 09/ /98 09/ /98

  • See memo from SBlack to RBellamy dated 9/8/98 0FFICIAL RECORD COPY

_=.

foneo%

g3 UNITED STATES 4

l 't g1 j

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20046 0001 4

  • * *,d 9

Septmber 16, 1998 i

Mr. Lew W. Myers Vice President - Nuclear, Perry Centerior Service Company P.O. Box 97, A200 Perry, OH 44081

SUBJECT:

10 CFR 50.54(a)(3) ORGANIZATION CHANGE FOR THE INDEPENDENT SAFETY ENGINEERING GROUP - PERRY NUCLEAR POWER PLANT, UNIT NO.1 (TAC MA3325)

By letter dated July 22,1998 (PY-CEl/NRR-2288L), and supplemented on September 1,1998 (PY-CEl/NRR 2316L), pursuant to 10 CFR 50.54(a)(3), FirstEnergy submitted proposed revisions to the quality assurance program for the Perry Nuclear Power Plant (PNPP). The proposed changes include: (1) The reporting point of the Independent Safety Engineering Group (ISEG) will change from the Director, Perry Nuclear Services Department to the Manager, Quality Assurance Section; (2) the ISEG function to review and assess operation and maintenance audits will be transferred to the Company Nuclear Review Board; (3) ISEG membership will be reduced from five to four members; and (4) the ISEG qualifications will be revised. The staff has reviewed the submittal in accordance with 50.54(a) and da'rmined that the changes are acceptable in that the quality assurance program continues ta mec, the s

requirements of Appendix B of 10 CFR Part 50.

The staff's safety evaluation is enclosed.

Sincerely, QV M

Douglas V. Pickett, Senior Project Manager Project Directorate 111-3 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosure:

as stated cc: see next page l

f L. Myers Perry Nuclear Power Plant, Units 1 and 2 Centerior Service Company cc:

Mary E. O'Reilly James R. Williams l

FirstEnergy - A290 Chief of Staff 10 Center Road Ohio Emergency Management Agency Perry, OH 44081 2855 West Dublin Granville Road Columbus, OH 43235-7150 Resident inspector's Office U.S. Nuclear Regulatory Commission Mayor, Village of Perry P.O. Box 331 4203 Harper Street l

Perry, OH 44081-0331 Perry, OH 44081 Regional Administrator, Region Ill Radiological Health Program U.S. Nuclear Regulatory Commission Ohio Department of Health I

801 Warrenville Road P.O. Box 118 l

Lisle, IL 60532-4531 Columbus, OH 43266-0118 l

l l

Sue Hiatt Ohio Environmental Protection i

OCRE Interim Representative Agency 8275 Manson DERR-Compliance Unit Mentor, OH 44060 ATTN: Mr. Zack A. Clayton P.O. Box 1049 Henry L. Hegrat Columbus, OH 43266-0149 l

Regulatory Affairs Manager Cleveland Electric Illuminating Co.

Chairman l

Perry Nuclear Power Plant Perry Township Board of Trustees P.O. Box 97, A210 3750 Center Road, Box 65 Perry, OH 44081 Perry, OH 44081 i

FirstEnergy Corporation State of Ohio L

Michael Beiting Public Utilities Commission l

Associate General Counsel East Broad Street 76 S. Main Columbus, OH 43266-0573 l

Akron, OH 44308 William R Kanda, Jr., Plant Manager Mayor, Village of North Perry Cleveland Electric illuminating Co.

l North Perry Village Hall Perry Nuclear Power Plant 4778 Lockwood Road P.O. Box 97, SB306 North Perry Village, OH 44081 Perry, OH 44081 Donna Owens, Director Ohio Department of Commerce Division of Industrial Compliance i

Bureau of Operations & Maintenance 6606 Tussing Road a

P. O. Box 4009 Reynoldsburg, OH 43068-9009 o

I 1