l 44 UNITED STATES 9"o NUCLEAR REGULATORY COMMISSION l
.y g
o REGION lli t
'{
801 WARRENVILLE ROAD I
i-a' LISLE. ILLINOIS 60532-4351
- %******/
1 September 15, 1998 i
l Mr. Walter G. Mah'And IV l
Senior Vice Presidein Clinton Power Station Illinois Power Company.
Mail Code V-275 i
P. O. Box 678 Clinton,IL 61727
Dear Mr. MacFariand:
On July 14,1998, NRC forwarded a revised Restart Action Plan to Illinois Power (IP), which I
was developed in accordance with NRC Inspection Manual Chapter (MC) 0350, " Staff Guidelines for Restart Approval." The Action Plan included a summary of the major activities that have taken place since July 1997, a listing of the membership of our Site Performance l
Improvement and Restart Oversight Panel, and a Case Specific Checklist specifying the items l
that the NRC considers as necessary to be addressed prior to plant restart. Since that time, I i
have determined that, due to regional workload considerations, a change to our panel membership was necessary to ensure the activities leading to the restart of Clinton Power l
Station (CPS) receive the appropriate senior regional management attention. Therefore, I have named Marc L Dapas, Deputy Director, Division of Reactor Projects, as the new Site Improvement and Restart Oversight Panel Chairman.
On May 28,1998, the results of the latest P: ant Performance Review of CPS were forwarded to you. Included in that letter was a listing of the NRC inspection plans leading to plant restant.
As requested by you in a September 9,1998, letter to NRC, the NRC Inspection Procedure
- 40500 inspection has been delayed until November 2,1998. In addition, we have included in our inspection plans a review of the System Design Functional Validation effort and followup
/
I engineering activities conducted by your staff. The new inspection plan is enclosed. Further,
/
the format for the Case Specific Checklist matrix enclosed with our July 14,1998, NRC Restart -
t Action Plan has been revised to incorporate information addressing closure status of each item._ The matrix is also enclosed and will be updated as necessary, i
L M 9220288 930915 i
-hDR ADOCK 05000461 I
PDR j
W. MacFarland In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its enclosuras will be placed in the NRC Public Document Room.
Please contact me if you have any questions conceming this issue.
Sincerely,
_j origina.L signed by James L. Caldwell Acting Regional Administrator Docket No.: 50-461 License No.: NPF-62
)
Enclosures:
As stated cc w/encis:
G. Hunger, Station Manager R. Phares, Manager, Nuclear Safety and Performance improvement J. Sipek, Director-Licensing N. Schloss, Economist Office of the Attomey General G. Stramback, Regulatory Licensing Services Project Manager General Electric Company Chairman, DeWitt County Board State Liaison Officer Chairman, Illinois Commerce Commission DOCUMENT NAME: G:\\ CLIN \\lNSPLNEN.109 To receive e copy of this document, indicato in the box "C" = Copy without attachment / enclosure *E" = Copy with attachment /onclosure *W = No copy OFFICE Rlli F, NRR 6
Rill yA bl Rlll
/
Rll! /
l NAME Kozak/nh f%. BellamyT@ GrotdN Dapas M /
Cakkvell DATE 09/s/98 09/g/98 il4dser09/16/98 09////98 Of/iM8
~
OFFICIAL RECORD COPY
e
- [
I W. MacFarland l J
Distribution:
Project Mgr., NRR w/enci j
J. Caldwell, Rlll w/enci C. Pederson, Rlli w/enct B. Clayton, Rlli w/ encl SRI Clinton w/enci DRP w/enci TSS w/enci DRS (2) w/ encl Rill PRR w/enci PUBLIC IE-01 w/enci :
1 Docket File w/ encl i
GREENS i
LEO (E-Mail) i i
DOCDESK (E-Mail) i t
.0!.0087 i
-j
I CUNTON INSPECTION / ACTIVITY PLAN IP - Inspection Procedure T1-Temporary Instruction Core inspection - Minimum NRC Inspection Program (mandatory all plants)
INSPECTION /
TITLE /
NUMBER OF NRC PLANNED TYPE OF INSPECTION /
ACTIVITY PROGRAM AREA INSPECTORS /
DATES ACTIVITY-COMMENTS INDIVIDUALS IP 37550 Engineering and Technical 6
9/14-10/02/98 Coreinspection; to Support inspection (E&TS)
Onsite weeks 9/14 review calculation and and 9/28 setpoint program,50.59 safety evaluations, electrical restart open items, circuit breakers.
IP 83750 Radiation Protection 1
9/21-25/98 RegionalInitiative IP 82701 Emergency Preparedness 1
10/05-09/98 RegionalInitiative to review emergency response organization capabilities Fire Protection / Safe 4
10/12-30/98 RegionalInitiative to verify Shutdown Inspection Onsite wee (s of 10/12 safe shutdown and 10/26 capabilities 1
Safety System Engineering 5
10/19-11/06 RegionalInitiative to i
Inspection (SDFV Followup)
Weeks of 10/19 and review design verification 11/02 project x
a
O
+
INSPECTION /
TITLE /
NUMBER OF NRC Pl.ANNED TYPE OF INSPECTION /
ACTIVITY PROGRAM AREA INSPECTORS /
DATES ACTIVITY-COMMENTS INDIVIDUALS IP 40500 E'.fectiveness of Ucensee 3
11/02-20/98 Regionalinitiative to Controls in Identifying, Onsite weeks of 11/02 review response to DFl Resolving, and Preventing and 11/16 and new corrective achon Problems /Onsite program Engineering IP 62706 Maintenance Rule Followup The scope and nu'nber 11/16-20/98 RegionalInitiative to ofinspectors forthis reviewimprovement inspection are to be efforts in risk assessment determined.
and maintenance rule i
implementation IP 82701 Emergency Preparedness 3
11/16-20/98 Regionalinitiative to l
review Operational Readiness 5
11/30-12/04/98 Regionalinitiative to inspection review conduct of operations in the control room; and deferred condition reports, preventative and corrective maintenance items.
2, l
1
~-
v-
+ - - -
m
4 f
CLINTON RESTART PLAN: CASE-SPRIFIC CHECKLIST MATRIX DESCRIPTION RESTART LICENSEE RESPONSIBLE DATE ITEM NUMBER PLAN ACTION ORGANIZATION /
CLOSED /
REFERENCES STATUS INSPE ON MECHANISM i.
Management and Supervision 1.1 Estabnsh and implement Management Embui.
Root cause from the OPEN Resident staff NRC Safety Evaluation Team (SET) Report CPS Plan For ExceGence (PFE) Summary Section 2.1.
II.
Conduct of Operations
- 11. 1 Establish and implement Contantang Operator Tra.ning EnW&k9 NRC inspects OPEN Residentstaff and TS Adherence'Know8 edge aryl RecognRion of Degraded Conditions Repo ts 97022 DRS Operations 97025, and 98003.
Evaluation PFE Summary Sections 2.2 and 2.4.
- 11. 2 Estabhsh and Implement an Effective Equ+pment Clearance Program NRC Inspection CLOSED Resident staff Report 97019.
II.3 Rev:ew and Revise Abnormat Operstms Sectms of Operations NRC Letter dated OPEN Residertstaff and June 9,1997, DRS Operations
- 1mposition of Civ8 Evaluation PenaRy? NRC Inspection Report 98003. PFE Summary Section 2.2.
- 11. 4 EstatAish and implement an Effective Risk Assessment Program NRC inspection OPEN DRS Maintenance Report 97022. PFE Rule Follow-up Summary Section 2.2 and 2.4.
Ill.
Corrective Actions 111. 1 Establish and Implement Actes to Achieve and Sustain improvement Demand For OPEN DRS 4)S00 in the Corrective Action Program Information (DFI)
Inspectm item 1. SET Report PFE Summary 2.3.
1 l.lCENSEE RESPONSIBLE DATE DESCRIPTION RESTART ITEM ACTION ORGANIZATION /
CLOSEDI NUMBER PLAN RF.FERENCES STATUS INSPE ON MECHANISM 111. 2 Estabhsh and implement Performance Measures To Assess DFIItem 1. SET CLOSED Resident Staff
'teport. PFE Performance e
1 Summary 2.3.
IV.
Structures, Systems, and Components (SSCS) Operational Readiness IV 1 Estat*sh Program to Reduce and Maintain Main Control Room Confirmatory Action OPEN Ressdent S'aff Derciencies Letter RlW97-001.
NRC Inspection Report 98003. PFE Summary Section 2.4.
IV.2 Provide Reasonable Assurance that Defcsencies Affecting Safety DFIItem 2. PFE OPEN Resident Staff and Related SSCs Have Been Identified and Corrected.
Summary DRS 40500 inspection Section 2.3.
IV.3 Resolve issues Associated With Circuit Breaker Failures Co.u';n. 6 y Action OPEN DRS AIT Follow-up Letter Rl497-009.
PFE Summary Section 2.4.
IV.4 Resolve Degraded Voltage and Electrical Distributm Concems NRC Inspecten OPEN DRS-SSEl Report 97012. PFE Summary Section 2.4.
IV.5 Resolve Fire Protection Safe Shutdown Concems SET Report. PFE OPEN DRS - Fire Protection Summary inspecton Secticn 2.4.
IV.6 Comp'ete Root Cause Analysis of Recirculation Pump Seal Failures PFE Section 2.4.
CLOSED Resident staff and Develop Field Performance Meesures NRC Inspection Report 97012.
IV.7 Resolve EDG Concems SET Report.
OPEN Resident staff V.
Maintenance V.1 Develop Procer.s to Rev6ew Deferrata of Preventive Maintenance SET Report. PFE OPEN Resident staff items.
Summary Section 2.4 V.2 Provide Reasonable Assurance that Qualified Materials and Parts are LERs 98001 and OPEN Resdent staff installed in Plant Systems 98004, NRC Inspection Report 97020.
V.3 Establish Mamtenance Rule Program PFE Sur9 mary CLOSED DRS - Maintenance Section 2.4.
Rule Follovsrp trspection 2
O O
ITEM DESCRIPTION RESTART
.ICENSEE RESPONSIBLE DATE NUMBER PLAN ACTION ORGANIZATION /
CLOSEDI INSPE ON MECHANISM REFERENCES STATUS VI.
Design and Configuration Control VI.1 Provide Reesonable Assurance That Safety Related SSCs Will SET Report. PFE OPEN DRS - E&TS and SSEI Perform Their Intended Safety F::nctions as Described in the Design Summary Section and Ucensing Basis 2.4. System Design and Functional Vandation (SDFV)
Prognm V12 Vandate the Adequacy and Control of Calculations SET Report. SDFV OPEN DRS - E&TS and SSEI Program VI.3 Validate the Adequacy and Control of the Setpomt Program SET Report. SDFV OPEN DRS-E&TS and SSE1 Program Vll.
Emergency Preparedness Program Vti.1 Develop and implement EP Improvement initiatrves NRC Inspection OPEN Ressdent staff and Report 98003,97022 DRS -EP Impx: tion Vill.
Licensing Actions Vllt.1 Develop a Ust and Schedule for Anticipated Ucenseg Action General OPEN None Required Submittats Affecting Plant Restart 3
.