Forwards Rev 1 to Ampacity Evaluation Program Plan, Which Includes Attachment 1 Inadvertently Excluded from Submittal
ML20153A990
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 07/07/1988
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20153A995 List:
References
NUDOCS 8807120675
Download: ML20153A990 (3)


Text

-.

+

(s'

_is TENNESSEE VALLEY AUTHORITY CH ATTANGOGA. TENNESSEE 374o1 r

SN'157B Looko'tt Place JUL 071988 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 Centlemen:

In the Matter of

)

Docket Nos. 50-259 Tennessee Valley Authority

)

50-260

)

50-296 BROWNS FERRY UUCLEAR PLANT (BFN) - AMPACITY EVALUATION PROCRAM PLAN - REVISION 1 By my letter dated June 24, 198a, TVA submitted BFN's ampacity evaluation program plan, revision 1.

Attachment of that plan was inadvertently excluded from the submittal. By this letter ws ce forwarding a copy of revision 1 which includes that attachment. Also, to aid your review, changes in the ampacity evaluation-program plan from revision 0 are denoted by vt.:rtical bars in the margin of the enclosed revision 1.

Ac stated in my June 24 letter revision 1 supersedes revision 0 submitted January 25, 198G. Revision 1 incorporates the results of the April 26 meeting at BFN between TVA and NRC.

Specifically, the program plan was updated and presently reflects a 40 year full life, as opposed to reduced life of unit 2 safety-related cables and describes a modified approach to verification of the V3 cables. A summary statement of commitments contained in this submittal is provided.

Since this item,is schedule sensitive, TVA is proceeding with its implementation, concurrent with your tion of the safety evaluation-report.

TVA will be glad to discuss this fith you.

Should you have any qw,.+1ons, please telephone M. J. May at (205) 729-3570.

Very truly yours, TENNESSEE VALLEY AUTHORITY h.

R ridley', Director Nuclear Licensing and Regulatory Affairs Enclosur^s 0W cc: See page 2 i

I

\\

8807120675 880707 l

PDR ADOCK 03000259 P

PNU w

An Equal Opportunity Employer

-\\

c-

\\

\\.

U.S. Nuclear Regulatory Commission'

.JUL 0 71988 s

Enclosures cc (Enclosures):

Ms. S. C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852.

Mr. F. R. McCoy, Assistant Director for' Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II A

101 Marietta Street,'NW, Suite 2900 Atlanta, Georgia 30323 Browns Ferry Resident Inspector Browns Ferry Nuclear Plant Route 12, P. O. Box 637 Athens, Alabama 35611 W

l

ENCLOSURE AMPACITY EVALUATION PROGRAM PLAN

  • REVISION 1

SUMMARY

STATEMENTS OF COMMITMENTS 1)

Safety-related cables not having a remaining life of 26 years operation af ter restart will~ be replaced before restart of unit. 2.

12 )

Safety-related cable will not operate greater than its qualified (E

maximum temperature rating (if an EQ cable) or its manufacturer's I'

rating.

3)

TVA'will ensure the raceway configuration by a maintenance program.

4)

The Browns Ferry Nuclear Nuclear Performance Plan and the 1989 Final l

Safety Analysis Report update will be revised to reflect the program described.