ML20153A883

From kanterella
Jump to navigation Jump to search
Informs That Commitment Due Date Has Been Revised to 981115, in Order to Complete Supporting Documentation for Rev to TS Figure 2.2.1 to USAR (Figure VII-1-10).Commitment Made in 980723 Response to NOV Re Insp Rept 50-298/98-02
ML20153A883
Person / Time
Site: Cooper 
Issue date: 09/16/1998
From: Swailes J
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-298-98-02, 50-298-98-2, NLS980159, NUDOCS 9809220212
Download: ML20153A883 (3)


Text

. w H

~

Nebraska Public Power District Nebmska's Energy Leader September 16,1998 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Extension of Commitment Date NRC Inspection Report No. 50-298/98-02 Cooper Nuclear Station, NRC Docket No. 50-298, DPR-46

Reference:

1.

Letter NLS980094 to Document Control Desk (USNRC) from J. IL Swailes (NPPD) dated July 23,1998," Reply to a Notice of Violation, NRC Inspection Report No. 50-298/98-02, Cooper Nuclear Station, NRC Docket 50-298, DPR-46" Gentlemen:

By letter dated July 23,1998 (Reference 1), the Nebraska Public Power District (District) replied to a Notice of Violation, NRC Inspection Report No. 50-298/98-02. Therein, the District made a commitment,"The Improved Technical Specification [TS] implementation team identified changes that are needed to correct TS Figure 2.1.1, which is being relocated to the USAR. These changes will be completed by September 16,1998, following relocation to the USAR." The District has relocated TS Figure 2.1.1 to the USAR (Figure VII-1-10). However, the District has identified that a revision to this figure requires additional time to complete the supporting documentation. Also, the District determined that the revision to USAR Figure VII-1-10 should be completed concurrently with another commitment," Options for clarifying action levels on the fuel zone level instrumentation and defining Top of Active Fuel (TAF) for the purposes of Emergency Operating Procedures (EOP) implementation will be evaluated. The needed changes will be implemented by November 15,1998" (Reference 1). Accordingly, the District is informing the NRC that tae commitment due date has been revised to November 15, 1998.

I Should you have any questions or comments, please contact me.

j s!l Sincerely, 9809220212 980916 f

PDR ADOCK 05000298

/

G PDR 2 7 gi j 6,L N

Jo.

11. Swailes Vi !c sident of Nuclear Energy Cooper Nudear Station P.O. Box 98/ Brownville, NE 68321-0098 Telephone: (402) 825-3811/ Fax: (402) 825 5211 http //www nppd com

.. = _

NLS980159 -

September 16,1998 Page 2 of 2

/rss'

. Attachment

cc:

Regional Administrator w/ attachment USNRC Region IV j

NRC Resident Inspector w/ attachment 3

Cooper Nuclear Station i

i Project Manager - Cooper w/ attachment USNRC-NRR NPG Distribution w/o attachment i

,.4

,s' l

ATTACHMENT 3 LIST OF NRC COMMITMENTS l

Correspondence No:NLS980159 i

The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District.

They are described to the NRC for the NRC's information and are not regulatory commitments.

Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

l COMMITTED DATE COMMITMENT OR OUTAGE The Improved Technical Specification implementation team identified changes that are needed to correct TS Figure N vember 15, 1998 2.1.1, which is being relocated to the USAR.

These changes will be completed by November 15, 1998, following relocation to the USAR l

l 1

l PROCEDURE NUMBER 0.42 l

REVISION NUMBER 6 l

l