ML20151Y825

From kanterella
Jump to navigation Jump to search
Forwards Groundwater Monitoring Program,Jul-Dec 1985, Per SER Confirmatory Item 5.Program Provides Addl Data on water-table for Assessing Probable Max Design Basis Water Level & Includes water-level Fluctuations W/Rainfall
ML20151Y825
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/06/1986
From: Bailey J
GEORGIA POWER CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20151Y831 List:
References
GN-796, NUDOCS 8602130176
Download: ML20151Y825 (2)


Text

-

Georgia Power Company

! Project Management s Rout)2. Box 299A

  • Waynesbora Georgia 30830 Telephone 404 7244114 A 404 554-9961 ,

Southern Company Services, Inc.

Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 Vogtie Proj.ect February 6, 1986 Director of Nuclear Reactor Regulation File: X7BC35 Attention: Mr. B. J. Youngblood Log: GN-796 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PIANT - UNITS 1 AND 2 SER CONFIRMATORY ITEM 5: GROUNDWATER MONITORING PROGRAM

Dear Mr. Denton:

Transmitted herewith are 5 copies of the initial 6-months report (July-December 1985) of the VEGP Ground-Water Monitoring Program. The program was implemented in July 1985 at the request of your staff to provide additional data on the water-table for assessing the probable maximum design-basis ground-water level. In addition, piezometers have been installed in the Blue Bluff marl to determine the pressure distribution throughout the mari.

This report presents the results of the first six months of monitoring and includes precipitation records to provide an assessment of water-level fluctuations with rainfall. Pletae note that on page 9 of this report a recommendation has been made to reduce the frequency of monitoring selected wells in the water-table aquifer; your staff's concurrence is requested to implement this recommendation.

If you have any questions or desire additional information, please contact me.

S cerely, J. A. Bailey Project Licensing Manager JAB /chg Attachment

[

9602130176 96 g24 PDR ADOCK O PDR 8I R

n 1

I r

4 a

Mr. B. J. Youngblood ,

February 6, 1986 Page 2 ,

xc: R. E. Conway G. Bockhold, Jr.

R. A. Thomas T. Johnson J. E. Joiner, Esquire D. C. Teper (w/o attachment) -

B. W. Churchill, Esquire L. Fowler (w/o attachment)

M. A. Miller (2) W. C. Ramsey B. Jones (w/o attachment) Vogtle Project File L. T. Gucwa _,

0053V ' b' L'

k-g M

hm h.

I i

_ _ . . . ~ .

p.- __ ,- .,_m_.__