ML20151Y544
| ML20151Y544 | |
| Person / Time | |
|---|---|
| Site: | Byron, Braidwood, 05000000 |
| Issue date: | 08/05/1988 |
| From: | Muller D Office of Nuclear Reactor Regulation |
| To: | Commonwealth Edison Co |
| Shared Package | |
| ML20151Y549 | List: |
| References | |
| NPF-37-A-022, NPF-66-A-022, NPF-72-A-011, NPF-77-A-011 NUDOCS 8808260442 | |
| Download: ML20151Y544 (14) | |
Text
.
~
- pga asag'o UNITED STATES g
8 NUCLEAR REGULATORY COMMISSION o
W ASHINGTON, D. C. 20555 r
,**.j COMMONWEALTH EDISON COMPANY DOCKET NO. 50-454 BYRON STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 22 License No. NPF-37 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Comonwealth Edison Company (thelicensee)datedJanuary 12, 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confonnity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-37 is hereby amended to read as follows:
$0$$Offy05 Pk$A
' (2) Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 22 and the Environment Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION flb. N yor Daniel R. Muller, Director Project Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects
Attachment:
Changes to th*3 Technical Specifications Date of Issuance: August 5, 1988
~#
o,,
UNITED STATES
[
g NUCLEAR REGULATORY COMMISSION j
g j
WASHINGTON, D. C. 20555 g,...../
I COMMONWEALTH EDISON COMPANY DOCKET NO. 50-455 BYRON STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 22 License No. NPF-66 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Comonwealth Edison Company (thelicensee)datedJanuary 12, 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter 1; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-66 is hereby amended Io read as follows:
n (2) Technical Specifications TheTechnicalSpecificationscontainedinAppendixA(NUREG-1113),
as revised through Amendment No. 22 and revised by Attachment 2 to NPF-60, and the Environmental Protection Plan contained in Appendix B, both of which were attached to License No. NPF-37, dated February 14, 1985, are hereby incorporated into this license.
, contains a revision to Appendix A which is hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance.
FOR T NUCLEAR REGULATORY COMMISSION
$0V Daniel R. Muller, Director Project Directorate III-2 Division of Reactor Projects - III.
IV, Y and Special Projects
Attachment:
Changes to the Technical Specifications Date of Issuance:
August 5, 1988 i
ATTACHMENT TO LICENSE AMENDMENT NOS. 22 AND 22 FACILITY OPERATING LICENSE NOS. NPF-37 AND NPF-66 DOCKET NOS. 50-454 AND 50-455 Revise Appendix A as follows:
Remove Pages Insert Pages 3/4 3-58 3/4 3-58 3/4 3-60 3/4 3-60 d
4
TABLE 3.3-12 gg RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION E
MINIMUM CHANNELS c
g5 INSTRUMENT OPERABLE ACTION w
((
1.
Radioactivity Monitors Providing Alarm and Automatic Termination of Release os a.
Liquid Radwaste Effluent Line (ORE-PR001) 1 31 b.
Fire and Oil Sump Discharge (ORE-PR005) 1 34 c.
Condensate Polisher Sump Discharge (ORE-PR041) 1 34 r
2.
Radioactivity Monitors Providing Alarm But Not Providing Automatic Termination of Release a.
Essential Service Water w
3
Station Blowdown Line (ORE-PR010) 1 32 h
3.
Flow Rate Measurement Devices a.
Liquid Radwaste Effluent Line (Loop-WXD01) 1 33 x
[
b.
Liquid Radwaste Effluent Low Flow Line (Loop-WX630) 1 33 O
c.
Station Blowdown Line (Loop-CWO32) 1 33 M
TABLE 4.3-8
~
g RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS E
DIGITAL ANALOG c
CHANNEL CHANNEL 5
CHANNEL SOURCE CHANNEL OPERATIONAL OPERATIONAL g
INSTRUMENT CHECK CHECK CALIBRATION TEST TEST 1.
Radioactivity Monitors Providing e.
Alarm and Automatic Termination u
of Release a.
Liquid Radwaste Effluent Line (ORE-PR001) D P
R(3)#
Q(1)
N.A.
b.
Fire and Oil Sump Discharge (ORE-PR005)
D M
R(3)
Q(1)
N.A.
c.
Condensate Polisher Sump Discharge D
M R(3)
Q(1)
N.A.
(ORE-PR041) 2.
Radioactivity Monitors Providing Alarm But Not Providing Automatic Termination of Release R
a.
Essential Service Water Y
- 1) Unit 1 R(3)f Q(2)
N.A.
a) RCFC 1A and 1C Outlet (1RE-PR002)
D M
b) RCFC IB and ID Outlet (1RE-PR003)
D M
R(3)
Q(2)
N.A.
- 2) Unit 2 R(3)f Q(2)
M.A.
a) RCFC 2A and 2C Outlet (2RE-PR002)
D M
b) RCFC 2B and 2D Outlet (2RE-PR003)
D M
R(3)
Q(2)
N.A.
g b.
Station Blowdown Line (ORE-PR010)
D M
R(3)#
Q(2)
N.A.
Eg 3.
Flow Rate Measurement Devices E
a.
Liquid Radwaste Effluent Line g
(Loop-WX001)
D(4)
N.A.
R N.A.
Q b.
Liquid Radwaste Effluent Low Flow Line M
(Loop WX630)
D(4)
N.A.
R N.A.
Q c.
Station Blowdown Line (Loop-CWO32)
D(4)
N.A.
R N.A.
Q l
j
p RfC j
/
o UNITED STATES 8'
~,,
NUCLEAR REGULATORY COMMISSION c
i WASHINGTON, D. C. 20555 COMMONWEALTH EDISON COMPANY DOCKET NO. 50-456 BRAIDWOOD STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 11 License No. NPF-72 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The applicaticn for amendment by Comonwealth Edison Company (the licensee) dated January 12, 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activitics will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-72 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 11 and the Environment Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION 4or Daniel f. Muller, Director Project Directorate III-2 Division of Reactor Projects - III, IV, Y and Special Projects
Attachment:
Changes to the Technical Specifications Date of Issuance: August 5, 1988
km Rig
/
o,,
UNITED STATES NUCLEAR REGULATORY COMMISSION o
g a
WASHINGTON, D. C. 20566 COMMONWEALTH EDISON COMPANY DOCKET NO. 50-457 BRAIDWOOD STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 11 License No. NPF-77 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Comonwealth Edison Company (thelicensee)datedJanuary 12, 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reascuable assurance (1) that the activities euthorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in cornpliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-77 is hereby amended to read as follows:
~
e a
. (2) Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 11 and the Environment Protection Plan contained in Appendix B both of which are attached to License No.
NPF-72, dated July 2,1987, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION flb.
A for Daniel R. Muller, Director Project Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects
Attachment:
Changes to the Technical Specifications Date of Issuance: August 5,1988 1
ATTACHMENT TO LICENSE AMEN 0 MENT NOS.11 AND 11 FAC.!LITY OPERATING LICENSE NOS. NPF-72 AND NPF-77 DOCKET NOS. 50-456 AND 50-457 Revise Appendix A as follows:
Remove Pages Insert Pages 3/4 3-60 3/4 3-60 l
3/4 3-62 3/4 3-62 i
O TA8LE 3.3-12 C
RADI0ACifVE LIQUID EFFLUENT MONITORING INSTRtMENTATION
~
MINIMUM CHANNELS INSTRUMENT OPERABLE ACTION 31.
Radioactivity Monitors Providing Alam and Automatic Termination of Release y
[
a.
Liquid Radwaste Effluent Line (ORE-PR001) 1 31 b.
Fire and Oil Sump (ORE-PR005) 1 34 c.
Condensate Polisher Sump Discharge (ORE-PRO 41) 1 34 2.
Radioactivity Monitors Providing Alarm But Not Providing f.utcoatic Termination of Release
,s
[
a.
Essential Service Water
b.
Station Blowdown Line (02E-PR010) 1 32 h
3.
Flow Rate Measurement Devices E
]
a.
Liquid Radwaste Effluent Line (Loop-WX001) 1 33 o
b.
Liquid Radwaste Effluent Low Flow Line (Loop-WX630) 1 33 c.
Station Blowdown Line (Loop-CWO32) 1 33
1 TABLE 4.3-8 l
RADI0 ACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS l
DIGITAL ANALOG o
CHANNEL CHANNEL CH.'.NNEL SOURCE CHANNEL OPERATIONAL OPERATIONAL
[
INSTRUMENT CHECK CHECK CALIBRATION TEST TEST z
]
1.
Radioactivity Monitors Providing Alarm and Automatic Termination
[
of Release
~
a.
Liquid Radwaste Effluent Line (ORE-PR001) D P
R(3)#
Q(1)
N.A.
b.
Fire and Oil Sump Discharge (GRE-PR005)
D M
R(3)
Q(1)
M.A.
c.
Condensate Polisher Sump Discharge D
M R(3)
Q(1)
M.A.
(ORE-PR041) g 2.
Radioactivity Monitors Providing Alarm But Not Providing Automatic Termination
{
of Release
{
a.
Essential Service Water
D M
Ri3),
Q(2)
N.A.
b) RCFC 18 and ID Outlet (1RE-PR003)
D M
R(3;r Q(2)
N. A.
D M
2(3)#
Q(2)
N.A.
b) RCFC 2B and 20 Outlet (2RE-PR003) 0 d
R(3)#
Q(2)
N.A.
b.
Station Blow < town Line (ORE-PRO 10)
D M
R(3)#
Q(2)
Is. A.
3.
Flow Rate ;4easurement Devices z
a.
Liquid Radwaste Effluent Line (Loop-WX001)
D(4)
N.A.
R#
W.A.
Q b.
Liquid Radwaste Effluent Low Flow Line (Loop WX630)
D(4)
N.A.
R N.A.
Q d
c.
Statfor Blowdown Line (Loop-CWO32)
D(4)
M.A.
R N.A.
Q
.,.