ML20151Y478
ML20151Y478 | |
Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 05/03/1988 |
From: | Frye J Atomic Safety and Licensing Board Panel |
To: | PENNSYLVANIA, COMMONWEALTH OF |
References | |
CON-#288-6192 88-569-06-OLA, 88-569-6-OLA, OLA, NUDOCS 8805050017 | |
Download: ML20151Y478 (2) | |
Similar Documents at Peach Bottom | |
---|---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20153G3141998-06-29029 June 1998
[Table view]Transcript of 980629 Public Meeting Re Peach Bottom Unit 1, Decommissioning Status in Delta,Pa.Pp 1-65.Reporter Certificate Encl ML20249B9981998-06-22022 June 1998 Exemption from Requirements of 10CFR70.24 Re Criticality Accident Requirements. Exemption Authorized ML20247M8801998-05-19019 May 1998 Confirmatory Order Modifying Licenses Effective Immediately. PECO Energy Co Shall Complete Final Implementation of Thermo-Lag 330-1 Fire Barrier Corrective Actions at Peach Bottom Atomic Power Station,Units 2 & 3 ML20216G0321998-03-0404 March 1998 Comment Re Draft RG DG-1071, Std Format & Content for Post- Shutdown Decommissioning Activities Rept. Recommends That Draft RG Be Revised to Accommodate Situations Similar to That Described for Unit 1 ML20198J0931997-12-18018 December 1997 Order Approving Application Re Merger Between Atlantic Energy Inc,& Delmarva Power & Light Co ML20113C6631996-06-24024 June 1996 Comments on Proposed Rule 10CFR50 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors ML20115H7061996-06-0404 June 1996 Submits Addl Info to Support Petition for Rulemaking PRM-72-3 Re Amend to SAR ML20083N3971995-04-26026 April 1995 Comment Supporting Proposed GL, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20083C1191995-04-25025 April 1995 Exemption from Requirements of Sections III.D.2(a) & III.D.3 of App J to 10CFR50,which Requires That Type B & C Tests Be Performed During Each Reactor Shutdown for Refueling ML20081B3811995-03-0101 March 1995 Comment Supporting Proposed Suppl 5 to GL 88-20, IPEEE for Severe Accident Vulnerabilities ML20078P9331994-12-0707 December 1994 Exemption Granted from Requirements of 10CFR73.55 Re Returning of Picture Badges Upon Exit from Protected Area Such That Individuals Not Employed by Licensee May Take Picture Badges Offsite ML20073H9821994-09-30030 September 1994 Exemption Granted from Requirements of 10CFR50,App J, Section III.D.1(a) to Perform Type a Tests at Approx Equal Intervals & within 10-yr Svc Period ML20071H0521994-07-0505 July 1994 Exemption from Application of 10CFR50,App J,Sections III.D.2(a) & III.D.3,extending Testing Intervals to Allow Testing to Be Performed During Unit 2 Cycle 10 Refueling Outage ML20059L3201993-11-24024 November 1993 Exemption from Training Requirements of 10CFR50.120 Re Establishment,Implementation & Maintenance of Training Program ML20126F2721992-12-21021 December 1992 Comment Endorsing Positions & Comments of NUMARC & BWROG Re Draft GL, Augmented Inservice Insp Requirments for Mark I & Mark II Steel Containments,Refueling Cavities & Associated Drainage Sys ML20086U1571991-12-26026 December 1991 Exemption Granting One Time Schedular Exemption to Eight SROs Limited to Fuel Handling,To Take First Annual Requalification Operating Test During Jan 1992 Instead of End of 1991 ML20006D3821990-02-0606 February 1990 Comment on Proposed Rule 10CFR2 Re Policy & Procedures for Enforcement Actions;Policy Statement.Util Uncertain as to Whether Changes Necessary ML20006A7871989-08-0707 August 1989 Comment on NUREG-1150, Severe Accident Risks:Assessment for Five Us Nuclear Power Plants. Notes Numerous Places in Rept Where Conclusions Stated or Implied Which Conflict W/Results of Previous Analyses ML20247B6151989-07-19019 July 1989 Memorandum & Order.* Grants Commonwealth of PA Motion Requesting Order Confirming Commonwealth Withdrawal of Petition to Intervene & Proposed Contentions & Terminating Proceeding.W/Certificate of Svc.Served on 890720 ML20246N8071989-06-30030 June 1989 NRC Staff Fourth Status Rept Re Settlement Agreement.* NRC Responded to Agreement,Per Encl ,Advising Licensee That NRC Has No Objection to Agreement Between Licensee & Commonwealth of Pa.W/Certificate of Svc ML20246P2951989-06-29029 June 1989 Notice of Withdrawal & Motion to Terminate Proceeding.* Withdraws 880122 Petition to Intervene & Requests Termination of Proceeding,Per Agreement Between Parties Re Licensee Commitment to Take Actions.W/Certificate of Svc ML20248B4631989-06-0101 June 1989 NRC Staff Third Status Rept Re Settlement Agreement.* Final Agreement Being Prepared,Per 890428 Meeting Resolving Outstanding Issues.W/Certificate of Svc ML20245J2331989-04-28028 April 1989 NRC Staff Second Status Rept Re Settlement Agreement.* Next Status Rept Will Be Filed by 890601.Certificate of Svc Encl ML20247B0641989-04-17017 April 1989 Transcript of 890417 Discussion/Possible Vote in Rockville, MD Re Plant Restart.Pp 1-64.Viewgraphs Encl ML20247A2971989-04-0404 April 1989 Comment Supporting Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20246P6921989-04-0404 April 1989 Requests Party Brief on Support of Appeal of Denial of FOIA Request Re Records of Investigation Into Events Surrounding 870331 Shutdown of Plant ML20248F5411989-03-31031 March 1989 NRC Staff Status Rept Concerning Settlement Agreement.* NRC Informed Commonwealth of PA & Util of Certain Concerns Noted in Review of Settlement Documents Forwarded by .W/Certificate of Svc ML20247A8861989-03-27027 March 1989 Memorandum & Order.* Stays Util Obligation to Respond to Contentions,Per Ongoing Settlement Discussions Between Util & Commonwealth of Pa.Monthly Status Rept Requested.W/ Certificate of Svc.Served on 890327 ML20247A6541989-03-24024 March 1989 Philadelphia Electric Co consented-to Motion to Stay Responses to Commonwealth of PA Proposed Contentions.* Requests That ASLB Stay Util Obligation to Respond to Commonwealth of PA 880824 Contentions.W/Certificate of Svc ML20236B4551989-03-0808 March 1989 Transcript of ACRS GE Reactor Plants Subcommittee 890308 Meeting in Bethesda,Md Re Peach Bottom Restart.Pp 1-129 ML20236B4001989-03-0808 March 1989 Transcript of ACRS GE Reactor Plants Subcommittee 890308 Meeting in Bethesda,Md Re Plant Restart.Pp 130-280. Supporting Documentation Encl ML20235N2611989-02-21021 February 1989 Philadelphia Electric Co consented-to Motion for 30-day Extension to Respond to Commonwealth of PA Contentions.* Requests That Deadline for Response & NRC Response to 880824 Contentions Be Extended by 30 Days.W/Certificate of Svc ML20235J5451989-02-0606 February 1989 Transcript of 890206 Briefing in Rockville,Md Re Status of Plant.Pp 1-49.Supporting Info Encl ML20206L6081988-11-18018 November 1988 Exemption from Schedular Requirements of 10CFR50.54(w) Re Property Insurance Required to Be Carried by Reactor Licensees ML20205R4041988-11-0404 November 1988 Order.* Grants Applicant 881103 Unopposed Motion for 45-day Extension of Time to Respond to Commonwealth of PA Contentions.Served on 881107 ML20205R8161988-11-0303 November 1988 PECO consented-to Motion for 45-day Extension to Respond to Commonwealth of PA Contentions.* Certificate of Svc Encl ML20205Q2061988-10-28028 October 1988 Comment Opposing Petition for Rulemaking PRM 50-52 Re Exemption of Financial Qualifications of Applicants from Review of OL Applications.Petition Presents No Compelling Reason to Amend Current Rules ML20195E6501988-10-24024 October 1988 Comment Supporting Petition for Rulemaking PRM 50-52 Re NRC Reinstatement of Financial Qualifications of Util as Consideration in Operating Licensing Hearings for Electric Utils ML20155F1681988-10-0505 October 1988 Transcript of 881005 Public Meeting in Rockville,Md Re Status of Plant.Pp 1-56.Viewgraphs & Notes Encl ML20155E8931988-10-0303 October 1988 Comment on Proposed Rule 10CFR50.54(w)(5)(i) Re Amending Implementation Schedule for Stabilization & Decontamination Priority & Trusteeship Provisions of Property Insurance Regulations.Nrc Initiated Exemptions Expected Before 881004 ML20154R6491988-09-25025 September 1988 Requests Extension of Comment Period on Proposed Rule 10CFR52 Re Reactor Licensing ML20153H6781988-09-0202 September 1988 Order.* Grants Applicant Unopposed Motion for 60-day Extension of Time to Respond to Commonwealth of PA Contentions.Nrc Also Granted Extension of Time.Served on 880906 ML20153H6901988-09-0101 September 1988 Philadelphia Electric Co Consented to Motion for 60-day Extension to Respond to Commonwealth of PA Contentions.* Certificate of Svc Encl ML20153D0451988-08-24024 August 1988 Supplement to Petition & Statement of Contentions of Commonwealth of Pa.* Requests That Board Grant Petition to Intervene & Request for Hearing on Contentions.Certificate of Svc Encl ML20151U7821988-08-10010 August 1988 Order Modifying License DPR-44,DPR-56,NPF-39 & CPPR-107 for Violations Involving Licensed Operators Sleeping in Control Room,Reading Matls Not Directly Job Related & Otherwise Inattentive to Obligations of License ML20247N7531988-07-28028 July 1988 Petition for Rulemaking PRM-50-53 Requesting NRC Action to Review Undue Risk Posed by BWR Thermal Hydraulic Instability.Nrr Should Issue Order Requiring All GE BWRs to Be Placed in Cold Shutdown for Stated Reasons ML20151G0031988-07-19019 July 1988 Comment on Proposed Rule 10CFR50 Re Cooperation W/States at Commercial Nuclear Power Plants & Other Facilities. Suggests Rev to Policy to Grant Same Rights & Responsibilities to All States within 10 Miles of Plant ML20195D1681988-06-17017 June 1988 Motion for Third Extension of Time in Which to File Contentions.* Commonwealth of PA Requests That Board Grant Addl Extension of Time Until 880824 for Filing of Contentions.Granted for Licensing Board.Served on 880621 ML20196B4521988-06-17017 June 1988 Motion for Third Extension of Time in Which to File Contentions.* Granting of Addl Extension of Time of 60 Days Until 880824 for Filing of Contentions in Matter Requested. W/Certificate of Svc ML20196B9211988-06-0808 June 1988 Comment Supporting Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations 1998-06-29 Category:ORDERS MONTHYEARML20247M8801998-05-19019 May 1998
[Table view]Confirmatory Order Modifying Licenses Effective Immediately. PECO Energy Co Shall Complete Final Implementation of Thermo-Lag 330-1 Fire Barrier Corrective Actions at Peach Bottom Atomic Power Station,Units 2 & 3 ML20198J0931997-12-18018 December 1997 Order Approving Application Re Merger Between Atlantic Energy Inc,& Delmarva Power & Light Co ML20247B6151989-07-19019 July 1989 Memorandum & Order.* Grants Commonwealth of PA Motion Requesting Order Confirming Commonwealth Withdrawal of Petition to Intervene & Proposed Contentions & Terminating Proceeding.W/Certificate of Svc.Served on 890720 ML20247A8861989-03-27027 March 1989 Memorandum & Order.* Stays Util Obligation to Respond to Contentions,Per Ongoing Settlement Discussions Between Util & Commonwealth of Pa.Monthly Status Rept Requested.W/ Certificate of Svc.Served on 890327 ML20205R4041988-11-0404 November 1988 Order.* Grants Applicant 881103 Unopposed Motion for 45-day Extension of Time to Respond to Commonwealth of PA Contentions.Served on 881107 ML20153H6781988-09-0202 September 1988 Order.* Grants Applicant Unopposed Motion for 60-day Extension of Time to Respond to Commonwealth of PA Contentions.Nrc Also Granted Extension of Time.Served on 880906 ML20151U7821988-08-10010 August 1988 Order Modifying License DPR-44,DPR-56,NPF-39 & CPPR-107 for Violations Involving Licensed Operators Sleeping in Control Room,Reading Matls Not Directly Job Related & Otherwise Inattentive to Obligations of License ML20151Y4781988-05-0303 May 1988 Order.* Grants Commonwealth of PA 880422 Motion Seeking 30- Day Extension of Time for Filing Contentions & Amends to Petition to Intervene in Proceeding.Served on 880503 ML20151E9391988-04-0808 April 1988 Memorandum & Order (Setting Deadline for Filing of Contentions).* Alters Deadlines in Section 2.714 (a)(3) & (B) of Order to Provide for Filing of Commonwealth Contentions & Amends to 880425 Petition ML20153E7281988-04-0101 April 1988 Order Appointing Licensing Board to Determine If Commonwealth of PA 880122 Petition Has Identified Issues within Scope of License Amends on Which Hearing Requested. Served on 880401 ML20205R2451987-03-31031 March 1987 Order Suspending Power Operation & Order to Show Cause Re Control Room Personnel Sleeping in Control Room & Otherwise Inattentive to License Obligations ML20215C8741986-12-12012 December 1986 Order Imposing Civil Monetary Penalties in Amount of $200,000 Re Control Room Staff Errors,Resulting in Withdrawal of Control Rod During Reactor Startup in Sequence Different from Step Specified in Control Rod Program ML20209C2541986-03-20020 March 1986 Order Authorizing Restart of Facility.Temporary RCS Leakage Specs Encl ML20077S5421983-09-0101 September 1983 Order Confirming Licensee Commitments on Pipe crack- Related Issues ML20024B4031983-06-24024 June 1983 Confirmatory Order to Install long-term BWR Scram Discharge Sys Mods ML20023D5111983-05-19019 May 1983 Order Extending Time Until 830527 for Commission to Act to Review Intervenor 821227 Petition for Review of ALAB-701 ML20040F1181982-01-19019 January 1982 Order Modifying 810113 Order to Extend Completion Dates Needed for Plant Mods.Order Continues,In Effect,Exemption to General Design Criterion 50 of App a to 10CFR50 ML20039B4911981-12-21021 December 1981 Order Directing Responses of Parties to Intervenors 811218 Submittal to Be Filed & Served on or Before 820201 ML20010F9911981-09-11011 September 1981 Memorandum & order,ALAB-654,that Intervenors Demonstrate Existence of Genuine Issue of Matl Fact Re Any Matters Previously Raised Concerning Environ Signficance of Fuel cycle-related Radon Emissions.Documented Evidence Necessary ML20030B2251981-08-0404 August 1981 Order Granting Extension Until 810818 for Commission to Consider Review of ALAB-640 ML20009D4521981-07-21021 July 1981 Order Extending Commission Time to Consider Whether to Review ALAB-640 to 810804 ML20009B5441981-07-14014 July 1981 Order Granting Extension Until 810721 for Commission to Decide Whether to Review ALAB-640 ML20005B4831981-07-0606 July 1981 Order Extending Commission Time to Review ALAB-640 to 810714 ML19351A0601981-06-22022 June 1981 Order Extending Commission Time to Consider Whether to Review ALAB-640 to 810707 ML20003A4761981-01-13013 January 1981 Order Granting Extended Exemption from General Design Criterion 50 & Directing Licensee to Reassess Suppression Pool Hydrodynamic Loads.Mods Required by 820131 ML19341B2101981-01-0909 January 1981 Order for License Mod,Designing Automatic Dump Sys to Be Independent of Air Pressure Instrumentation for Manual Scram ML19338F3831980-10-0202 October 1980 Order Confirming Util Commitments to Implement Action Re IE Bulletin 80-17 ML20037B6301980-09-19019 September 1980 Revised Order for Mod of License Requiring Timely Submission of Info Previously Requested Re Environ Qualification of safety-related Electrical Equipment ML19338D0841980-08-29029 August 1980 Order for Mod of Licenses DPR-44 & DPR-56 to Add Info Which Fully Responds to NRC Request for Info Re Environ Qualification of safety-related Electrical Equipment.Info Should Be Submitted by 801101 ML19320B3751980-07-0707 July 1980 Order Granting Ecology Action of Oswego Motion to File 800620 Submission Re Generic Radon Issue ML19318B4781980-06-23023 June 1980 Memorandum & Order Advising That Sterling Issue Is No Longer Germane to Consolidated Proceedings Where Radon Issue Is Being Determined.Ecology Action Cause for Late Intervention Must Be Filed by 800702 ML19322E0821980-03-0707 March 1980 Order Directing Applicants to File Findings of Fact & Conclusions of Law by 800428,intervenors by 800528 & NRC by 800612,per Agreement Re Radon Issue.Responses May Be Filed on 800627.Parties May Address ALAB-562 ML19308B4521979-11-29029 November 1979 Order Declining Review of Issues in ALAB-562 & Ecology Action of Oswego Petition for Review.Nepa Issue Re Appropriate Territorial Scope Is Pending in Export Licensing Case ML19263F0541979-11-0202 November 1979 Order Scheduling Hearing on Radon Release Issue for 800226 ML19322A4881979-10-18018 October 1979 Order Granting Extension Until 791109 for NRC to Review ALAB-562 & Petition for Review.Certificate of Svc Encl ML19290A1871979-10-0303 October 1979 Order Directing That Prepared Testimonies of Witnesses Be Filed on or Before 790118.Hearing Shall Commence on 800225 at Location to Be Determined ML19322A4891979-10-0303 October 1979 Order Re Evidentiary Hearing Schedule for Radon Issue,Per ALAB-562.Witness-prepared Testimony Must Be Filed & Served by 800118.Hearing Will Begin on 800225.Certificate of Svc Encl ML19220C7801979-04-25025 April 1979 Notifies of Consolidation of Five Intervenor Groups Re Radon Emissions Issue.Parties Have Until 790525 in Which to File for Summary Disposition ML19224A4001978-12-26026 December 1978 Time within Which Commission May Determine to Review Decision ALAB-509 Is Extended Until 790112 ML19224A3501978-12-21021 December 1978 Grants Motions Seeking Mods in Schedule & Procedures Adopted in Decision ALAB-509.Discusses Implications of Granting Motions on Original Hearing Schedule ML19206A3141978-07-17017 July 1978 Extends Until 780727 Time for Commission Review of ALAB-480. Certificate of Svc Encl ML19220A3741978-06-28028 June 1978 Grants Intervenors Request for Extension Until 780725 in Which to Respond to ALAB-480.Certificate of Svc Encl ML19291B7081977-08-0808 August 1977 Memorandum & Order ALAB-426 Affirming Decisions Over Last Yr Re U Fuel Cycle Rule.Certificate of Svc Encl ML19220D0641977-04-0101 April 1977 Memo & Order Remanding Cases to Aslab in Light of Recently Promulgated Interim Rule on Environ Impacts of U Fuel Cycle. Certificate of Svc Encl ML19210B6251976-11-0505 November 1976 Order Suspending Pending Proceedings in Light of Changed Circumstances 1998-05-19 |
Text
di9 2-D0'. KE i E D
. %kC UNITED STATES OF AMERICA
% MY -3 P12:21 NUCLEAR REGULATORY COMMISSION
- F ric t, e Hw ip <
ATOMIC SAFETY AND LICENSING BOARD U0CKEiiNG J. ">EHVICF.
Before Administrative Judges BRANCH Chairman III,ight John H Frye, Glenn O.
Br Richard F. Cole SERVED N0Y/ -31988 In the Matter of
)
)
Docket Nos. 50-277-OLA c
Philadelphia Electric Company 50-278-OLA
'(Peach Botton Atomic Power
)
ASLBP No. 88-569-06-OLA Station, Units 2 and 3)
)
)
May 3, 1988-ORDER On April 22, the Commonwealth of Pennsylvania filed a motion seeking a thirty day extension of time for the filing of contentions and any amendments to its petition to inter-vene in this proceeding.
Pursuant to a Memorandum and Order of April 8, 1988, these were due on April 25.
In its motion, the Commonwealth indicated that Philadelphia Elec-tric Co. had no objection to its motion, but made no similar represencation with respect to the Staff.
The Board in-quired of Staff and learned that it, too, had no objection.
This order confirms the oral ruling granting the Commonwealth's motion.
In so doing, we wish to make two observations for the guidance of the parties in the future.
First, when requesting an extension of time or similar ruling, the moving party is to indicate in its motion i
ee05050017 000503 DR ADOCK 05000 7
)6 i
r
2
' whether the other parties object to the motion, and, if so, whether they will be filing a response in opposition.
Second, requests for extension of time are to be filed as far in advance of the due date as possible.
It is so ORDERED.
For the Atomic Safety and and Licensing Board 1
T J
Kr E,
III, CHAIRMAN A MI IS TIVE JUDGE Bethesda, Maryland May 3, 1988 s