Text
,
f %YY Q pepy
/H.ec,
~
1 cy o
UNITED STATES
~g I
' NUCLEAR REGULATORY COMMISSION o.
?,
,I wassiNcion. o. c. 20sss FEB 11 1998
%,, *.... f HEMORANDUM FOR:
File FROM:
N. Prasad Kadambi. Project Manager Project Directorate - IV Division of Reactor Projects - 111.
IV. V and Special Projects i
SUBJECT:
MEE11NG WITH THE SOUTH TEXAS PROJECT TO C0hT1 HUE THE SSAT 1hSPECT10N PROCESS.
The Safety Significance Assessement Tea.- (SSAT) conducted a site inspection during the week of January 18. 1988 to determine the safety significance of allegations received from the Government Accountability Project. Some of the questions raised by the allegations required further information from the licensee, with the actual source of the information being Westinghouse.
Subsequent to a telephone conference on February 5. 1988. the licensee was requested to travel to NRC headquarters to present the required infonnation The meeting took place in Room 8 8 11.
The meeting resulted in the following action items on the part of the licensee to provide:
(1)
Additional information and justification of the settlement monitoring program.
(2)
Additional information on the reactor vessel inter-nals analyses.
(3)
Additional justificaiton regarding reactor vessel flange waviness.
(4)
Aoditional infonnation regarding main steam, main feed ano auxiliary feed piping in relationship to the steam generator.
(5)
Adcitional information on the relevance of the Asko analyses to STP.
(6)
Acditional infonnation regarding weld fit-up of the main icop piping to accomodate steam generator tilt.
(7)
. Additional information on timing of the develop-ment of the stiffness matricies with respect to the stress analysis (8)
Additional information on core barrel deformation as a result of the leoge waviness.
(9)
Accitional infonnation regarding affect of steam generator tilt on leak-before-break analysis.
(10)
History on out-of-tolerance on presurizer hug.
The attendsance list is attached.
N. Prasad Kadambi, Project Manager
- I Project Directorate - IV Division of Reactor Projects - 111 IV. Y and Special Projects J. Calvo k cc:
t.. Marsh 8800260370 000000 M'
8f0NG 03 y sekok M
.s NAMES COMPANY TITLES Jack Bailey HL & P Engr. & Lic Mrg 11 Sem Phillips HL & P Lic Engr.
Royce Stapleton Westinghouse Design Engr.
Wayne Harrison 4L & P Supv. Proj. Engr.
Alfredo Lopez Bechtel Supv. Struct. Engr.
Jeff Himler Westinghouse Sr. Structural Engr.
Bruce Lorenz Westinghouse Licensing Richard Coreia NRC
$$AT Team Leader P.T. Kuo NRC/MEB Section Chief S. Hou hRC/MEB Revie'ser P. Milano NRC/E0 SSAT P. Prescott NRC/VIB SSAT Steve Abbott Westinghouse Senior Design Engr.
Brad Maurer Westinghouse Sr. Engr. Nuclear Safety Budoy Middlebrooks Westinghouse Sr. Engr. Structurai T.H. Lin Westinghouse Fellow Engr.. GTSD K.C. Chang Yestinghouse/HL & P Advisien Engr. GTSD
~
N.P. Kadambi NRC-PD IV Project Manager Larry Shao NRC/ DEST Directer L.B. Marsh NRC/ DEST /MEB Branch Chief Steven Rosen HL & P General Manager Operations Support Romuald E. Lipinski NRC/ DEST /ESGB Civil Engineer /SSAT Jose A. Calvo NRC/PD4 SSAT/PD4 Director s
,