Provides Addl Info Requested by NRC Re Implementation of Mods Required by 10CFR50.62 (ATWS Rule). Figure 1 Schematic,Depicting Isolation of ARI from ATTS Encl
ML20151X864
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/29/1988
From: Mcdonald R
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
SL-4501, NUDOCS 8805040273
Download: ML20151X864 (7)


Text

$0l0???'

wu a.m a vea c,e n s s:a a Pf a ' q A fMW rN o nFce B w 4$45 Aram Gr e a 3C M2

~

Georgia Power e xecuto. oeparirnen:

SL-4501 0208I X7GJ17-H220 April 29, 1988 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Hashington, D. C.

20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-37.1, 50-366 OPERATING LICENSES DPR-57, NPF-5 ADDITIONAL INFORMATION REGARDING IMPLEMENTATION OF 10 CFR 50.62 (ATHS RULE)

Gentlemen:

NRC's letter to Georgia Power Company (GPC), received February 9, 1988, requested additional information in regard to GPC's implementation of modifications required by 10 CFR 50.62, which had been previously described in GPC's letter of March 4, 1987.

Following are the items of additional information requested by NRC, and GPC's responses:

NRC Item 1:

It is the staff position that BWR/4 or Hatch designs must be upgraded by the addition of a second trip coil in each of the recirculation loops MG field breakers.

The logic to each HG set "A" and "B" generator field breaker is to be one-out-of-two (level) or one-out-of-two (pressure).

Please provide the information required by sections 7.0 and 7.1 of the Safety Evaluation of Topical Report (NEDE-31096-P), to justify a design which is different from the reference design.

GP U tesconse:

Section 7.0 of the reference SER requires utilities that have not upgraded their RPT system from the original design to demonstrate that their present design can perform its function in a reliable manner equivalent to the Monticello design or modified Hatch design.

The ATHS regulation itself only requires that a "reliable" RPT system be utilized. GPC will agree to modify the actuation logic such that both recirculation pumps will trip on a "one out of two;' or "two out of two" high pressure or low level signal.

However, for reasons which follow, GPC does not agree that a second trip coil should be added to the recirculation pump MG set generator field breaker.

t Q

8805040273 0B0429 7

g\\

DR ADOCK 0500 1

\\

GeorgiaPower d l

U. S. Nuclear Regulatory Commission April 29, 1988 Page Two l

l A quantitative analysis was previously performed and presented to NRC J

by Carolina Power and Light Company (CP&L), for its Brunswick plant, which demonstrates that RPT reliability is not increased by the addition of a second trip coil to the MG set generator field breaker.

This ant. lysis is documented in CP&L's letters to NRC of April 14, 1987, July 22, 1987 and November 13, 1987.

The conclusions of the analysis are based on information that the generator field I

breaker is less reliable than the MG motor main breaker, and that addition of the second trip coil to the generator field breaker does not significantly increase reliability of this breaker due to the predominance of other failure modes.

He understand that NRC and its contractors are currently reviewing the CP&L analysis.

GPC has reviewed this analysis and believes that CP&L's conclusions regarding RPT reliability (with and without the addition of the second field breaker trip coil) are applicable to Plant Hatch.

This is due to the fact that these analyses are based to a large extent on generic failure rate data and are specific to the RPT system, which is the same design at Hatch and Brunswick.

Moreover, absent any analysis, the requirement to add redundant trip coils to the MG set generator field breaker is in conflict with 10 CFR 50.62.

The Statement of Considerations for the Final ATHS Rule, published in the Federal Register (Volume 49, Number 124, page 26040) states:

"In view of the redundancy provided in existing reactor trip systems, the equipment provided by this amendment does not have to be redundant within itself."

Based on the above referenced analysis and the clarification provided in conjunction with the ATHS rule, GPC does not believe that redundant trip coils should be required for the recirculation pump HG set generator field breaker.

NRC ItsuL2:

Describe the devices which isolate the ARI from the ATTS (identified as trip relays in your submittal).

I GPC Resoonse:

The relays identified as trip relays in GPC's report are Agastat relays located in the non Class 1E sections of Analog Transmitter Trip System (ATTS) panels.

These relays were originally installed as spares during ATTS implementation.

A schematic depicting the subject relays is provided as Figure 1.

0208I rmns J

GeorgiaPower A i

1 U. S. Nuclear Regulatory Commission April 29,1988 Page Three NRC Item 3:

Please identify the physical location of the ARI and RPT logic and describe their independence from other plant logic systems.

GPC Resoonse:

The ARI logic panels are seismically mounted in the lower elevation (112') of the Control Building.

RPS and RPT logic panels are located in the control room at the 158' elevation.

The Control Building is physically separated from the Turbine Building by radiation shield walls, fire walls and fire doors.

All ARI hardware is qualified for anticipated operational occurrences.

New terminal blocks are provided in the ATTS panels in the control room for termination of the ARI control cables.

Initiation logic from the ATTS system is provided by utilizing existing IE relays and additional trip unit slaves which have been added.

The IE relays provide electrical isolation from RPS.

The ARI system is powered from the plant diesel battery system.

This power source is independent from RPS power sources.

Fuses provide ARI electrical isolation from this Class IE power source.

ARI signals are taken from ECCS sensors which are independent from RPS sensors.

Appendix A of the NRC SER addressing 10 CFR 50.62 provides a checklist for plant specific review of ARI.

Plant Hatch complies with all items on this checklist with the exception of Item 10.(b),

which addresses ARI bypass features.

ARI bypass is not necessary for testability of the Plant Hatch ARI system at power due to the configuration of the logic (see next response).

NRC. Item 4:

Describe the system design which permits the i

test / calibration of the system logic while the plant is in power operation.

GPC Resoonse:

The Plant Hatch ARI uses a redundant 2 out of 2 logic arrangement.

This allows maintenance, test or calibration of the system logic and instrumentation up to but not including the final trip devices.

Each individual level and pressure instrument can be tested during plant operation without initiating the ARI system since two level or two pressure signals must be present in one channel to i

complete the signal.

Therefore, bypasses are not required for this design approach.

If the conditions for ARI initiation do occur during sensor maintenance, either the remaining redundant active level channel or yessure channel would be available to initiate the system.

0208I 700775

l GeorgiaPower A U. S. Nuclear Regulatory Commission April 29, 1988 Page four NRC Item 5:

Identify if bypass switching is utilized in the ARI and RPT systems and if employed describe its conformance with the criteria used in the RTS.

GPC Resoonse:

See GPC response to NRC Item 4 above.

NRC additionally inquired verbally as to whether GPC was using ATTS trip units of diverse manufacturer for the ARI and RPS functioii. GPC is using the most reliable trip units available for performance of these functions.

As such, the trip units are of the same manufacturer. GPC is participating in a BHR Owners Group activity to address the generic question of ARI trip unit diversity.

If you have any questions in this regard, please contact this office at any time.

Sincerely.

7/

(4 -

R. P. Mcdonald Executive Vice President.

Nuclear Operations REB /lc Eliclosure:

Figure 1 c:

Georaia Power Comoany Mr. J. T. Beckham, Jr., Vice President - Plant Hatch Mr. L. T. Gucwa, Manager Nuclear Safety and Licensing GO-NORMS U. S. Nuclear Reaulatory Commission. Washington. D. C.

Mr. L. P. Crocker, Licensing Project Manager - Hatch U. S. Nuclear Regulatory Commission. Reaion II Dr. J. N. Grace, Regional Administrator Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch 0208I 700775

M GeorgiaPower d ENCLOSURE PLANT HATCH -. UNITS l' 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 ADDITIONAL INFORMATION REGARDING IMPLEMENTATION OF 10 CFR 50.62 (ATHS RULE)

FIGURE 1 Schematic depicting isolation of ARI from ATTS 0208I E-1 04/29/88 SL-4501

P

~-

ARI VALVE ARI VAdy Cll-F229B Cll-F220

,r NON DIVISION NON DIVIS:

3 Ew o-we ARI VALVE JW WZ ARI VALV Cil-F229A d3 C l l-F29C NON DIVISION

>- m

-o NON DIVISI

>- w

<w 125V DC CAB IE yg

@p 125V AC LTG R25-5005 w<

v<

R25-5078 E5B UV gv NON DIVISI

[ESSB RACEVAY (VHITE)

"3 3

fE52

\\/ (NON DIV CABLE COR-VH)

-o

-o (QN0t mz mz mo mo TEF G

3 IIIIII 1

REAR

(

ARI LOGIC PANEL

)

lNOT Z FUSE Z

ClI-P001

'NOT-FUSE NON DIVISION I

7 7

A FRONT R41-5001 REACTOR CON FUSE BOX PANEL Hil-F E5B RPS ESS I &@

(GREEN)}[

ESB RACEVAY (VHITE)

[ESS I RACEVAY f E55 II RACEVAY

+

NON DIV CABLE (OR-VH)

(NON DIV CABLE 8 ESS I RACEVAY (YELLOV11

[ESS II RACEVAY (GREEN)

NON DIV CABLE (BLUE)

J

\\/

\\/

(NON DIV CABLE (ORANGE) f,,,

r r

r r r r

r r gg gg ggggy r r ESS II CABLE

[I L [IIl

[IIl [IIl 1

1I Ii 11 11 lNOTk ll lNOTb 2l lNOTk Il lNOTb 2l A

Al NOTE 3!

) l NOTE 3lA ATTS PANEL ATTS PANEL ATTS PANE (

Hil-P925 Hil-P926 Hil-P9281 E55 I E55 II E55 11

' HEV.

DATE BY C H K'O D ESCRIPTIO N A PP R.1 APPR 2 A PP R. 3 APPR.A d A

Il Zl-ffo BGT EGf ISSUED FOR DCR 96-29t4 R 4 N/ /3fMi M

~

Ill E= ) }N4B :D I M

II U-

)

MM h

rIIg_I M

'V QMSdM, d -jla j,

M---

9 e y*

mead

E NOTES:

ON

1. EXISTING LOV LVL SIGNAL USED FOR ARI INITIATION LOGIC (2 CHANNELS).
2. EXISTING HIGH PRESSURE SIGNAL USED FOR ARI 1

INITI ATION LOGIC (2 CHANNELS).

9.HPCI TORUS HIGH VATER LEVEL TRIP UNITS AND ON INCOMING CABLE FROM CAP PRESS XMTR5 E41-N0628 AND E41-N062D ARE RELOCATED FROM Hil-P926 TO Hil-P928 VHICH PROVIDES SPACE IN Hil-P926 FOR CAB SLAVE TRIP UNITS REQUIRED FOR ARI.

4. INSTALL ANNUNCIATOR VITH "ACK",

"TEST" AND

)g "RESET" PUSHBUTTONS DEDICATED TO ARI.

II RACEVAY (GREEN)

5. INSTALL MANUAL CONTROL SVITCHEG AND SYSTEM DfV CABLE (ORANGE)

STATUS LIGHTS FOR ARI.

6.NON IE SECTION OF PANEL IS INDICATED BY m.

h 7.IE SECTION OF PANEL 15 INDICATED BY A.

8. MAINTAIN NON-DIV/ESSI/ESSII SEPARATION VITH-IN PANELS PER DVG A-17961 SECT 9.9 (5H.24 & 25).

'ANEL 4l s 51

'ANEL

'ROL 609 55 11 YELLOV)

@LUE)

JAY (GREEN)

(GREEN)

TI APE 1? tulle a

CAllD l

APPLICON ADS-02 l

Also Available On SKETCH NUMBER REV

' Aperture Card SE-86-294-l04 A

REF DWG NUMBER REV VORK THIS DVG VITH SE-96-294-u9 N/A PPR.9 QEMARKS seasD46o78-ol Southern Company Services, Inc. ' "

GEORGIA POWER COMPANY

',', o" '

T e j e"x^,*o" c [ L ~, j

/

HATCH-UNIT NO.I ATWS-ARI SEPARATION CRITERIA courmutok sHt ti se n t y m,e P R'O'i,l. D.

DR AWING NUMBER SHEET REV.

'A

/

s /

~-