Responds to Violation Noted in Insp Rept 50-425/88-10. Corrective Actions:Training Sessions Held to Instruct Craft & Field Engineering Personnel That Project Engineering Approval Required Prior to Fabrication or Installation
ML20151X648
Person / Time
Site: Vogtle 
Issue date: 04/28/1988
From: Rice P
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GN-1449, NUDOCS 8805040215
Download: ML20151X648 (2)


Text

"

Georgia Fower Company Fbst Offico Box 282 Waynesboro, Georgia 30830 Talophone 404 554-9961 Extension 3413 404 724-8114 Extension 3413 L

Georgia Power P. D. Ric.

Vice President Vogtte Project t>w mayn eWnc sgrem April 28, 1988 United States Nuclear Regulatory Commission ATTN:

Document Control Desk File:

X78G10 Washington, D. C.

20555 Log: GN-1449

Reference:

Vogtle Electric Generating Plant - Unit 2 USNRC Inspection Report 50-425/88-10 Georgia Power Company wishes to submit the following information concerning the violation identified in the referenced inspection report.

Violation 50-425/88-10-01, "Failure to Issue Field Change Requests (FCR) for Addition of Fire Protection Piping to Cable Tray Supports" Georgia Power Company (GPC) acknowledges the violation as identified in the USNRC report.

The violation occurred as a result of the responsible Fire Protection personnel's failure to follow 6pplicable installation details requiring them to obtain prior Engineering approval to attach Fire Protection System supports to cable tray supports.

To determine the extent of the violation, a walkdown of Fire Protection Systems installed adjacent to cable tray supports was conducted by Project Engineering personnel.

A total of eighty-two (02) supports were found attached to tray supports.

Of these, twenty-five (25) supports were installed to tray supports without prior Engineering approval.

These twenty-five (25) supports were evaluated by Engineering with seven (7) supports requiring modification or removal.

To prevent further recurrence, training sessions were held instructing craft and Field Engineering personnel that Project Engineering approval is required prior to any fabrication or installation, including attaching Fire Protection supports to cable tray supports.

Fire Protection supports are currently being installed in accordance with appropriate Engineering approval.

Full compliance was achieved as of April 28, 1988.

f 5

t

N USNRC Inspection Report 50-425/88-10 File:

X78G10 April 28,1988 Log: GN-1449 Page two This correspondence contains no proprietary information and may be placed in the NRC Public Document Room.

J.

P. D. Rice PDR/wk1 xc: USNRC - Region II Suite 2900 101 Mariotta Street, N. W.

Atlanta, GA 30323 r

H. G. Baker D. R. Altman L. T. Gucwa R. P. Mcdonald J. A. Bailey C.

W. Hayes R. H. Pinson G. Bockhold, Jr.

R. W. McManus 1

E. D. Groover G. R. Frederick Sr. Residents (NRC)

C. T. Moore J. E. Swartzwelder D. H. Smith (0PC)

R. A. Thomas A. B. Gallant J. E. Joiner (TSLA)

NORMS