ML20151X463

From kanterella
Jump to navigation Jump to search
PNO-77-144:on 770812,Region III Was Informed by Inspector at Site That Davis-Besse Unit 1 Plant Went Critical at 1730 Hours.No Significant Problems Noted During Approach to Criticality,Achieved Well within Predicted Limits
ML20151X463
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/15/1977
From: Klingler G, Nolan F, Sniezek J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-77-144, NUDOCS 9809170102
Download: ML20151X463 (1)


Text

-

t

.M

Y.,,,.!

je

jno, PRELIMINARY NOTIFICATION

/ ~

August 15, 1977 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE-This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance.

The information presented is as initially received without ver*1fication or evaluation

_and is basically all that is known by IE staff on this date, Facility:

Toledo Edison Company, Davis-Besse Unit 1 (DN 50-346), Oak Harbor, OH

Subject:

INITIAL CRITICALITY i.

Region III (Chicago) was informed by the inspector at the site that the Davis-Besse Unit 1 plant went critical at 1730 hours0.02 days <br />0.481 hours <br />0.00286 weeks <br />6.58265e-4 months <br /> EDT on August 12, 1977.

No significant problems were noted during the approach to criticality which was achieved well within predicted limits. The plant received its operating license on April 22, 1977. During the interim period the plant loaded the fuel assemblies and conducted final equipment checkout.

This PN is being issued because this item is considered to be of 7

j potential public interest.

A Region III (Chicago) inspector was at the site during the approach to criticality.

i

, i.

Region III (Chicago) received notification of this item by telephone j

from the reactor inspector at 1635 hours0.0189 days <br />0.454 hours <br />0.0027 weeks <br />6.221175e-4 months <br /> CDT on August 12, 1977.

Contact:

GKlingler, IE x28019 FNolan, IE x28019 JSniezek, IE x28019 i

Distribution:

Transmitted H St//**d k j

Chairman Hendrie

)

Commissioner Kennedy S. J. Chilk, SECY C. C Kammerer, CA Commissioner Gilinsky (ForDistribution) t i

Transmitted: MNBBf/.*d 7 PBldg//'df E. Volgenau, IE

/

L. V. Gossick, EDU E. G. Case, NRR Region E //.*A S. H. Hanauer, EDO j

J. J. Fouchard, PA SS Bldg //.*/ o (MAIL)

O j/f j

W. G. Mcdonald, MIPC C. V. Smith, NMSS R. J. McTiernan, 0IA R. G. Ryan, OSP R. Minogue, SD f

I H. K. Shapar, ELD PRELIMINARY NOTIFICATION DFou 9809170102 770815 PDR IfeE PNO-77-144 PDR l

, 7,