PNO-77-144:on 770812,Region III Was Informed by Inspector at Site That Davis-Besse Unit 1 Plant Went Critical at 1730 Hours.No Significant Problems Noted During Approach to Criticality,Achieved Well within Predicted Limits
ML20151X463
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/15/1977
From: Klingler G, Nolan F, Sniezek J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-77-144, NUDOCS 9809170102
Download: ML20151X463 (1)


Text

- -

t

.M Y.,,,.! je .

.. jno, PRELIMINARY NOTIFICATION  ! /~

August 15, 1977 -

PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--

This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance. The information presented is as initially received without ver*1fication or evaluation

_and is basically all that is known by IE staff on this date, ,

Facility: Toledo Edison Company, Davis-Besse Unit 1 (DN 50-346), Oak Harbor, OH

Subject:

INITIAL CRITICALITY i.

Region III (Chicago) was informed by the inspector at the site that the Davis-Besse Unit 1 plant went critical at 1730 hours0.02 days <br />0.481 hours <br />0.00286 weeks <br />6.58265e-4 months <br /> EDT on August 12, 1977. .

No significant problems were noted during the approach to criticality which was achieved well within predicted limits. The plant received

. ! its operating license on April 22, 1977. During the interim period ' '

the plant loaded the fuel assemblies and conducted final equipment

! checkout.

7 This PN is being issued because this item is considered to be of j potential public interest.

i A Region III (Chicago) inspector was at the site during the approach to criticality.

, i.

j Region III (Chicago) received notification of this item by telephone from the reactor inspector at 1635 hours0.0189 days <br />0.454 hours <br />0.0027 weeks <br />6.221175e-4 months <br /> CDT on August 12, 1977.

Contact:

GKlingler, IE x28019 FNolan, IE x28019 JSniezek, IE x28019 i Distribution:

j Transmitted H St//**d k -

Chairman Hendrie

) Commissioner Kennedy S. J. Chilk, SECY C. C Kammerer, CA

, Commissioner Gilinsky (ForDistribution) t i

Transmitted: MNBBf/.*d 7 PBldg//'df E. Volgenau, IE /

L. V. Gossick, EDU '

E. G. Case, NRR S. H. Hanauer, EDO Region E //.*A j J. J. Fouchard, PA SS Bldg //.*/ o (MAIL) f j W. G. Mcdonald, MIPC C. V. Smith, NMSS R. J. McTiernan, 0IA O f j/

. R. G. Ryan, OSP R. Minogue, SD I

H. K. Shapar, ELD .

PRELIMINARY NOTIFICATION 9809170102 770815 -

DFou PDR IfeE

  • l PNO-77-144 PDR *

, 7,