Forwards Safety Insp Rept 70-1100/88-03 on 880229-0304 & 0328-31.Significant Deficiencies in Mgt Controls & Licensed Program Identified.Apparent Violations Discussed.Enforcement Conference Scheduled for 880510 in Region I Ofc
ML20151X448
Person / Time
Site: 07001100
Issue date: 04/21/1988
From: Congel F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mcgill P
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML20151X453 List:
References
NUDOCS 8805040156
Download: ML20151X448 (2)


Text

^m

. t/.

APR 21 198g Docket No. 70-1100 Combustion Engineering, Inc.

ATTN: Mr. P. L. McGill Vice President - Nuclear Fuel Nuclear Power Systems - Manufacturing P. O. Box 500 Windsor, Connecticut 06095 Gentlemen:

Subject:

Inspection Report No. 70-1100/88-03 A routine, unannounced safety inspection was conducted by Mr. J. Roth of this office on February 29 - March 4,1988, and by Ms. J. Gresick of this office on March 28-31, 1988, to review your licensed program. The inspections consisted of selected examinations of procedures and representative records, interviews with personnel, measurements, and observations by the inspectors.

As a result of this inspection, our inspectors identified significant deficiencies in your management controls and your licensed program. Several 4 of your activities were not conducted in full :ompliance with regulatory

requirements. Apparent violations are discussed in the enclosed inspection report. We are especially concerned that your management controls have not improved following the Enforcement Conference held on December 1, 1987.

Based upon the results of this inspection and the telephone discussions between Dr. Ronald Bellamy of this office and yourself on April 15, 1988, we have scheduled an Enforcement Conference in the Nuclear Regulatory Commission Region 1 Office to discuss these matters with you. That conference has been scheduled for May 10, 1988 at 11:00 a.m.. The conference will provide you and your staff an opportunity to discuss the management control system which allowed these violations to occur and your short-term and long-term corrective actions and program upgrades to prevent another re-occurrence of this situation. The need for and the nature of appropriate enforcement actions for i the apparent violations will be the subject of separate correspondence at a later date. In addition, we would like you to present the status of program upgrades in the radiation protection area resulting from the Enforcement J Conference held on December 1, 1987.

Your cooperation with us in this matter is appreciated.

Sincerely, Crisinal Sisned By:

4 Frank J. Congel, Acting Director Division of Radiation Safety and Safeguards a t

OFFICIALRECORDCOPY IR CE 88 0001.0.0 04/20/88 n 8805040156 880421 '

3 PDR ADOCK 07001100 h C DCD L

1

. Combustion Engineering, Inc. 2 APR 21 199g

Enclosure:

NRC Region I Inspection Report Number 70-1100/88-03 cc:

Public Document Room (PDR)

Local Public Document Room (LPOR)  !

Nuclear Safety Information Center (NSIC) '

State of Connecticut -

-i- bec w/ encl: .

f RegionIDocketRoom(withconcurrences) '

Management Assistant, DRMA (w/o encl)

Robert J. Bores, DRSS- -

J. Roth, DRSS-- '

G. Bidinger, NMSS I

I r

f i

l i

I f

f i

i

.$ bas r

O $

R hSS RI
0RS  : RSS RI:DRSS ) v l F 1/sh/slj es :k asciak Shanbaky //_Be amy Congel .;

l C f/88 Q[jf sY 88 4/G/88 4/7s/88 Y 4/Zp/88 4Q/88 s

i i

0FFICIAL RECORD COPY IR CE 88 0001.1.0 i j 04/18/88 i i

i  !

s I t