PNO-77-151:craft Union Operating Engineers Established Picket Lines at Both Entrances to Three Mile Island Site. Union Objects to Fact That Catalytic,Inc Does Not Employ Const Equipment Operators
ML20151X412
Person / Time
Site: Crane  Constellation icon.png
Issue date: 08/30/1977
From: Klingler G, Sniezek J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-77-151, NUDOCS 9809170075
Download: ML20151X412 (2)


Text

.

...f p (! Q j:- -

CJ-7

.w iI 3

twuc t

/

)

~

PRELIMINARY NOTIFICATION o

August 30, 1977 PRELIMINARY NOTIFICATION OF EVENT OR IfNUSUAL OCCURRENCE--PNO-77-151

\\

This preliminary notification constitutes EARLY notice of an event of

,, POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation

_and is basically all that is known by IE ' staff on this date.

i Facility: Three Mile Island Unit Nos. 1 and 2 (DN 50-289'and 50-320)

)

Metropolitan Edison Company I

Middletown, Pennsylvania

Subject:

STRIKE Craft union operating engineers esta.blished picket lines this morning at both entrances to the Three Mile Island Site'.

The craft personnel involved are equipment operators. They are objecting to the fact that Catalytic, Inc. (a construction ' contractor) does not employ construction g

equipment operators.

/

Unit No.1 operating personnel are honoring the picket line.

Operating personnel from the midnight to 8:00 a.m. shift have stayed at the site I,,

and are operating the Unit, which is at 100 percent of rated power.

In i

addition, the licensee has sufficient non-union licensed and non-licensed -

M%

  • personnel to operate the facility and provide support coverage such as maintenance, health physics, and emergency planning.

)

The Security Force is not affected by this strike.

1 Construction workers for Unit No. 2 are also honoring ' tid picket lines; ~so

~

~

i I

all construction activities have stopped.

j Two Region I inspectors are at the site. They will perform inspections i

to assure that the licensee's strike plan is adequate and is being

-i properly implemented.

Media interest is expected because of close attention given to conditions at nuclear facilities. The Commonwealth of Pennsylvania has been informed.

A press release is being planned by the licensee.

Continued

,(

a

/

9809170075 770830 PDR I8rE PNO-77-151 PDR T) Q 2__

gCCSS

wig r

Page 2 PNO-77-151

~

Continued August' 30,1977 NRC, Region I, (Philadelphia) received notification of this occurrence i

by telephone from the Unit No.1 Superintendent at 8:20 a.m., August 30, 1977.

Contact:

G. Klingler, IE x28019 JSniezek, IE, x28019 Distribution:

Transmitted H St//.2 f";

Diairman Hendrie Commissioner Bradfor'd Commissioner Kennedy S. J. Chilk, SECY C. C. Kantnerer, CA Conunissioner Gilinsky (For Distribution)

MNBB//2!

P Bldg //'8d E. Volgenau, IE Transmitted:

L. V. Gossick, EDO E. G. Case, NRR Region L //.' SL

)

S. H. Hanauer, EDO e

J. J. Fouchard, PA SS Bldg ///3 (MAIL)

W. G. Mcdonald, MIPC C. V. Smith, NMSS R. J. McTiernan, 0IA l

R. G. Ryan, OSP R. Minogue, SD l

H. K. Shapar ELD l