Discusses Arrangements Made During 980909 Telcon for Insp of Licensed Operator Requalification Program at Byron NPP During Wk of 981130
ML20151X261
Person / Time
Site: Byron  Constellation icon.png
Issue date: 09/10/1998
From: Leach M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
References
NUDOCS 9809160333
Download: ML20151X261 (3)


Text

- _. _ _ _. _ _ _ _. _ _ _.. _.. _ _. - _ _ _ _ _ _. _. _.. _ _ _ _... _. _

t.

September 10, 1998 Mr. Oliver D. Kingsley President, Nuclear Generation Group Commonwealth Edison Company ATTN: Regulatory Services i

Executive Towers West lll 1400 Opus Place, Suite 500 g

Downers Grove, IL 60515

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION

Dear Mr. Kingsley:

In a telephone conversation on September 9,1998, Mr. Steve Pettinger, Operations Training Supervisor, and Mr. Hironori Peterson, Senior Operator Licensing Examiner, made arrangements for the NRC to inspect the licensed operator requalification program at the Byron Nuclear Power Station. The inspection is planned for the week of November 30,1998, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please fumish the written examinatioas and operating tests scheduled for the week of the inspection to the NRC by November 23,1998. Mr. Pettinger has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30,2000.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Intemet electronic mail at BJSi@NRC. GOV; and to the Desk Officer, Office of Infoimation and Regulatory Affairs, NEOB-10202, (3150-0101), Office of l

Management and Budget, Washington, D.C. 20503.

O The NRC may noi conduct ar sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

9809160333 98091o (DR ADOCK 05000454 l

PDR i

,,m

. ~. -

a d

O. Kingsley ~

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Dell McNeil at 630-829-9737, or me at 630-829-9705.

]

Sincerely, Original /s/ M. Leach j

.i Melvyn N. Leach, Chief Operator Licensing Branch

]

[

Docket Nos.: 50-454;50-455 License Nos.: NPF-37; NPF-66 cc:

M. Wallace, Senior Vice President D. Helwig, Senior Vice President G. Stanley, PWR Vice President J. Perry, BWR Vice President D. Farrar, Regulatory Services Manager

1. Johnson, Licensing Director DCD - Licensing K. Graesser, Site Vice President i

D. Wozniak, Acting Station Manager D. Brindle, Regulatory Assurance Supervisor R. Hubbard, MHB Technical Associates N. Schloss, Economist Office of the Attorney General State Liaison Officer State Liaison Officer, Wisconsin Chairman, Illinois Commerce Commission T. Schmidt, Training Department See Attached Distribution DOCUMENT NAME: G:DRS\\byr091.l8.drs e.n.. em e ou s,em uw. m s. na c cm m.ra =.a.

e. cm a. mum. w. m e.

OFFICE Rlli A lC Rlli lc Rlli y

Rlli l

o NAME PeteW Leach # # 4 Jordan 7IVf DATE 09/109ff W 09to/98 09/s)/98 09/ /98 OFFICIAL RECORD COPY

=.

jA O. Kingsley Distribution:

SAR (E-Mail)

R. Gallo, NRR/HOLB Project Mgr., NRR w/enci J. Caldwell, Rlli w/enci l

C. Pederson, Rlli w/enci B. Clayton, Rlli w/enci SRI Byron w/enci DRP w/enci TSS w/enci DRS (2) w/ encl Rlll PRR w/enci

. PUBLIC IE-42 w/enci Docket File w/enci GREENS LEO (E-Mail)

DOCDESK (E-Mail)

M. Bies, DRS

._.