~D CD k^
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 2
l 7 AMrNDMENT/MODIFICAflON NO 3 EFFECrru nATE
- 4. REQUISITIONfPuRCHASE REQ NO
- 5. PROJECT NO Of applicaolef l
_6 gp_q 919%
s.eSSurD eV
- 7. ADMINISTERED BY fit other then item 6)
U.S Nuclear Regulatory Consnission DIYiston of Contracts and Property Mgt.
Attn: T-7-I-2 Contract Management Branch 1 Washington CC 20555 8 NAME AND ADDRESS OF CONTRACTOR CNo,, street, county, state and ZIP Code) tX) 9A. AMENDMENT oF SOUCITATION NO.
Se. DATED (SEE REM W STC"E AND WEBSTER, INC.
ATT2:
HR. CHARLES E. CRONAN, JR.
R
' ^ ' " " ' ' * " " **CI' " '" " '
O 325 Con # NRC-03-96-025 108. DATED (SEE ITEM 13F CODE lF ACluTY CODE X
09-30-1996
- 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS C The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, 04 not e tended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
II) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment of each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC-KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour end dati specified.
12 ACcouNnNO AND APPROPRIATION DATA pf requered)
Aoun No. 31x0200.820; Amomt Deoblingigd: $171.756.37
- 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRASED IN ITEM 14.
A. T CHANGE ORDER IS ISSUELS PURSUANT TO: (Specdy authonty) THE CHANGEE SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
{
- 9. THE ABOVE NUMBERED CONTRACT.' ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes an payang office, appropnetsun date etc.)
SET FoRTH IN ITEM 14. PURSUANT TO THE AuTHORfTV of FAR 43.103(bl.
C. THis SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT To AUTHORITY oF; By mutual agreement of the parties.
x D. oTHER (Spectfy type of nedetication and authonty)
E. IMPORTANT: Contractor is not, x is required to sign this document and return 2 copies to the issuing office.
- 14. CEscluPTION oF AMENDMENTIMODIFICATION (Organized by UCF sect #on headmgs,includmg solicitation / contract subgect matter wtwee feesbie.)
Please see attached continuation sheets.
, ~b dq/%W l
9909160323 980909 PDR CONTR NRC-03-96-025 PDR f ucopt as peowded herem all terms and condetens of the document referenced en ttom sA os 1GA, as heretofore changed, remains unchanged and an full force and oflect.
15A NAME AND TITLE OF slGNER (Type os pnnti 16A. NAME AND TITLE of CONTRACTING C#ftCER (Type or panti
/ Mary H. Mace r N ony Ge dng Off1Cer
[}
ON@ h hN Cb [VYM O(M C
153 CONTRACT 16C. DATE SIGNED 168. UNI eT
. MERIC 16C DAT SIG D (Segnature of pee onsed to segn)
(Si of Conte cta
. ort
' STANDARD FORM 3"o (REk 10 831
69/E$/98 11:36 N R C + 617 589 5892 NO.048 Ke2 Contract No. NRC-03-96-025 Modification No. 6 page 2 of 3 he purpose of this modification is to (1) adjust the estimated cost and fixed fee of the contract as a result of an equitable agreement reached during telephone conversations between Mr. Charles Cronan, S&W, and Ms. Amy Siller, NRC, on August 27, and August 31,1998;
/
l (2) deobligate funds in excess of the amount necessary to perform the fmal inspection and co l
the dollar amounts listed under Modification No. 5 for FCC and fixed fee; (3) incorporate a shorter design inspection schedule for the Pilgrim inspection; and (4) extend the period of performance. The estimated ceiling, including the cost, facility capital cost of money and fee, of the contract is hereby decreased as shown below:
1 Ceiling:
Obligated:
Mod #5:
Mod #6:
Amt Deob'd
($ 100,000) ($ 171,756.37)
CPFF
$2,186,227
$2,003,300
$1,903,300
$1,731,543.63 l
Est'ed Cost
$1,974,749 (1,809,517
$1,709,517
$1,554,310.61 FCCM 27,826 25,498 25,498 21,801.93 Fixed Fee
$ 183,652
$ 168,285
$ 168,285 5 155,431.09
- 1. As a result of the deobligations detailed above, Subsection B.3, Consideration and Obligation-Cost Plus Fixed Fee (Jun 1988) Alternate I (Jun 1991), paragraphs (a), (c) a hereby deleted in their entirety and replaced with the following:
"(a) he total estimated cost to the Govemment for full pedormtace of this contract i
$1,731,543.63, of which the sum of $1,554,310.61 represents the estimated reinibu costs, $155,431.09 represents the fixed fee, and of which $21,801.93 represents FCC.
(c) The amount currently obligated by the Govemment with respect to this cont
$1,731,543.63, of which the sum of $1,554,310.61 represents the estimated reim costs, $155,431.09 represents the fixed fee, and of which $21,801.93 represents FC (d)lt is estimated that the amount currently allotted will cover performance thro December 7,1998."
- 2. Under Subsection C.3, Work Requirements, in the first paragraph the number "five" is l
replaced by the number "four," and the word " electrical" is deleted. Therefore, the first l
under subsection C.3 will mad "The contractor's BWR design inspection team consis individuals who are expert in the following disciplines: mechanical systems and instrum and controls (at least one in each discipline) are required to fulfill NRC's needs." In a under subsection C.3, a second, abbreviated design inspection schedule is hereby added immediately following the original inspection schedule.
i i
Contract No. NRC-03-96-025 Modification No. 6 Page 3 of 3 j
- 3. A Stop Work Order was issued on June 15,1998, pursuant to FAR 52.242-15 entitled "Stop-Work Order Alternate I (Apr 1984), not to exceed 90 days. This modification cancels that Stop-Work Order effective September 21,1998.
As a result, subsection F.6, Duration of Contract Period (Mar 1987) Alternate 4 (Jun 1988), is hereby deleted in its entirety and replaced with the followmg.
"F.6 Duration of Contract i
The period af this contract shall commence on October 1,1996 and will expire on December 7,1998."
l A summary of funds allotted to this contract from date of award to date is as follows:
FY 1996 Obligations:
$ 125,000.00 FY 1997 Obligations:
$1,278,300.00 FY 1998 Obligations:
$ 600,000.00 FY 1998 De-obligations:
($ 271,756.37)
Total Obligations:
$1,731,543.63 All other terms and conditions remain unchanged.
I l
l l
l
Pilgrim Design Inspection Schedule Week of Action September 21,1998 Inspection preparation '
September 28,1998 Site inspection October 5,1998 in-office review 1
October 12,1998 Site inspection October 19,1998 Site inspection October 26,1998 Team write report November 2,1998 Lead contractor review report i
and submit to NRC l
November 9 through Minimal effort by S&W December 7,1998 concerning NRC report revisions i
_