ML20151W929

From kanterella
Jump to navigation Jump to search
Informs That Effective 981001,DL Wigginton Will Reassign Responsibilities as Project Manager for River Bend Station. All Direct Correspondence for Project Manager Should Be Sent to R Fretz at Listed Address
ML20151W929
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/10/1998
From: Hannon J
NRC (Affiliation Not Assigned)
To: Edington R
ENTERGY OPERATIONS, INC.
References
NUDOCS 9809160189
Download: ML20151W929 (3)


Text

..

Mr. Randah K. Edington ~

September 10, 1998 Vice President Operations Entergy Operations, Inc.

l River Bend Station P.O. Box 220 St. Francisville, LA 70775

SUBJECT:

CHANGE OF NRC PROJECT MANAGER FOR RIVER BEND STATION

Dear Mr. Edington:

Effective October 1,1998, David L. Wigginton will reassign his responsibilities as Project

~

Manager for River Bend Station.

t All direct correspondence for the Project Manager should be sent to:

l Robert Fretz (River Bend Station)

U. S. Nuclear Regulatory Commission Mail Stop OWFN/13-H-3 Washington, DC 20555 The telephone number for Mr. Fretz can be reached on (301) 415-1324.

t Please revise your records to reflect these changes.

Sincerely, ORIGINAL SIGNED BY:

i John Hannon, Director Project Directorate IV-1' Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation Docket No. 50-458 cc: See next page DISTRIBUTION:

fD~ cket File"?

PUBLIC o

PDIV-1 r/f OGC ACRS MChaney l

TGwynn, RIV CHawes DWigginton RFretz JHannon i I,2 O U 1 l

g Document Name: CHANGEMEM.rif

/

D D/PD4-1[

OFC LA/PD4-1 NAME CHawesC/////

JHannon g

O' DATE 9//0 /98

/0/98 COPY YES/NO YES/NO OFFICIAL RECORD COPY 9909160189 980910 I

hf7p3 gf DR ADOCK 0500 8

((

ggi

pn rg g

g UNITED STATES j

NUCLEAR REGULATORY COMMIS810N 2

WASHINGTON, D.C. Sa= maai

'+9.....

September 10, 1998 Mr. Randall K. Edington Vice President Operations Entergy Operations, Inc.

River Bend Station P.O. Box 220 St. Francisville, LA 70775

SUBJECT:

CHANGE OF NRC PROJECT MANAGER FOR RIVER BEND STATION

Dear Mr. Edington:

Effective October 1,1998, David L. Wigginton will reassign his responsibilities as Project Manager for River Bend Station.

All direct correspondence for the Project Manager should be sent to:

Robert Fretz (River Bend Station)

U. S. Nuclear Regulatory Commission Mail Stoo OWFN/13-H-3 Washington, DC 20555 The telephone number for Mr. Fretz can be reached on (301) 415-1324.

Please revise your records to reflect these changes.

Sincerely, John Hannon, Director Project Directorate IV-1 Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation Docket No. 50-458 cc: See next page i

Mr. Randall K. Edington Entergy Operations, Inc.

River Bond Station cc:

Winston & Strewn Executive Vice President and 1400 L Street, N.W.

~ Chief Operating ONicer Washington, DC 20005-3502 Entergy Operations, Inc.

P. O. Box 31995 Manager-Licensing Jackson, MS 39286 Entergy Operations, Inc.

River Bend Station General Manager-Plant Operations P. O. Box 220 Entergy Operations, Inc.

St. Francisville, LA 70775

- River Bend Station P. O. Box 220 Senior Resident inspector St. Francisville, LA 70775 P. O. Box 1050 St. Francisville, LA 70775 Director-Nuclear Safety Entergy Operations, Inc.

' President of West Feliciana River Bend Station Police Jury P. O. Box 220 P. O. Box 1921 St. Francisville, LA 70775 St. Francisville, LA 70775 Vice President - Operations Support Regional Administrator, Region IV Entergy Operations, Inc.

U.S. Nuclear Regulatory Commission P. O. Box 31995 611 Ryan Plaza Drive, Suite 1000 Jackson, MS 39286-1995 Arlington,TX 76011 Attomey General Ms. H. Anne Plettinger State of Louisiana 3456 Villa Rose Drive P. O. Box 94095 Baton Rouge, LA 70806 Baton Rouge, LA 70804-9095 Administrator Wise, Carter, Child & Caraway Louisiana Radiation Protection Division P. O. Box 651 P. O. Box 82135 Jackson, MS 39205 Baton Rouge, LA 70884-213'.s i

?