ML20151W929
| ML20151W929 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 09/10/1998 |
| From: | Hannon J NRC (Affiliation Not Assigned) |
| To: | Edington R ENTERGY OPERATIONS, INC. |
| References | |
| NUDOCS 9809160189 | |
| Download: ML20151W929 (3) | |
Text
..
Mr. Randah K. Edington ~
September 10, 1998 Vice President Operations Entergy Operations, Inc.
l River Bend Station P.O. Box 220 St. Francisville, LA 70775
SUBJECT:
CHANGE OF NRC PROJECT MANAGER FOR RIVER BEND STATION
Dear Mr. Edington:
Effective October 1,1998, David L. Wigginton will reassign his responsibilities as Project
~
Manager for River Bend Station.
t All direct correspondence for the Project Manager should be sent to:
l Robert Fretz (River Bend Station)
U. S. Nuclear Regulatory Commission Mail Stop OWFN/13-H-3 Washington, DC 20555 The telephone number for Mr. Fretz can be reached on (301) 415-1324.
t Please revise your records to reflect these changes.
Sincerely, ORIGINAL SIGNED BY:
i John Hannon, Director Project Directorate IV-1' Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation Docket No. 50-458 cc: See next page DISTRIBUTION:
fD~ cket File"?
PUBLIC o
TGwynn, RIV CHawes DWigginton RFretz JHannon i I,2 O U 1 l
g Document Name: CHANGEMEM.rif
/
D D/PD4-1[
OFC LA/PD4-1 NAME CHawesC/////
JHannon g
O' DATE 9//0 /98
/0/98 COPY YES/NO YES/NO OFFICIAL RECORD COPY 9909160189 980910 I
hf7p3 gf DR ADOCK 0500 8
((
ggi
pn rg g
g UNITED STATES j
NUCLEAR REGULATORY COMMIS810N 2
WASHINGTON, D.C. Sa= maai
'+9.....
September 10, 1998 Mr. Randall K. Edington Vice President Operations Entergy Operations, Inc.
River Bend Station P.O. Box 220 St. Francisville, LA 70775
SUBJECT:
CHANGE OF NRC PROJECT MANAGER FOR RIVER BEND STATION
Dear Mr. Edington:
Effective October 1,1998, David L. Wigginton will reassign his responsibilities as Project Manager for River Bend Station.
All direct correspondence for the Project Manager should be sent to:
Robert Fretz (River Bend Station)
U. S. Nuclear Regulatory Commission Mail Stoo OWFN/13-H-3 Washington, DC 20555 The telephone number for Mr. Fretz can be reached on (301) 415-1324.
Please revise your records to reflect these changes.
Sincerely, John Hannon, Director Project Directorate IV-1 Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation Docket No. 50-458 cc: See next page i
Mr. Randall K. Edington Entergy Operations, Inc.
River Bond Station cc:
Winston & Strewn Executive Vice President and 1400 L Street, N.W.
~ Chief Operating ONicer Washington, DC 20005-3502 Entergy Operations, Inc.
P. O. Box 31995 Manager-Licensing Jackson, MS 39286 Entergy Operations, Inc.
River Bend Station General Manager-Plant Operations P. O. Box 220 Entergy Operations, Inc.
St. Francisville, LA 70775
- River Bend Station P. O. Box 220 Senior Resident inspector St. Francisville, LA 70775 P. O. Box 1050 St. Francisville, LA 70775 Director-Nuclear Safety Entergy Operations, Inc.
' President of West Feliciana River Bend Station Police Jury P. O. Box 220 P. O. Box 1921 St. Francisville, LA 70775 St. Francisville, LA 70775 Vice President - Operations Support Regional Administrator, Region IV Entergy Operations, Inc.
U.S. Nuclear Regulatory Commission P. O. Box 31995 611 Ryan Plaza Drive, Suite 1000 Jackson, MS 39286-1995 Arlington,TX 76011 Attomey General Ms. H. Anne Plettinger State of Louisiana 3456 Villa Rose Drive P. O. Box 94095 Baton Rouge, LA 70806 Baton Rouge, LA 70804-9095 Administrator Wise, Carter, Child & Caraway Louisiana Radiation Protection Division P. O. Box 651 P. O. Box 82135 Jackson, MS 39205 Baton Rouge, LA 70884-213'.s i
?