ML20151W040
| ML20151W040 | |
| Person / Time | |
|---|---|
| Site: | 07001426 |
| Issue date: | 07/17/1998 |
| From: | George M TRANSNUCLEAR, INC. |
| To: | Bennington G NRC |
| References | |
| TNY-98061-6, NUDOCS 9809150148 | |
| Download: ML20151W040 (2) | |
Text
__
TRANSNUCLEAR,1NC. Odd 3 ff-d
~ '
FOUR SKYLINE DRIVE 3
HAWTHORNE, NEW YORK 10532-2120
,[
TELEPHONE: 914-347-2345 FAX: 914-347-2346 b)
SERIAL NO:
N{([Idf6 hUMM TELEFAX NO: / - 30 f. 4./ $ 8 $%
TO:
7f(7[FI9f ATTN:' k L., ORIG' 6f N NINGT"OM DATE:
FROM: ; M AM@,,,,Q C.o@,E NUMBER OF PAGES: COVER + O/
FERENCE:
~7N,1!
9 9'O (ol - h
')
b-308 &
UF4 lLE.J Ccqews Yo kvES TING l+00 sc, NF.b.
Co Lvm Ath-Sc REfM Ol %
JUNE 30,1990 En c wascb Is connacrea P&cc 2-op oug Ld5 6 56 yw
\\kwe Awg f cn<
CJr tF me et 9/ 9 3 4 sn 6 4, g
&e6 lj, 4
9809150148 980717 yh PDR ADOCK 07001426 C
eon s
bieii
hd}Q
{
TNY 98061-6 My 17,1998 Page 2 of 2 73.74(a)(3)(ii) Data: Physical description of shipment:
G. Bennington, USNRC 6 model 30B cylinders inside overpacks containing:
RQ, URANIUM HEXAFLUORIDE, FISSILE (containing more than 1% U235), 7, UN2977, Radioactive Material (U235,U238) solid, UF6. Approximate UF6 weight: 13662 kgs.
Approximate U weight: 9240 kg enriched to max. 4.45%. Approximate weight U235: 406.560 kg.
73.74(a)(3)(iii)(iv)(v) Data:
MODE ORIGIN (0), TRANSFER (T),
ROUTE DATE/ TIME OF ARRIVAL COUNTRY /ENROUTE(C/E)&
(A) & DEPARTURE (D) AT DESTINATION (D) POINTS EACH POINT Rail Pierrelatte, FRANCE Standard rail (D)
July 23,1998 0800 - 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br /> Antwerp, BELGIUM Standard ocean (A)
July 28,1998 Ocean.
0800 - 2359 hours0.0273 days <br />0.655 hours <br />0.0039 weeks <br />8.975995e-4 months <br /> h,,
(D)
July 29,1998
^
Liverpool, ENGLAND (A/D) August 1,1998 0800 - 2359 hours0.0273 days <br />0.655 hours <br />0.0039 weeks <br />8.975995e-4 months <br /> Halifax, CANADA (A/D) August 9,1998 0800 - 2359 hours0.0273 days <br />0.655 hours <br />0.0039 weeks <br />8.975995e-4 months <br /> Port Elizabeth, NJ (A)
August 11,1998 Standard rail (D)
August 12, 1998 0800 - 2359 hours0.0273 days <br />0.655 hours <br />0.0039 weeks <br />8.975995e-4 months <br /> Arrival at the receiving facility is estimated to be between 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> and 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br /> on August 14, 1998.
'This shipment will meet the levels of physical protection specified in Appendix E (Annex I).
Yours truly Transnuclear, Inc.
Mathew George Traffic Coord' ator m
TOTAL P.02
__,