Forwards Insp Rept 50-333/98-04 on 980713-0823 & Nov. Security Program Insp Was Performed During Period Which Identified Violation of NRC Requirements Associated with Vehicle Search
ML20151V767
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/10/1998
From: David Lew
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Michael Colomb
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20151V771 List:
References
50-333-98-04, 50-333-98-4, NUDOCS 9809150072
Download: ML20151V767 (3)


See also: IR 05000333/1998004

Text

,

.

',

September _ 10, 1998

Mr. Michael J. Colomb '

Site Executive Officer

New York Power Authority

-James A. FitzPatrick Nuclear Power Plant

Post Office Box 41

Lycoming, NY 13093

SUBJECT:

NRC INTEGRATED INSPECTION 50-333/98-04 AND NOTICE OF VIOLATION

Dear Mr. Colomb:

On August 23,1998, the NRC completed an inspection at the James A. FitzPatrick Power

Plant. The enclosed report presents the results of that inspection.

.

During the 6-week period covered by this inspection, performance at the James A.

FitzPatrick reactor facility was appropriately focused on safety. However, human

performance continues to remain a concern. 'Both the August 3,1998 reactor scram and

poor performance which caused the high pressure coolant injection system to be inoperable

could have been prevented with a more rigorous approach to plant operations.

A security program inspection was performed during this period which identified a violation

4

of NRC requirements associated with vehicle search. The NRC has concluded that

information regarding the reason for the violation, the corrective actions taken and planned

to correct the violation and prevent recurrence is already adequately addressed on the

docket in this inspection report. Therefore, you are not required to respond to this letter

unless the description therein does not accurately reflect your corrective actions or your

position. In that case, or if you choose to provide additionalinformation, you should follow

l

the instructions specified in the enclosed Notice.

In'accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

j

and its enclosures will be placed in the NRC Public Document Room.

Sincerely,

Original Signed by:

l

David C. Lew, Chief

l

Projects Branch 2A

Division of Reactor Projects

33

OR

DO

DR

G

OFFICIAL RECORD COPY

IE:01

_ _

,

.

.

.

.

_ _ _ - -

.

.

Michael J. Colomb

2

Docket No.: 50-333

License No.: DPR-59

Enclosures:

1. Notice of Violation

2. Inspection Report 50-333/98-04

cc w/encis:

C. D.' Rappleyea, Chairman and Chief Executive Officer

E. Zeltmann, President and Chief Operating Officer

R. Hiney, Executive Vice President for Project Operations

J. Knubel, Chief Nuclear Officer and Senior Vice President

H. P. Salmon, Jr., Vice President of Engineering

W. Josiger, Vice President - Engineering and Project Management

J. Kelly, Director - Regulatory Affairs and Special Projects

T. Dougherty, Vice President - Nuclear Engineering

R. Deasy, Vice President - Appraisal and Compliance Services

R. Patch, Director - Quality Assurance

G. C. Goldstein, Assistant General Counsel

C. D. Faison, Director, Nuclear Licensing, NYPA

K. Peters, Licensing Manager

T. Morra, Executive Chair, Four County Nuclear Safety Committee

Supervisor, Town of Scriba

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

P. Eddy, Electric Division, Department of Public Service, State of New York

G. T. Goering, Consultant, New York Power Authority

J. E. Gagliardo, Consultant, New York Power Authority

E. S. Beckjord, Consultant, New York Power Authority

F. William Valentino, President, New York State Energy Research

and Development Authority

J. Spath, Program Director, New York State Energy Research

and Development Authority

_

.

_ .

_

_ _ _ _ _ _

_,

..

_ _ _ . . _ . . .

.._

.-.

_.

.

.

,

Michael J. Colomb

3

Distribution w/encls:

H. Miller, RA/W. Axelson, DRA (1)

Nuclear Safety Information Center (NSIC)

PUBLIC

NRC Resident inspector

Region 1 Docket Room (with concurrences)

D. Lew, DRP

J. Rogge, DRP

P. Kaufman, DRP -

R. Junod, DRP

Distribution w/encis: (VIA E-MAIL)

8. McCabe, RI EDO Coordinator

S. Bajwa, NRR

J. Williams, NRR

M. Campion, RI

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

F. Talbot, NRR

DOCDESK

l

DOCUMENT NAME: G:\\ BRANCH 2A\\FITZ9804. INS

To receive a copy of this document, indicate in the box: "C" = Copy without

attachment / enclosure

"E" = Copy with attachment / enclosure

"N" = No copy

OFFICE

Rl/DRP

l

Rl/DRP

,

NAME

GHunegs DVfrz,

DLew

D{-

DATE

09/10/98

09/)9/98

<

OFFICIAL RECORD COPY

,