i NRC Monthly Operations Summary Peach Botton Atomic Power Station July, 1988 UNIT 2 The unit remained shut down with restart activities and emergency service water pipe replacement in progress. Activities in progress during the report period included 13kV bus work, Reactor Core Isolation Cooling overspeed trip testing, Emergency Cooling Tower pump rebuild, MOVATS modifications, and E-2 and E-4 diesel annual maintenance outages.

UNIT 3 The unit remained shut down with pipe replacement activities in progress.

Activities in progress during the month included bottom head drain line installation, Reactor Water Cleanup pipe replacement, and turbine overhaul.

i l

l 1

l l

t

@*Remomgi,,

h' PDC 1

Docket No. 50-277 Attachment to Monthly Operating Report for July, 1988 UNIT 2 REFUELING INFORMATION 1.

Name of facility:

Peach Botton Unit 2 2.

Scheduled date for next refueling shutdown:

Reload 7 completed.

Reload 8 indeterminate due to Shutdown Order.

4 3.

Scheduled date for restart following refueling:

Indeterminate due to Shutdown Order 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

1 Yes If answer is yes, what, in general, will these be?

(1)Administrativechangestoreloadamendment (2) Reactor Water Level instrument range change I

r 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

(1) submitted April 25, 1988 (2) submitted October 13, 1987 l

1 6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Refueling completed.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool-l a) Core 764 Fuel Assemblies b) fuel Pc411 - 1734 fuel Assemblies, 58 fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

)

Docket No. 50-277 Attachment to Monthly Operating Report for July, 1988 Page 2 UNIT 2 REFUEllNG INFORMATION (Continued) 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September,1998(September 1995,withreservefull core discharge) r 1

l L

)

Docket No. 50-278 Attachment to Monthly Operating Report for July, 1988 i

UNIT 3 REFUELING INFORMATION 1.

Name of facility:

1 Peach Botton Unit 3 2.

Scheduled date for next refueling shutdown:

Reload 7 in progress (Major Pipe Replacement Outage) 3.

Scheduled date for restart following refueling Indeterminate due to Shutdown Order 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes.

If answer is yes, what, in general, will these be?

Technical Specifications to accommodate reload fuel and revise reactor core operating limits. Revisions to reflect modification to the primary system piping and installation of the Alternate Rod Insertion system.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

Alternate Rod Insertion Amendment submitted June 12, 1987.

I Primary System Piping Amendment submitted March 21, 1988.

Reload 7 License Amendment submitted July 7, 1988.

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating t

i procedures:

None expected.

l 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core-OfuelAssemblies(764 assemblies offloaded during outage)

(b) fuel Pool - 2260 fuel Assemblies, 6 fuel Rods a

Docket No. 50-278 Attachment to i

Monthly Operating Report for July, 1988 Page 2 M IT 3 REFUELING INFORMATION (Continued) 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. This modification began on February 20, 1987. The completion date for this modification has been rescheduled for February,1989 to accommodate the Unit 3 pipe replacement outage.

9.

The projected date of the last refueling that can be.ischarged to the spent fuel pool assuming the present capacity:

March,1993 (reserve full core discharge cannot be accommodated after the restart following the completion of the October, 1987 refueling outage until the completion of the new fuel racks)

Installation of the new fuel racks will extend the projected date of the last refueling to September, 2000 (March, 1996, with reserve fullcoredischarge)

I l

l 1

)

i l

4

1 4

8

+

AVERAGE DAILY UNIT POMER LEVEL t

DOCKET No. 50 277 1

l LNIT PEACH BOTTOM WIT 2 DATE AUD 12, 1988 j

COMPANY PHILADELPHIA ELECTRIC COMPANY

.i L. L. HIDDLETON TECHNICAL ASSISTANT I

4' o

LICEtGING SECTION

?

MJCLEAR SUPPORT DEPARTMENT TELEPHONE (2151 841-6374 MONTH JULY 1986 J

DAY AVERAGE DAILY P0HER LEVEL DAY AVERAGE DAILY PONER LEVEL I194E-NET I (194E-NET 1 1

0 17 0

i I

8 0

18 0

3 0

19 0

4 1

4 4

0 t0 0

5 0

21 0

6 0

t2 0

4 7

G 23 0

i J

l 8

0 24 0

4 4

4 d

9 0

25 0

\\

i 4

10 0

26 0

l 11 0

27 0

il 1

12 0

to 0

13 0

t9 0

10 0

30 0

l 15 0

31 0

16 0

l

. AVERAGE DAILY WIT POKER LEVEL DOCKET to. 50 - 278 LNIT PE ACH BOTTON WIT 3 DATE AUG 12, 1988 COMPAt# PHILADELPHIA ELECTRIC COMPAt#

L. L. HIDDLETON TECHNICAL ASSISTAt(T LICENSING SECTION PAJCLEAR SUPPORT DEPARTHENT TELEPHONE (215) 8416374 HONTH JULY 1988 DAY AVERAGE DAILY POHER LEVEL DAY AVERAGE DAILY P0HER LEVEL

( WC-NE T )

( mE-HETI i

1 0

17 0

l t

0 18 0

1 1

3 0

19 0

i 4

0 20 0

5 0

21 0

6 0

22 0

i 7

0 23 0

8 0

24 0

9 0

25 0

1 i

10 0

26 0

l 11 0

27 0

j 12 0

to 0

l 4

I 13 0

29 0

1 l

14 0

30 0

l 1

15 0

31 0

16 0

1 l

r t

OPERATING DATA REPORT i

DOCKET No. 50 - 277 3

L DATE AUG 12, 1964 i

1 r

COMPLETED SY PHILADELPHIA ELECTRIC COMPANN 1

t L. L. MIDDLETON TECHNICAL ASSISTANT l

LICENSING SECTION L

NUCLEAR SUPPORT DEPARittENT TELEPHONE t2151 841 6374 OPERATING STATUS

1. UNIT NAMEI PEACH BOTTON UNIT t i NOTEst LNIT 2 REMAINED SHUTDOP04 I

l l

2. REPORTING PERIOD JULY, 1988 l

- UNDER NRC ORDER HITH l

[

l l

i

3. LICENSED THERMAL P0HERIMHT)I 3293 l

RESTART ACTIVITIES I

l l

C. HAMEPLATE RATINW IGROSS MHE):

1152 l

CONTINUING.

l l

l S. DESIGN FLECTRICAL RATING INET MHEls 1065 l

l l

l t

6. MAXIMUH DEPENDABLE CAPACITY (CROSS MHE ll 1098 l

l t

l l

t

7. MAXIMUN DEPENDABLE CAPACITY INET MNEli 1051 l

l

8. IF Ch&NGES OCCUR IN CAPACITY RATINGS IITEMS P4JPSER 3 THROUGM 7) SINCE LAST REPORT, GIVE REASONSI
9. PONER LEVEL TO HHICH RESTRICTED, IF ANY INET MHE ll l
10. REASONS FOR RESTRICTIONS, IF ANY4 1

l i

1 l

1 i

THIS HONTH YR.TO DATE CUMULATIVE 1

l l

11. HOURS IN REPORTING PERIOD 744 5.111 123.383 l

i 1

12. NUMBER OF HOURS REACTOR HAS CRITICAL 0

0 74 196.8 l

l

13. REACTOR RESERVE SHUTDONN HOURS 0.0 0.0 0.0 l
10. HOURS GENERATOR OH-LINE 0.0 0.0 71,866.8 l
15. UNIT RESERVE SHUTDOHN HOURS 0.0 0.0 0.0 1
16. GROSS THERMAL ENERGY GENERATED IMHHI O

O 212.410.745 i

l I

17. GROSS ELECTRICAL ENERGY GENERATED IMHH) 0 0

70.019,230 l

l l

18. NET ELECTRICAL ENERGY GENERATED (MHH) m 3,656 e

26.8 P0 67.014.226 1

1 PAGE 1 OF t 1'

l l

OPERATIrc DATA REPO%T ICONTINUED)

DOCKET No. 50 277 t

t DATE Allo 12 e 1960 t

i, J

l I

THIS HONTH YR.TO-DATE CtMJLAT!YE f

i

~

19. UNIT SERVICE FACTOR 0.0

'0. 0 54.2 i

to. UNIT AVAILABILITY FACTOR 0.0 0.0 56.2

21. WIT CAPACITY FACTOR IUSING HDC NET) 0.0 0.0-

-51.7 t

1 i

22. UNIT CAPACITY FACTOR tuGING DER NET 1-0.0 '

- 0.0-51.0'

~

t

23. LNIT FORCED OLITAGE RATE 0.0_

0.0 14.6 i

i

~ t%. SHt/TDOW SCHEDULED OVER NEXT 6 MONTHS ITYPE s' DATE e AND DURATION OF C ACH) i REFUELING OUTAGE

~

t i

j INDETERMINATE UNTIL SHUTDOW ORDER -IS SATISFIEn.

l

25. IF SHUTDOPN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUPt i

i INDETERMIANTE UNTIL SHUTDOW ORDER IS SATISFIED.

i

24. UNITS IN TEST LTATUS (PRIOR TO Core 1ERCIAL OPERATIOHl FORECAST ACHIEVED f

INITIAL CRITICALITY 09/16/73 f

7

)

INITIAL ELECTRICITY 01/18/74 i

cort 1ERCIAL OPERATION 07/05/74 l

f 4

l i

1 i

I 1

i I

J l

j i

1 I

i J

PAGE 2 0F 2 l

f e. NEGATIVE VALUE REPORTED FOR CONSISTENCY MITH FEDERAL ENERGY REGULATORY COP 942SS10N REPORTE.

1 i

)

a i

i I

l

6 i

OPERATING DATA REPORT DOCKET No. 50 278 DATE AUG lie 1964 COPIPLiftD SY PHILADELPHIA ELECTRIC COMPANY L. L. MIDOLETON l

TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTHENT itLEPHOW t215) 441-6374 DPERATING STATUS

1. WIT HAMit Pt ACH SOTTCPt LNIT 1 l NOTES. LHIT 3 REMAINED SHVTOODN l

l l

2. REPORTING PERIOD JULYe 1968 l

UNDER NRC ORDER NITH l

l l

3. LICENSED THERMAL POMERIMNTil 3t93 i

REFUEL AND PIPE REPLActMENT l

l l

4. NAMEPLATE RATINE IGROSS MHt18 1152 l

IN PROGRESS.

l l

l l

5. DESIGN ELECTRICAL RATING (NET HMtil 106S l

l l

l

6. MAXIHUN DEPENDASLE CAPACITY IGROSS M>E ll 1096 l

l I

i

7. MAXIMUN DEPENDABLE CAPACITY INET MNE1:

1055 l

l

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NLDSER 3 THROUGH 7) SINCE LAST REPORT, GIM RIASONSt
9. PONER LEYtL TO HHICH RESTRICitDe IF ANY INtf PMEll
10. REASON 3 FOR RESTRICTIONS. If ANYI 1

i THIS MONTH YR-TO-DATE CutJLATIVE I

11. HOURS IN REPORTING PER100 744 5.111 119 279 t

l

12. MUMBER OF HOURS REACTOR KAS CtITICAL 0

0 76.357.4

13. REACTOR RESERVE SHUTD06N HOURS 0.0 0.0 0.0 l

l

13. HOURS GENERATOR OH-LINE 0.0 0.0 73.929.3
15. UNIT REstRvt SHUTDONN HOURS 0.0 0.0 0.0 f
16. GROSS THERMAL ENERGY GENERATED IMMH) 0 0

215.2 T8. 901 l

17. GROSS ELECTRICAL ENERGY GENERATED IMMH) 0 0

70,611.438 J

14. Ntf ELECTRICAL ENthGY GENERATED IMMHI e

3e656 e

26.490 67.674et65 1

l l

I PAGE 1 Of 3 i

i

-.+.1, t

OPERATING OATA REPORT (CONT 1NUE01 DOCKET No. 50 a 2F4 4

i 1

I 1

1 5

DATE AUG !!, 1968 I

4

[

THIS HONTH YA-TO DATE CUH4LAT1Yt l

n

\\

19. UNIT SERYZCE FACTOR 0.0 0.0 62.0

}

4 I

20. UNIT AVAILABILITY FACTOR 0.0 0.0 6f.0 j

)'

l

21. UNIT CAPACITY FACTOR (USINE MDC NET) 0.0 0.0 54.4 St. UNIT CAPACITY FACTOR IUSING OtR NET) 0.0 0.0-

'53.3 l

l

23. UNIT FORCEO DUTAGE RATE 0.0 0.0 13.3 7

f

24. SHUT 00&NS $CHEDULEO OVER NEXT 6 MONTHS tTYPts DATE: AND DURATION OF E ACHis' INDETERMINATE LNTIL NRC ORDER IS SATISFIED.

d j

25. IF SHUT 00MN AT END OF REPORT PERIODe ESTIMATED DATE Of STARTUPI 1

INDETERMINATE UNTIL SHUTDOWN ORDER IS SATISFIED.

26. tNITS IN TEST OTATUS (PRIOR TO Cort 1ERCIAL OPERATIONil FDP.ECAST ACHIEVED c

F 04/07/74

[

INITIAL CRITICALITY 1

l INITIAL ELECTRICITY 09/01/74 j

COMMERCIAL OPERATION lt/13/74

(

]

i 4

1 l

I i

~ + -

4 l

1 i

i i

i 8

l I

i I

i 4

1 2

i 4

I DAGE t OF t i

l t

l a

l

~- i -

m

'G NS AND F0HER REDUCTIONS DOCKET NO. 50 - 277 UNIT NAME PEACH BOTTOM LNIT 2 DATE AUG 12, 1988

[

REPCRT HONTH JULY, 1988 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY.

L. L. MIDDLETON TECHNICAL ASSISTANF LICENSING SECTION P5) CLEAR SUPPORT DEPARTMENT TELEPHONE (215) 841-6374 i

j l

l l

l NETHOD OF l LICENSEE ISYSTEHlCOMPONENTl CAUSE AND CORRECTIVE l

l TYPE l DURATION I RE ASCN l SHUTTING DOPN l EVENT.

I CODE l CODE l ACTION TO l

$.l DATE l (1)l (HOUR 3)l (2) l RE ACTOR ( 3 ) l REPORT s l' (4) l (5). l PREVENT RECURRENCE L...._____...........

i l

i i

I i

l l

l 7 l 880701 l S l 7%.0 l

C l 1

l N/A l RC l FUELXX l NRC REQUIRED SHUTDOMi.

l l

1 ----- 1 I

i l

i l

l 7%.0 l

l l

l l

l t

(1)

(2)

(3)

(4)

[-FORCED REASON HETH00 EXHIBIT G - INSTRUCTIONS f - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA 8 - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE' C. REFUELING 3 - AUTOMATIC 3 CRAM.

EVENT REPORT ILER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (MJREG-0161)

E - OPERAT00 TRAINING + LICENSE EX4AINATION F - ADMINISTRATIVE (5)

G - OPERATI0tal 5390R (EXPLAIN)

H-OTHER(EXPLA[.)

EXHIBIT I - SAME SOURCE l

I

,.~

mir..,

f,

,m

,..en w

y v

-~y

.~-

.~, -

/

b UNIT SHUTDCH4S AND PONER REDUCTIONS DOCKET NO. 50 - 278 (MIT NAME PEACH' 30TTOM UNIT 3 DATE.

kUG 12, 1988 REPORT HONTH JULY, 1988 COMPLETED BY PilILADCt.PHIA s!LECTRIC COMPANY L. L. MIDDLETON TECHNICAL ASSISTANT-LICENSING SECTION NUCLEAR SUPPORT DEPARTMENT-TELEPHONE (2151 841-6374 v....................................................................................................===--

.-= _ -..............

l l

l l

l NETHOD OF l LICENSEE ISYSTEHICOMPONENTI CAUSE AND CORRECTIVE l

l TYPE l DURATION l RE ASON I SHUTTING 00PN I EVENT l CODE i -CODE l ACTION TO G.!

DATE l (11l (HOURS)l (2) l RE ACTOR ( 3 ) l REPORT # l (4) l (51' l PREVENT RECURRENCE I

I I

i l

l l

I I

7 l 880701 l S l 7M.0 1 C l 1

i N/A l RC l FUELXX l PIPE REPLACEMENT. OUTAGE.

I I

I I

I I

I I

I l

l 1 ----- 1 I

I I

I I

l l

l 7%.0 I l

l l

l l

l (1)

(2)

(3)

(4)

- FORCED REASON HETHOO EXHIBIT G - INSTRUCTIONS

-. SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MAtAJAL FOR PREPARATION OF DATA' B - HAINTEtULHCE OR TEST

& = HANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING S - AUTCHATIC SCRAM.

EVENT REPCRT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE INUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - UPERATIONAL ERROR (EXPLAIN)

I H - OTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE l

~

en

-,.em

,e

- +, y u-m

PHILADELPHIA ELECTRIC COMPANY 23O1 M ARKET STREET P.O. BOX 8699 PHILADELPHI A PA.19101 (21510414000 August 15, 1988 Docket Nos. 50-277 50-278 Director l

Office of Inspection & Enforcement US Huclear Regulatory Consission Washington, DC 20555 Attention: Document Control Desk

SUBJECT:

Peach Bottom Atomic Power Station 4

Monthly Operating Report Gentlemen:

Attached are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of July, 1988 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

erytruly-yours A/ ' h-

/g W. M. Alden Director Licensing Sec ion Nuclear Support Division Attachment cc:

W. T. Russell, Administrator, Region I, USNRC T. P. Johnson, USNRC Senior Resident Inspector S. P. Mangi. Dept. of Envir. Resources W. H. Lovelace, NRC (2 copies)

R. E. Martin, NRC Project Manager Thomas Magette, Maryland Power Plant Siting INP0 Records Center R. S. Brown - Delmarva Pwr, & Light G. A. Thomas J. Urban - Delmarva Pwr, & Light M. M. Hannon U

j 't, i

i

.