Withdraws NOV Issued as Part of Insp Repts 50-317/98-80 & 50-318/98-80,dtd 980414 Re Test Control of post-installation Testing of Battery for 1A EDG
ML20151V325
Person / Time
Site: Calvert Cliffs  
Issue date: 09/08/1998
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Cruse C
BALTIMORE GAS & ELECTRIC CO.
References
50-317-98-80, 50-318-98-80, EA-98-371, NUDOCS 9809140241
Download: ML20151V325 (4)


See also: IR 05000317/1998080

Text

September 8, 1998

<

'

.

\\

EA 98-371

Mr. Charles H. Cruse

Vice President - Nuclear Energy

Baltimore Gas and Electric Company

Calvert Cliffs Nuclear Power Plant

1650 Calvert Cliffs Parkway

Lusby, MD 20657-4702

SUBJECT: WITHDRAWAL OF NOTICE OF VIOLATION

.

Dear Mr. Cruse:

This letter withdraws a Notice of Violation issued as part of Inspection Report 50-317;-

318/98 80, dated April 14,1998, regarding test control of post installation testing of the

battery for the 1 A emergency diesel generator (EDG). Your response to the violation in a

i

letter dated May 14,1998, stated that " Baltimore Gas and Electric Company denies the

)

alleged violation ..., but does acknowledge that the calculation was not easily auditable."

i

Based on our subsequent review, we have concluded that your position is correct and have

i

decided to withdraw the violation.

Specifically, the violation stated that the testing procedure for the 1 A battery " failed to

incorporate an appropriate acceptance criterion for the battery service test," and that the

acceptance criteria, a test shutdown criterion of 111 volts, differed from calculated

minimum voltages of 117.6 volts on the de.;ign of some associated equipment. Your

letter provided the bases for the apparent voltage discrepancy (differences in cable lengths

of control circuits for the two diesels covered by design calculations).

the test criteria were acceptably supported by subsequent design evaluations and the

t

resulting voltage is sufficient to operate the applicable equipment. Your stated corrective

'

actions included clariSations on the associated design calculations.

Regardless of the violation's withdrawal, we believe the design control of this testing

h(;D\\

evolution was weak, despite being found to be correct after the f act. We hope your

evaluations will enable future post-installation testing which is more thorough and

thoughtful.

We have reviewed the corrective and preventive actions for the remaining violation, as

documented in your letter, and have found the actions to be appropriate. These actions

will be examined during a future inspection of your licensed program.

9809140241 9so90s

PDR

ADOCK 05000317

G

pop

i

j

I

.

,

I

2

We appreciate your cooperation, honesty and understanding in these matters.

Sincerely,

James T. Wiggins, Director

Division of Reactor Safety

Docket Nos. 50-317

50-318

cc:

B. Montgomery, Director, Nuclear Regulatory Matters (CCNPP)

R. McLean, Administrator, Nuclear Evaluations

J. Walter, Engineering Division, Public Service Commission of Maryland

K. Burger, Esquire, Maryland People's Counsel

R. Ochs, Maryland Safe Energy Coalition

State of Maryland (2)

l

1

m

-

.-

-

.

__

~

. - .

. . .

.

.

.

,

,

\\

3

Distribution:

H. Miller, RA/W. Axelson, DRA (1)

l

D. Screnci, PAO

Nuclear Safety Information Center (NSIC)

PUBLIC

NRC Resident inspector

Region i Docket Room (with concurrences)

L. Doerflein, DRP

W. Cook, DRP

R.Junod,DRP

B Fewell'Si L <

ORA

lb ls

/

Distribution: (VIA E-MAIL)

B. McCabe, RI EDO Coordinator

S. Stewart - Calvert Cliffs

S. Bajwa, NRR

A. Dromerick, NRR

'

M. Campion, RI

Inspection Program Branch, NRR (IPAS)

- R. Correia, NRR

F. Talbot, NRR

DOCDESK

J. Lieberman, OE (OEMAIL)

D. Holody, EO, RI

F. Davis, OE

A. Nicosia, OE

4

DOCUMENT NAME: g:\\cmmeb\\meyer\\nov-wd.cc

Ta receive a copy of this document. Indicato in the box: "C" = Copy without attachmerWenclosure

"E" = Copy with attachment / enclosure

"N" = No

copt

>

OFFICE

RI:DRS

l

Rl:DRP/

l

RI:ORAgf l

RI:DRP

l

RI:DRS

l

NAME

GMeyer" A j

/ GMorris*

DHolod$

LDoerflein'

JWiggins V

DATE

9/3/98 (fjfAA/

9/ /98

9/g/98

9/ /98

09/g /98

'

/(/

OFFICIAL RECORD COPY

  • See Previous Concurrence Page

,_ . -

_

-- -

- .-

-

.

. __

_

.

I

e

4

\\

EA 98-371

Charles H. Cruse

[Calvert Cliffs]

Dear Mr. Cruse:

SUBJECT: WITHDRAWAL OF NOTICE OF VIOLATION

This letter withdraws a Notice of Violation issued as part of Inspection Report 50-317;-

318/98-80, dated April 14,1998, regarding test control of post-installation testing of the

battery for the 1 A emergency diesel generator (EDG). Your response to the violation in a

letter dated May 14,1998, stated that " Baltimore Gas and Electric Company denies the

alleged violation ..., but does acknowledge that the calculation was not easily auditable."

Based on our subsequent review, we have concluded that your position is correct and have

decided to withdraw the violation.

Specifically, the violation stated that the testing procedure for the 1 A battery " failed to

incorporate an appropriate acceptance criterion for the battery service test," and that the

acceptance criteria, a test shutdown criterion of 111 volts, differed from calculated

minimum voltages of 117.6 volts on the design of some associated equipment. Your

letter provided the bases for the apparent voltage discrepancy (differences in cable lengths

of control circuits for the two diesels covered by design calculations). You concluded that

the test criteria were acceptably supported by subsequent design evaluations and the

resulting voltage is sufficient to operate the applicablo equipment. Your stated corrective

actions included clarifications on the associated design calculations.

Regardless of the violation's withdrawal, we believe the design cor. trol of this testing

evolution was weak, despite being found to be correct after the fact. We hope your

evaluations will enable future post-installation testing which is more thorough and

thoughtful.

We have reviewed the corrective and preventive actions for the remaining violation, as

documented in your letter, and have found the actions to be appropriate. These actions

will be examined during a future inspection of your licensed program.

We appreciate your cooperation, honesty and understanding in these matters.

Sincerely,

J.T. Wiggins