Notification of 980917 Meeting with NEI in Washington,Dc to Discuss Fire Protection Circuit Analysis Issues with NEI Circuit Failure Issue Task Force & BWROG App R Committee. Agenda Encl
ML20151V310
Person / Time
Issue date: 09/11/1998
From: Stewart Magruder
NRC (Affiliation Not Assigned)
To: Essig T
NRC (Affiliation Not Assigned)
References
PROJECT-689, PROJECT-691 NUDOCS 9809140234
Download: ML20151V310 (6)


Text

-.

ea u4 p

9 g

UNITED STATES g

j NUCLEAR REGULATORY COMMISSION g

?

WASHINGTON, D.C. 20666 4001

,*****s September 11, 1998 MEMORANDUM TO: Thomas H. Essig, Acting Chief Generic issues and Environmental Projects Branch' Division of Reactor Program Management, NRR FROM:

Stewart L. Magruder, Project Manager -h4 4.bd Generic issues and Environmental Projects Branch

(

Division of Reactor Program Management, NRR

SUBJECT:

NOTICE OF MEETING WITH NUCLEAR ENERGY INSTITUTE (NEI)

AND BOILING WATER REACTOR OWNERS GROUP (BWROG)

REGARDING FIRE PROTECTION CIRCUlT ANALYSIS DATE AND TIME:

September 17,1998 9:00 a.m. - 3:30 p.m.

LOCATION:

Embassy Suites at Chevy Chase Pavilion 4300 Military Road, NW Wisconsin at Western Avenue Washington, DC 20015 PURPOSE:

To discuss fire protection circuit analysis issues with the NEl Circuit Failure Issue Task Force and the BWROG Appendix R Committee. An agenda is attached.

PARTICIPANTS:

NRG INDUSTRY T, Marsh F. Emerson (NEI)

S. West F. Garrett (APS)

L. Whitney V. Bacanskas (BWROG)

S. Magruder, et al.

B. Matthews (BWROG)

G. Stramback (GE), et al.

Project Nos. 689 & 691 cc: See next page l

l Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meeting Open to the Public," 59 Federal Reoister V)I, ?'

48344,9/20/94. Members of the public who wish to attend should con qStewart Magruder at 9 Q9<"'

m*., g n @j I (301) 415-3139.

PDR REVCP ERQNUMRC Nbs-.

y fj j'O' 9009140234 900911 pg R L 4 M; P f C5.

fia2 GhM,b]

=-

l September 11, 1998 MEMORANDUM TO: Thomas H. Essig, Acting Chief Generic Issues and Environmental Projects Branch Division of Reactor Program Management, NRR FROM:

Stewart L. Magruder, Project Manager Original Signed By]

Generic issues and Environmental Projects Branch Division of Reactor Program Management, NRR

SUBJECT:

NOTICE OF MEETING WITH NUCLEAR ENERGY INSTITUTE (NEI)

AND BOILING WATER REACTOR OWNERS GROUP (BWROG)

REGARDING FIRE PROTECTION CIRCUlT ANALYSIS DATE AND TIME:

September 17,1998 9:00 a.m. - 3:30 p.m.

LOCATION:

Embassy Suites at Chevy Chase Pavilion 4300 Military Road, NW Wisconsin at Western Avenue Washington, DC 20015 PURPOSE:

To discuss fire protection circuit analysis issues with the NEl Circuit Failure issue Task Force and the BWROG Appendix R Committee. An agenda is attached.

PARTICIPANTS:

M8Q INDUSTRY T. Marsh F. Emerson (NEI)

S. West F. Garrett (APS)

L. Whhne)

V. Bacanskas (BWROG)

S. Magruder, et al.

B. Matthews (BWROG)

G. Stramback (GE), et al.

Project Nos. 689 & 691 cc: See next page Meetings between the NRC technical staff and arplicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meeting Open to the Public," 59 Federal Reaister 48344,9/20/94. Members of the public who wish to attend should contact Stewart Magruder at (301) 415-3139.

Distribution: See next page DOCUMENT: G:\\simi\\mtg0917a.not I SC:SPLB SC:PGEB h>Af OFFICE PGEB NAME SMagrudeN SWest h FAkstulewic/01 I

DATE 09/ \\ CV98 09/ \\0/98h 09//l /98 L

MEETING AGENDA NEl / BWROG / NRC FIRE PROTECTION CIRCUlT ANALYSIS September 17,1998 9:00 am - 11:00 am NEl / BWROG Appendix R / NRC Coordination Meeting 11:00 am - 12:00 noon Lunch 12:00 pm - 12:30 pm Review Status and Schedule of BWROG Guidance Document 12:30 pm - 1:00 pm Review Status of NRC Information Notice on Fire Protection 1:00 pm - 3 00 pm Review aed discussion of Pilot " Draft" Positions "

3:00 pm - 3:30 pm Summary & Discussion about future status communications /

1 meetings

    • GE proprietary information will be discussed during this portion of the meeting. This portion of the meeting will be closed to the pub!ic.

f Nuclear Energy Institute-Project No. 689 cc:

. Mr. Ralph Beedle Ms. Lynnette Hendricks, Director Senior Vice President Plant Support and Chief Nuclear Officer Nuclear Energy Institute Nuclear Enerc" institute

. Suite 400 Suite 400 1776 i Street, NW 1776 l Street, NW Washington, DC 20006-3708 Washington, DC 20006-3708 Mr. Alex Marion, Director Programs Nuclear Energy Institute Suite 400 1776 i Street, NW Washington, DC 20006-3708 Mr. David Modeen, Director Engineering Nuclear Energy Institute Suite 400 1776 i Street, NW Washington, DC 20006-3708 Mr. Anthony Pietrangelo, Director Licensing Nuclear Energy institute Suite 400 1776 l Street, NW Washington, DC 20006-3708 Mr. Nicholas J. Liparulo, Manager Nuclear Safety ana Regulatory Activities Nuc! ear and Advanced Technology Division Westinghouse Electric Corporation -

P.O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. Jim Davis, Director Operations Nuclear Energy Institute Suite 400 l

1776 i Street, NW l

Washington, DC 20006-3708 l

L

I.e:

99 Project No. 691 l

Boiling Water Reactor Owners Group cc:

Thomas J. Rausch, Chairman W. Glenn Warren Boiling Water Reactor Owners' Group Southern Nuclear / Georgia Power l

Commonwealth Edison Company E.l. Hatch Nuclear Plant Nuclear Fuel Services PO Box 1295 M/C B052 1400 Opus Place,4th Floor ETWill Birmingham, AL 35201 Downers Grove, IL 60515 Carl D. Terry Dennis B. Townsend Vice President, Nuclear Engineering GE Nuclear Energy Niagara Mohawk Power Corporation M/C 182 Nine Mile Point-2 175 Curtner Avenue PO Box 63 San Jose, CA 95125 Lycoming, NY 13093 Drew B. Fetters Thomas A. Green l

l PECO Energy GE Nuclear Energy Nuclear Group Headquarters Mail Code 182 MC 62C-3 175 Curtner Avenue 965 Chesterbrook Blvd.

San Jose, CA 95125 Wayne, PA 19087 John Hosmer Commonwealth Edison Executive Towers,4th Floor 1400 Opus Place Downers Grove, IL 60515 George T. Jones Pennsylvania Power & Light i

MC A6-1 Two North Ninth Street Allentown, PA' 18101 Lewis H. Sumner i

Southern Nuclear / Georgia Power E. l. Hatch Nuclear Power Plant 40 Inverness Parkway i

l PO Box 1295 Birmingham,GA 35201 John Kelly New York Power Authority 14th Floor Mail Stop 14K Centroplex Building

- 123 Main Street White Plains, NY 106C 1

_ _ ~-.-_

l ed,

l

1 Distnbution Mtg. Notice w/NEl Dated Septemtr r 11 1998 l

' Hard Copy Project Files Central Files l

PUBLIC PGEB R/F OGC ACRS SMagruder LWhitney EMail SCollins/FMiraglia BSheron BBoger l

JRoe DMatthews TEssig FAkstulewicz SMagruder GTracy, OEDO

' PMNS OPA GHolahan TMarsh SWest LWhitney l

4

-v

-n

-