ML20151V149

From kanterella
Jump to navigation Jump to search
Forwards Security Upgrade Transition Plan for Review. Plan Withheld
ML20151V149
Person / Time
Site: Calvert Cliffs  
Issue date: 04/29/1988
From: Coss H
BALTIMORE GAS & ELECTRIC CO.
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8805020305
Download: ML20151V149 (1)


Text

- _ _ _ _ _ _ _

BALTIMORE

.(

GAS AND ELECTRIC CHARLES CENTER P.O. BOX 1475 BALTIMORE, MARYLAND 21203 H ERB ERT D. COSS, JR.

Vict PassiotNT GtNtan Stevicts Docket Numbers 50-317 50-318 Mr. William T. Russell Regional Director - Region I U.S. Nuclear Regulatory Commission 435 Allendale Road King of Prussia, Pennsylvania 19406

.I

Dear Mr. Russell:

Subject:

Temporary Change to Security Plan This letter is to advise you that August 1988 through December 1988 the Calvert Cliffs Nuclear Power Plant Security program is to be modified and upgraded.

Conditions of the temporary plan change entitled, "Security Upgrade Transition Plan" are attached for your review.

Upon completion of the security upgrade the requirements of the NRC approved Physical Security Plan will be adhered to.

Based on the results of an on-site in depth review and walk-through of the security Upgrade Transition Plan and subsequent telephone calls with Mr. William L. Kushner it is our intention to proceed with this program.

Sincerely, 10A H. D. Coss, Jr.

Vice President General Services HDC/JVR/bbh I

cc:

Mr. J. A. Tiernan, Vice President, Nuclear Energy Division Document Control Desk, NRC, Washington D.C.

This letter is not subject to protective requirements. The attachment / enclosures are subject to Safeguards J!gsamoseeom.

Information protection in

' F' ADOCK 05o00337_

accordance with 10CFR73.21 DCD

-