ML20151V056

From kanterella
Jump to navigation Jump to search
Forwards Special Rept 35, Reactor Containment Bldg Integrated Leak Rate Test, Per 10CFR50,App J.Test Results Meet Required Acceptance Criteria.Next Test Scheduled for 1989 Refueling Outage
ML20151V056
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 02/03/1986
From: Frisch R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20151V060 List:
References
NUDOCS 8602110186
Download: ML20151V056 (2)


Text

-,

-)

6

  • PPT 091TY lim!TIMG m nme Consumers M_61c POW 8r %dt"R company Rd ecx

, m f1LE Zs oeneral offices: 1945 West Pernall Road. Jackson, MI 49:G1 e (5171788-0660 February 3, 1986 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -

SPECIAL REPORT No. 35: REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST - 1985 Special Report No. 35 entitled Reactor Containment Building Integrated Leak Rate Test is attached. This report is submitted in accordance with 10CFR50 Appendix J, Section V.B. Test results meet the required acceptance criteria. The next Integrated Leak Rate Test is tentatively scheduled for the 1989 refueling outage.

l d0' Ralpi R Ffisch A

Senior Licensing Analyst CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Big Rock Point Attachment i

grt D K n

i ss..

OC0186-0016-NLO4 FEB 5M L

4 e d

Censumes power Cengssy c.n.r.: oen. : iens w.. r.ra.is no.a. a.cm.on, us 4ero . Ist? ?so osso February 3, 1986 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -

SPECIAL REPORT NO. 35: REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST - 1985 Special Report No. 35 entitled Reactor Containment Building Integrated Leak Rate Test is attached. This report is submitted in accordance with 10CFR50 Appendix J.Section V.B. Test results meet the required acceptance criteria. The next Integrated Leak Rate Test is tentatively scheduled for the 1989 refueling outage.

Ralph R Frisch (Signed)

Ralph R Frisch Senior Licensing Analyst CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Big Rock Point Attachment OC0186-0016-KLO4 l

>