Text
.~ ...
. ~ - - - .
. . . --
.-
.- .-.- - - -
~ .---
. ~ ,
1
gn tac
UNITED STATES -
a
oq'o
NUCLEAR REGULATORY COMMISSION
8
k
REGION lli
{
j
801 WARRENYlLLE ROAD
2
LISLE, ILLINOIS 60532-4351
- % ,,y , */
September.1, 1998
Mr. D. R. Gipson
Senior Vice President
Nuclear Generation
The Detroit Edison Company
6400 North Dixie Highway
Newport, MI 48166
,
SUBJECT:
FERMI INSPECTION REPORT 50-341/98012(DRP)
Dear Mr. Gibson:
On August 3,1998, the NRC completed an inspection at the Fermi 2 reactor facility. The
enclosed report presents the results of that inspection.
During the 6-week period covered by this inspection, the plant experienced a forced outage
caused by the recurrence of power oscillations due to secondary system equipment problems.
Your evaluation of the event was comprehensive, resulting in potential root cause determination
<
and initiation of corrective actions that required one high pressure turbine throttle control valve to
be closed for the remainder of the cycle. In addition, the report discusses a number of procedure
discrepancies identified in surveillance and work related procedures. The NRC is concemed with
-
. the number of procedure discrepancies identified during the inspection period. Your continued
'
attention to procedure adequacy is warranted.
Based on the results of this inspection, the NRC has determined that a potential violation of NRC
' requirements occurred. The potential violation is described in detail in the subject inspection
report. . This potential violation is of concem because it involves a repetitive failure to implement
effective corrective actions, which resulted in a violation of Technical Specification requirements.
Because your staff was in the process of determining appropriate actions to address the broader
corrective action concem at the end of the inspection period, this violation is being characterized
as a potential violation. After you have completed your assessment of those corrective actions
necessary to prevent reoccurrence, the NRC will process the violation in accordance with the
,
"k
9809110140 990901
ADOCK 05000341
G
[
. .
. ..
.
.
.
D. Gipson
-2-
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, the
enclosure, and your response will be placed in the NRC Public Document Room.
Sincerely,
/s/ Marc L. Dapas for
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket No.: 50-016
Ucense No.: NPF-43
Enclosure:
Inspection Report
50-341/98012(DRP)
cc w/ encl:
N. Peterson, Director, Nuclear Licensing
P. A. Marquardt, Corporate Legal Department
Richard Whale, Michigan Public Service Commission
D, Minnaar, Michigan Department of
Environmental Quality
Michigan Department of Environmental Quality
Monroe County, Emergency Management Division
Emergency Management Division, Ml Department
of State Police
Document: G:\\ferm\\fer98012.drp
To receive a copy of this document, indicate in the box "C" = Copy without attachment / enclosure
"E" = Copy with attachment / enclosure "N" = No copy
OFFICE
RillryM /,,
Ril}9/g
l
Rlll
[_
l
NAME
ES-Yff4"..'dp
BWWs
GGranV/JPF /2V
DATE
09/ 1 98 8
09/h98
09// /98
OFFICIAL RECORD COPY
_
.
.
D. Gipson
-2-
Distribution:
CAC (E-Mail)
Project Mgr., NRR w/enci
J.' Caldwell, Rlli w/enci
C. Pederson, Rlli w/enct
B. Clayton, Rill w/ enc!
SRI Fermi w/enci
DRP w/enci
TSS w/enci
DRS (2) w/enci
Rill PRR w/enci
PUBLIC IE-01 w/enci
Docket File w/enci
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
!I
100027