ML20151U259

From kanterella
Jump to navigation Jump to search
Notification of 880825 Mgt Meeting 88-119 in Plymouth,Ma to Discuss SALP for Period 870201-880515
ML20151U259
Person / Time
Site: Pilgrim
Issue date: 08/04/1988
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8808190006
Download: ML20151U259 (2)


Text

,

, q AUG 04199g No.88-119 U. S. NUCLEAR REGVLATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee: Boston Edison Company Facility: Pilgrim Nuclear Power Station Docket No.: 50-293 Time and Date: 10:00 a.m., August 25, 1988 Location: Sheraton Plymouth at Village Landing 180 Water Street Plymouth, Massachusetts

Purpose:

Management Meeting to Discuss Systematic Assessment of Licensee Licensee Performance (SALP) for the Period February 1,1987 Through May 15, 1988 NRC Attendees: W. Russell, Regional Adninistrator S. Collins, Deputy Director, Division of Reactor Projects (DRP) l J. Durr, Chief. Engineering Branch, Division of Reactor Safety (DRS)

R. Bellamy, Chief, Facilities Radiological Safety and Safeguards Branch, Division of Radiation Safety and Safeguards (ORSS)

J. Wiggins, Chief, Reactor Projects Branch No. 3, ORP R. Blough, Chief, Reactor Projects Section No. 3B, DRP C. Warren, Senior Resident Inspector S. Varga, Director, Division of Reactor Projects I-II, Office of Nuclear Reactor Regulation (NRR)

B. Boger, Assistant Director for Region I Reactors, NRR R. Wessman, Director, Project Directorate I-3, NRR D. M: Donald, Project Manager, NRR Licensee Attendees: R. Bird, Senior Vice President - Nuclear Operations K. Highfill, Station Director R. Anderson, N.sclear Operations Manager R. Ledgett, Executive Assistant to the Senior Vice President NOTE: Attendance by NRC personnel at this meeting should be made known by August 17, 1988 via telephone call to R. Blough, Region I, at FTS 8-346-5146 or (215) 337-5146.

Prepared By:

M Ibc4 %

A. Randy Blough, Chief 8808190006 880804 Reactor Projects Section No. 38 PDR ADOCK 05000293 0 PDC OFFICIAL RECORD COPY LIC MTG NOTICE 88-119 - 0001.0.0 03/04/88 I[

-+-EfW

. .'\

Meeting Notice No 88-119 2 0 4 1988 Distribution:

V. STeTOr. , Executive Director for Operations J. Taylor, Deputy Executive Director for Regional Operations B. Grices, Acting Of rector, Division of Reactor Inspector & Safeguards, NRR J. Lieberman, Director, Office of Enforcement L. Chandler, Assistant General Counsel for Enforcement T. Murley, Director, Of fice of Nuclear Reactor Regulation T. Martin, Acting Associate Director for Inspection & Technical Assessment, NRR S. Varga, Director, Division of Reactor Projects I-II, NRR B. Boger, Assistant Director for Region I Reactors, NRR R. Wessman, Director, Project Directorate I-3, NRR

0. Mcdonald, Project Manager, NRR B. Clayton, Regional Coordinator, E00 Public Document Room (PCR) local Public Document Room (LPDR)

Commonwealth of Massachusetts (2)

W. Griffin, Plymouth Board of Selectmen Honorable William B. Golden, Massachusetts State Senator NRC Resident Inspector bcc:

Regional Acministrator Deputy Regional Administrator Division Di ectors Branch Chiefs Section Chiefs Region I Receptionist Public Affairs Officer DRMA Files ORP Files Eulletin Board M. J. DiDonato, DRP i

l l

RI:DRP RBlough/njd JI:0RP Wiggins v l 8///88 8/ {SS 0FFICIAL RECORD COPY LIC MTG NOTICE 88-119 - 0002.0.0 08/04/88 l

1