Supplemental Deficiency Rept CP-87-101 Re Class 1E Cable Arrangement.Initially Reported on 880111.Documentation on Nonconformance Repts Re Revised Requirements of Electrical Spec 2323-ES-100 Will Be Provided by 881230 for Unit 1
ML20151U073
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/09/1988
From: Beck J, Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-87-101, TXX-88608, NUDOCS 8808180392
Download: ML20151U073 (1)


Text

_.

,=

M==

Log # TXX-88608 i

~

File 8 10110

=

=

908.3 R ' 'OC'" U'b ('I i

illEl CCTRIC August 9, 1988 f

Wmse G. rowinu om,,

m n,,a,,,

i U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555 SUBJECI: COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N05. 50-445 AND 50-446 CLASS 1E CABLE ARRANGEMENT SDAR: CP-87-101 (SUPPLEMENTAL REPORT)

Gentlemen:

On January 11, 1988, we informed you t,j our report logged Txx-88063 of a deficiency involving Class 1E cable arrangement which we deemed reportable under the provisions of 10CFR50.55(e).

This supplemental report is submitted to provide the status of corrective actions.

The documentation on Nonconformance Reports (NCRs) of any multiple single conductors per phase circuits not in agreement with the revised requirements of Electrical Specification 2323-ES-100 (as discussed in TXX-88063) is presently scheduled for completion by December 30, 1988, for Unit 1 and i

prior to fuel load for Unit 2.

[

r Very truly yours, W. G. Counsil t

By:

4).

Jp)hW. Beck Vrce President, Nuclear Engineering WJH/grr c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) fg>1 5" E 8 %,P _