Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-483/98-13.Actions Implementation of Corrective Actions Will Be Reviewed During Future Insp
ML20151T633
Person / Time
Site: Callaway 
Issue date: 09/01/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Randolph G
UNION ELECTRIC CO.
References
50-483-98-13, NUDOCS 9809100093
Download: ML20151T633 (5)


See also: IR 05000483/1998013

Text

.

-,

.__

---

..

..

.

--

i

Q Rtg

+

%

UNITED STATES

[

I ,p,

NUCLEAR REGULATORY COMMISSION

i

tr.

<j

REGION IV

I

g

611 RYAN PLAZA DRIVE. sulTE 400

ARUNGTON, TEXAS 76011 8064

g*****,d

September 1, 1998

Garry L. Randolph, Vice President and

Chief Nuclear Officer

-Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

SUBJECT: NRC INSPECTION REPORT 98-13

Thank you for your letter of August 27,1998, in response to our July 29,1998 letter and

Notice of Violation. We have reviewed your reply and find it responsive to the concerns raised '

i

in our Notice of Violation. We will review the implementation of your corrective actions during a

future inspection to determine that full compUance has been achieved and will be maintained.

i

'

Sincerely,

'

/

f) G M

Blaine Murray, Chief

Plant Support Branch

,

Division of Reactor Safety

,

Docket No.:

50-483

License No.: NPF-30

cc:

Professional Nuclear Consulting, Inc.

.'

19041 Raines Drive

Derwood, Maryland 20855

John O'Neill, Esq.

Shaw, Pittman, Potts & Trowbridge

2300 N. Street, N.W.

Washington, D.C. 20037

H. D. Bono, Supervising Engineer

Quality Assurance Regulatory Support

Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

9909100093 990901

PDR

ADOCK 05000483

G

PDR

,

-..

_ _ - -

- - . - - . -

-

--

..

.

.

.

Union Electric Company

-2-

. Manager- Electric Department

Missouri Public Service Commission

.301 W. High

P.O. Box 360

Jefferson City, Missouri 65102

Ronald A. Kucera, Deputy Director

Department of Natural Resources

P.O. Box 176

Jefferson City, Missouri 65102

i

Otte L. Maynard, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

i

P.O. Box 411

Burlington, Kansas 66839

Dan I. Bolef, President

Kay Drey, Bepresentativn

Board of Directors Coat.:vn

for the Environment

6267 De! mar Boulevard'

University City, Missouri 63130

Lee Fritz, Presiding Co'mmissioner

Callaway County Court House

10 East Fifth Street

Fulton, Missouri 65151

I

Alan C. Passwater, Manager

Licensing and Fuels

AmerenUE

One Ameren Plaza

1901 Chouteau Avenue

P.O. Box 66149

St. Louis, Missouri 63166-6149

J. V. Laux, Manager

~Ouality Assurance

Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

Jerry Uhlmann, Director

State Emergency Management Agency

P.O. Box 116

Jefferson City, Missouri 65101

'

-

-

.

.

-

_

..

. - . .

-

. _

.

I

.

.

Union Electric Company

3-

l

1

-

1

4

i

1

>

.

~.

...

~ . .-.... _ _ -

. - . . . - . - . . . . . _ . . - . -

. . . - . - . . .

. - . - . . . - - . .

.-. -

.

,

Union Electric Company

4-

DISTRIBUTION w/coov of licensee's letter dated Auaust 27.1998:

DCD (IE06)

Regional Administrator

CW Resident inspector

DRS Director .

DRS Deputy Director

DRP Director

DRP Deputy Director

DRS-PSB -

4

. Branch Chief (DRP/B)

Project Engineer (DRP/B)

Branch Chief (DRP/TSS)-

MIS System

RIV File

.DRS. Action . Item File!(Goines) (98-G-0113)

,

d

DOCUMENT NAME: R:\\_CW\\CW813AK.MPS

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy

with enclosures "N" = No copy

4

DRS/PSB A e

E

C:DRS/ PRS

'

MShannorf js.f0 '

BMurray ')

09/1/98

09/\\/98 "

'

OFFICIAL RECORD COPY

.

w

,-

,,,

-

--w-

r-

-

,

_

-

.. .

-

--

.-

..

. . - .

_-

. . - .

.

!

'

4

i;

'

,-

<

Union Electric Company

-4

DISTRIBUTION w/coov of licensee's letter dated Auaust 27.1998:

'

DCD (IE06)(F

Regional Administrator

CW Resident inspector

DRS Director

DRS Deputy Director

DRP Director

DRP Deputy Director

'

DRS-PSB

Branch Chief (DRP/B)

Project Engineer (DRP/B)

Branch Chief (DRP/TSS)

'

MIS System

RIV File

DRS Action Item File!(Goines) (98-G-0113)

.

.

-,.

/

l

,.

DOCUMENT NAME: R:\\ CW\\CW813AK.MPS

ll

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy

l ..

with enclosures "N" = No copy

DRS/PSB A e

E

C:DRS/PSlil

MShannorf 14.fd

BMurray ')

09///98

09/\\/98 "

3

'

OFFICIAL RECORD COPY

'

l

000064

l

.

.

.

.

.

_ _ _ .

-

_

_

_

. . _ . . .

.

__. ._

. . .

'

?

Unha Elictric

Po Box 620

.

Callaway Plant

Fulton, MO 65251

,

3i

.

August 27,1998

,

MI4,

U. S. Nuclear Regulatory Commission

Dgggg Attn:

Document Control Desk

Mail Stop Pl-137

Washington, DC 20555-0001

ULNRC-3882

Gentlemen:

REPLY TO NOTICE OF VIOLATION

INSPECTION REPORT NO. 50-483/98013

CALLAWAY PLANT

UNION ELECTRIC CO.

This responds to Mr. Blaine Murray's letter cated July 29,1998, which transmitted a

Notice of Violation for events discussed in Inspection Report 50-483/98013. Our response

to the violation is presented in the attachment.

,

None of the material in the response is considered proprietary by Union Electric.

If you have any questions regarding this response, or if additional information is required,

please let me know.

Very truly yours,

V. w y

J. V. Laux

Manager, Quality Assurance

JVIJMAR/tmw

Attachment: 1) Response to Violation

g g- Zo64

Nt@STW. L[f.L.,

c.

, . . .l

i

'

'

'e

,

-

-

,

.

.

.

ULNRC-3882

August 27,1998 -

Page 2

cc: Mr. Ellis W. Merschoff

Regional Administrator

U.S. Nuclear Regulatory Commission

Region IV

611 Ryan Plaza Drive, Suite 400

Arlington, TX 76011-8064

Senior Resident Inspector

' Callaway Resident Office

U.S. Nuclear Regulatory Commission

i

8201 NRC Road

Steedman,MO 65077

Ms. Kristine M. Thomas (2 copies)

,

Licensing Project Manager, Callaway Plant

Office of Nuclear Reactor Regulation

U. S. Nuclear Regulatory Commission

Mail Stop 13E16

Washington, DC 20555-2738

Manager, Electric Department

Missouri Public Service Commission

PO Box 360

Jefferson City, MO 65102

Mr. Thomas,A. Baxter

,

Shaw, Pittman, Potts, & Trowbridge

2300 N. Street N.W.

Washington,DC 20037

Mana a, Plant Support

Wolf Creek Nuclear Operating Corporation

PO Box 411

.

Burlington,KS 66839

-

.

_

_ _

_

_ _ _ - _

_ _ _

_

_

__

.

'

,

b

.

..

l

Attachment to

-

ULNRC-3882

August 27,1998

Page1

Statement of Violation

During an NRC inspection conducted on July 14-17,1998, one violation ofNRC

requirements was identified. In accordance with the " General Statement of Policy and

Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below:

10 CFR 20.1501(a) states, in part, "Each licensee shall make surveys or cause to

be made, surveys that - (2) Are reasonable under the circumstances to evaluate the

(ii) concentrations or quantities of radioactive material; and (iii) The potential

radiological hazards that could be present."

Contrary to the above, between April 13-15,1998, grinding / needle gun work was

performed on the 2000-foot elevation of the containment building liner floor plate

without performing surveys to evaluate the concentration or quantities of

radioactive material and the potential airborne radiological hazards that could be

present.

This is a Severity Level IV violation (Supplement 50-483/9813-01).

Reason for the Violation

The reason for this violation was inadequate guidance for performing evaluations for this

type of work and incomplete documentation of evaluations for the work performed

April 13 through April 15,1998.

Callaway Plant believes the controls implemented were reasonable for the circumstances

and adequately protected the worker as evidenced by the absence of Personnel

,

Contamination Events / Incidents or positive Whole Body Counts. However, the following

corrective action is being implemented to strengthen our current program.

Corrective Steps Taken and Results Achieved:

1.

It has been re-emphasized to the Rad / Chem Planner to identify any work documents

for further evaluation which involve abrasive processes that could create a potential

airborne radiological hazard.

2.

The ALARA Supervisor and the ALARA Technicians have been instructed to, in

conjunction with item #1, review the weekly schedule for identified items and any

'

.

.

.,

-

.. . , .

.,

-

.

.

Attachment to

i

ULNRC-3882

'

August 27,1998

Page 2 -

i

4

-

other work' documents which may involve abrasive processes which have the

potential to cause an airborne radiological hazard.

j

.

t

L

3.

HP. Operations personnel have been reminded to evaluate all abrasive processes for

potential fixed contamination prior to start of work. If appropriate documentation

l

l

I

does not establish the absence of fixed contamination, then appropriate engineering

'

controls, containment devices or respiratory protection in conjunction with air

sampling will be employed to assure the worker is adequately protected against

'

'

airborne radiological hazards.

.1

~ Corrective Steos to Avoid Further Violations:

i

Procedural controls will be enhanced to ensure that the absence of fixed contamination is -

evaluated and documented when activities utilizing abrasive processes have the potential

to create an' airborne radiological hazard. This guidance will be contained in procedure

j

- HTP-ZZ-01201, " Preparation and Maintenance of General and Specific Radiation Work'

'

Permits". The procedure will require a documented basis be included with the Radiation -

Work Permit (RWP) for those cases where there is insufficient fixed contamination to

create a radiological airborne hazard.

'

Ifit cannot be determined by review that an acceptable low level of fixed dontamination

exists, HP Personnel have been instmcted to implement appropriate engineering controls

l

L and/or containment devices to protect the worker from airborne contaminants: Air

sampling will be used to verify the adequacy of these controls. When warranted by TEDE

ALARA Evaluations, respirators will be employed to protect the worker until such time as

l

~

air samples can be analyzed and evaluated to determine whether continued use of

respirators is required.

!-

}

L

Date when Full Compliance will be Achieved:

!

IThe procedure revision and training of HP Personnel on the procedure changes will be

.

.~ completed by October 30,1998.

L

,

,

i

l

,

<

m:.

<

.

_

. .

_ , _ _ . - . . _

-

. .

__