Text
u
'o UNITED STATES
~,,
- ["
g NUCLE AR REGULATORY COMMISSION g
p WASHINGTON, D. C. 20555 t
%,*****/e x
APR 0 5198Q
\\
MEMORANDUM FOR:
Jack W. Roe, Director Division of Licensee Performance and Quality Evaluation, NRR FROM:
William H. Regan, Jr., Chief Human Factors Assessment Branch Division of Licensee Performance and Quality Evaluation, NRR
SUBJECT:
STATUS OF ACCELERATED E0P INSPECTION PROGRAM FOR PERIOD ENDING APRIL 1, 1988 This is the first biweekly status report for the subject program. We anticipate preparing short status reports approximately every two weeks for the duration of the effort.
Completed Work All four vender teams have completed training on the vendor guidelines, inspection plan and human factors issues which was l
An inspection plan was developed by Region II staff with input from all Team Leaders and approved by all of the involved Branch Chiefs at a meeting on March 5, 1988.
A human factors protocol and interview guide were developed by NRR j
for use by all teams.
Revised schedules have been established for all 16 plants (enclosed).
During the week of March 21, the two teams scheduled to inspect starting the week of March 28 met in the Team Leader's headquarters for preparatory work.
A draft TI was forwarded to ILRB on March 15, 1988.
A conference call among Branch Chief and Team Leaders was held March 24 to assure all was ready prior to first inspections.,
Contracts were let to PNL and SAIC to provide four human factors
()>
specialists and one licensing examiner to serve as tean members, 9 /i p
/f
,V' ggaan'BAEfda
e Jack W. Roe APR 0 51988 Inspections at Wolf Creek and Crystal River began March 28.
Preliminary feedback from the team leaders indicates that, while several discrepancies have been found with the E0P's, at neither plant were they so serious as to constitute a severe problem.
Plans for next two weeks Exits will be at Wolf Creek on April 6 and at Crystal River on April 7 and 8.
hRR, the host region and Team Leaders region will be represented at the Branch Chief level.
Finalization of TI.
Letter of comrtendation to TTC.
Inspections at Grand Gulf and St. Lucie to begin April 10.
Problems Requests for lap top computers for NRR staff to use on inspections have not been filled.
RSB cannot support all 16 inspections due to other high priority activities. Reactor system specialists are needed either from other NRR units or through contract.
W 111am H. Regan,
/..
ief
~
Human Factors Ass ssmen Branch Division of Licensee Performance and Quality Evaluation, NRR Enclosure
- I As stated l
cc: J. Zwolinski 4
l
(.
c.
o I
C j
o 3,
F-RF
../ecsensky WRegan TTMartin JSniezek ASutthoff GLapinsky iCHaughney f
i
'I s
1 c
d
}
l t
t f
r STAT.US OF ACCELERATED E0P
)
1 0FC
- HFAB:DLPQ
- HFAB:DLPQ I
NAME :JPer bh :WReg lDATE :04/ <I'/88
- 04/?(788 i
i i
0FFICIAL RECORD COPY i
i I
a r
ENCLOSURE F
3/24/88 Rev. 6 TEAM NO. 1 REGION I GENERAL ELECTRIC Team Mer.bers Phone Nos.
Region Plants Insp. Plants Dates Den Florek (TL) 346-5185 Indian Pt-2 (W)
Nine Mile-1 6/20-27 Carl Sisco (IN) 346-5389 Millstone (C>E)
Grand Gulf 4/11-22 Ann Suthoff (HF) 492-1025 Nine Mile -1 (GE)
Hatch 5/2-9 Bob Evans (IN) 728-8150 Dresden 5/30-6/6 George Thonas (NR) 492-0892 EU-Cooper W. Schmidt (RI-9m) 315/342-4042 Simulator - No R. Butcher (RI-GG) 601/437-4620/31 Simulator - Yes Randy Musser (RI-HT) 912/367-9881 Simulater - Yes P. Kouffman (RI-DR) 815/942-9267 Simulator - No Simulator Chattanooga March 21-25 8111 Thurmond/N. J. Lewis, Jr.
TEAM NO. 2 REGION 11 GAGC0CK & WILCOX Team Members Phone Nos.
Region Plants Insp. Plants Dates Sandy Lawyer (TL) 242-4700 Crystal River (B&W)
D.C. Cook 6/27-7/8 Paul Kelle99 (IN) 242-4184 Oconee (B&W Arkansas-1 5/31-6/10 Mark DeGraff (IN) 242-0335 Grend Gulf (GE)
Ocor.ee 4/24-5/6 Mark Archer (HF) 703-759-3553 Hatch (GE)
Crystal Riv. 3/27-4/8 Warren Lyon (NR) 492-0891 St. Lucie (C-E)
BU-none Simulator - No Bill Johnson (RI-RK) 501/968-3290 Simulator - Yes Pierce Skinner (RI-0C) 803/882-6927 Sinulator - Yes Tom Stetka (RI-CR) 904/795-7677 Simulator - Yes Bruce Jorgensen (RI-DC) 616/465-6775 Simulator - No Simulator Hollywood, AL March 14-18 Lenny Reidinger/ Paul Gage TEAM NO. 3 REGION III WESTINGHOUSE Team Members Phone Nos.
P.egion Plants Insp. Plants Dates Ray Love (TL) 388-5593 Prairie island (W)
Prairie Is.
6/12-21 J. A. Hopkins (LE)
Cook Wolf Creek 3/27-4/6 J. A. Lennarts (IN)
Dresden (GE)
Indian Pt-2 4/17-4/29 B. Glickstein (HF) 492-1038 Trojan 5/15-5/27 Chu Yu Liang (NR) 492-3233 BU Robinson
-' ' ~.
(RI-PI)
Simulator - No (RI WC)
Simulator - No (RI-IP)
Simulator - No (RI-TJ)
!1mulator - No l
Simulator Chattanooga, TN February 29 - March 4 Don Nelson / Ralph Jor,e5
o 2
TEAM NO. 4 REGION IV COMBUSTION ENGINEERING Team Members Phone Nos.
Region Plants insp. Plants Dates Perry Stewart (TL) 728-8240 Wolf Creek (W)
Millstone-2 5/8-18 Leo Defferding (LE) 509/375-2925 Arkansas-1 (B&W)
St. Lucie 4/10 20 Jack O'Brien (IN) 463-3722 Waterford (CE)
Waterford 7/5-13 Carol Tolbert (HF) 492-1038 S-Onofre-2&3 6/5-12 Sun Surrer (NR) 492-1058 BU-Palisades (RI-ML)
Simulator - yes (RI-SL)
Simulator - yes (RI-WF)
Sinulator -
(RI-50)
Simulator -
REGION Y l
Jack O'Brien OR Trojan Chris Caldwell to Perry San Onofre-2&3 Stewart's Region IV Team NRC EXIT SUPPORT (ATTENDEES) l Exit Regional Headquarters Station Utility Contact Date Branch Chief Management Managenent l
Nine Mile-1 Harold Barrett Bob Gallo 315/349-2473 346-5291 l
Grand Gulf L. Daughtery Bob Gallo 601/437-2334 346-5291 l
Hatch Steve Bethay Bob Gallo 912/376-7781 x503 346-5291 Dresden Bob Gallo 346-5291 1
Arkansas-1 Dan Howard C. Julian 501/964-6611 242-5541 Oconee C. Julian 242-5541 Crystal River Marjorie Williams C. Julian 904/795-6486 x4363 242-5541 Prairie Island G. Wright l
388-6695 l
Wolf Creek Gary Boyer G. Wright 316/364-8831 x4450 388-5695
3 Regional Headquarters Station Utility Centact Branch Chief Management Management fndian Foint-1 Robtrt Redding G. Wright 914/526-5628 388-5695 Trojan G. Wright 388-5695 Millstone-2 Jeff Smith J. Gagliardo 203/444-4386 728-8141 Stc Lucie L. McLaughlin J. Gagliardo 505/464-3550 x3574 728-8141 Waterford J. Gagliardo 728-8141 San Onofre J. Gaoliardo 728-8141 BU Plants Cooper l
Robinson Joe Curley i
803/383-1367 Palisades D. C. Cook Paul Barrett l
614/223-2040 i
i I
l l
1 1
I e
l 1
4
-