ML20151T211
| ML20151T211 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/08/1998 |
| From: | Olshan L NRC (Affiliation Not Assigned) |
| To: | Sumner H SOUTHERN NUCLEAR OPERATING CO. |
| References | |
| NUDOCS 9809090296 | |
| Download: ML20151T211 (4) | |
Text
..
,e hp-92( 2%
g t
UNITED STATES g
j NUCLEAR REGULATORY COMMISSION o
WASHINGTON, D.C. 20066-4001 o
September 8, 1998 Mr. H. L. Sumner, Jr.
Vice President - Nuclear Hatch Project Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201-1295
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE EDWIN 1. HATCH NUCLEAR PLANT, UNITS 1 AND 2
Dear Mr. Sumner:
By your application dated July 31,1998, and affidavit dated August 5,1998, executed by George B. Stramback, General Electric Company (GE), you submitted Table 4-1,
" Containment Performance Results," of GE Nuclear Energy Safety Analysis Report NEDC-32749P in support of the extended power uprate license amendment, and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790. A nonproprietary version was submitted for placement in the NRC's public document room.
GE stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(4)a.
[The] information that discloses a process, method, or apparatus, 4
including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies; b.
[The) information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information.
Therefore, Table 4-1 of NEDC-32749P, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
O Withholding from public inspectien shall not affect the right, if any, of persons properly and directly concemed to inspect the documents. If the need arises, we may send copies of this
, j[ i information to our consultants working in this area. We will, of course, ensure that the i
consultants have signed the appropriate agreements for handling proprietary information.
9 h
N
{fifb P
.4 H. L. Sumner, Jr. September 8, 1998 If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, ORIGINAL' SIGNED BY:
l Leonard N. Olshan, Senior Project Manager Project Directorate ll-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366 cc: See next page Distribution:
Docket File HBerkow LPlisco, Ril PUBLIC LBerry PSkinner, Ril PD 11-2 Rdg.
LOlshan JZwolinski MPSiemien, OGC Te receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = Nc copy
/\\ n lOFFICEP PM:PDil-2 l
LA:PDy 'A _ E OGC lc D:PA2/ C l
7 g
lNAMEWLOlshan:cn LBerry \\j(\\ l MPSiemien f5-Hperkdk /
[
n lDATE 9 /7-/98 d/\\/98 49 /J/98 (t / 8 /98
/ /98
/ /97 DOCUMENT NAME: G:\\ HATCH \\32749P. WIT OFFICIAL RECORD COPY
m 1
r H. L. Sumner, Jr. i if the basis for wRhholding this information from public inspection should change in the future
(
- such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act i
request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, Leonard N. Olshan, Senior Project Manager Project Directorate ll-2 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366 cc: See next page l
l l
l l
i 4
e 2
4
~
~
Edwin 1. Hatch Nuclear Plant cc:
Mr. Emest L. Blake, Jr.
Charles A. Patrizia, Esquire Shaw, Pittman, Potts Paul, Hastings, Janofsky & Walker and Trowbridge 10th Floor 2300 N Street, NW.
1299 Pennsylvania Avenue Washington, DC 20037 Washington, DC 20004-9500 Mr. D. M. Crowe Chairman Manager, Licensing Appling County Commissioners Southem Nuclear Operating County Courthouse Company, Inc.
Baxley, Georgia 31513 P. O. Box 1295 Birmingham, Alabama 35201-1295 Mr. J. D. Woodard Executive Vice President Resident inspector
'Iouthem Nuclear Operating Plant Hatch Company, Inc.
11030 Hatch Parkway N.
P. O. Box 1295 Baxley, Georgia 31531 Birmingham, Alabama 35201-1295 Regional Administrator, Region 11 Mr. P. W. Wells U.S. Nuclear Regulatory Commission General Manager, Edwin 1. Hatch Atlanta Federal Center Nuclear Plant 61 Forsyth Street, SW, Suite 23T85 Southem Nuclear Operating Atlanta, Georgia 30303 Company, Inc.
U.S. Highway 1 North Mr. Charles H. Badger P. O. Box 2010 Office of Planning and Budget Baxley, Georgia 31515 Room 610 270 Washington Street, SW.
Mr. R. D. Barker Atlanta, Georgia 30334 Program Manager Fossil & Nuclear Operations Harold Reheis, Director Oglethorpe Power Corporation Department of Natural Resources 2100 East Exchange Place 205 Butler Street, SE., Suite 1252 P. O. Box 1349 Atlanta, Georgia 30334 Tucker, Georgia 30085-1349 Steven M. Jackson
? Senior Engineer-Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, Georgia 30328-4684
.