Forwards Application for Amend to License DPR-50 Consisting of Tech Spec Change Request 184 Re Increase in Rated Power from 2,535 Mwt to 2,568 Mwt.Fee Paid
ML20151T032
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 04/18/1988
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20151T037 List:
References
C311-88-2036, NUDOCS 8804280559
Download: ML20151T032 (2)


Text

GPU Nuchar Corporation G u. Nuclear  :::,orareo Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 April 18, 1988 Writer's Direct Dial Nurnber:

C311 2036 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Three Mile Island Nuclear Generating Station, Unit 1 (TMI-1) j Operating License No. DPR-50 Docket No. 50-289 Technical Specification Change Request No.184 -

Rated Power Upgrade  :

In accordance with 10 CFR 503 (b)(1), enclosed is one (1) original, and in addition ten (10) conformed copies of Technical Specification Change Request No. 184.

Also, enclosed is one signed copy of the Certification of Service for this request to the chief executives oi' the township and county in which the l facility is located, as well as the Bureau of Radiation Protection.

The proposed armndment consists of revisions to those sections of the Technical Specifications and to the Facility Operating License to allow an increase in the rated power for TMI-1 from 2535 MWt to 2568 MWt. Review of the FSAR accident analyses and evaluation of core performance at a rated power of 2568 MWt is provided in the TMI-l Cycle 7 Reload Report (BAW-2015, March 1988), submitted previously via GPUN letter C311-88-2033. The Reload Report also supports Cycle 7 Technical Soecification operational limits for operation at a rated power of 2568 MWt. Additional supporting evaluations are provided hereir,.

The reference design power level for TMI-1 is 2568 MWt, and most of the FSAR Chapter 14 accident analyses reviewed by HRC during the original licensing of THI-l were performed at a power level of 2568 MWt.

Pursuant to 10 CFR 50.91 (a)(1), we enclose our analyses, using the standards in 10 CFR 50.92 of significant hazards considerations. As stated above, pursuant to 10 CFR 50.91 (a) of the regulations, we have provided a copy of this letter, the proposed change in Technical Specifications, and our analyses ,

of significant hazards considerations to Thomas Gerusky, thc designated f representative of the Commonwealth of Pennsylvania, p The anticipated Cycle 7 startup is August 19, 1988. Therefore, GPUN requests O that Operating License No. DPR-50 be amended by July 1,1988 to allow kk sufficient time for operator training, procedure revisions, and process computer revisions prior to Cycle 7 start up, dj hqi i

th GPU Nuclear Corporation is a subsidlary of the Genersi Public Utilities Corporation )

8804280559 880418 PDR ADOCK 05000209 P DCD

'.. t

. C311 2036 April 18, 1988 L

Pursuant to the provisions of 10 CFR 170.21, enclosed is a check for $150.00 as payment of the fee associated with Technical Specification Change Request No. 184.

Sincerely,

. D. kill Vice President and Director, TMI-l HDH/DJD:fg Attachments 6528f/0169f cc: J. Stolz, USNRC t R. Hernan, USNRC W. T. Russell, USNRC, Region I R. Conte, USNRC, THI-l Site Attachments:

1. Technical Specification Change Request No.184 <
2. Certificate of Service for Technical Specification Change Request No.184
3. Check No. 307851 h