ML20151S917
| ML20151S917 | |
| Person / Time | |
|---|---|
| Issue date: | 08/03/1988 |
| From: | Jordan E Committee To Review Generic Requirements |
| To: | Bernero R, Goldberg J, Paperiello C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), NRC OFFICE OF THE GENERAL COUNSEL (OGC) |
| References | |
| REF-GTECI-B-56, REF-GTECI-EL, RTR-REGGD-01.009, RTR-REGGD-1.009, TASK-B-56, TASK-OR NUDOCS 8808160164 | |
| Download: ML20151S917 (2) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _.
S= L.w pm.,
o UMito sTAf ts UOj n
{ %.- // }*:
NUCLE AR REGUL ATORY COMMISSION wasmNotos.o e rossi
\\..'... /
August 3, 1988 MEMORANDUM FOR:
Robert M. Bernero, hMS$
Jack R. Goldberg, OGC Carl J. Paperiello, RI!!
Denwood F. Ross, RES i
James H. Snlezek, NRR 1
FROM:
Edward L. Jordan, Chairman Committee to Review Generic Requirements t
SUBJECT:
CRGR MEETING NO. 144 REV!$!0N 1 l
t The Committee to Review Generic Requirements (CRCR) will retet in the af ternoon on Wednesday, August 10, 1988 in Room MNBB 6507.
The agenda is as follows:
1 2 p.m.
G. Arlotto (RES) will present for CRGR review the proposed final Reg. Guide, Qualification of Safety-Related Lead Storage Batteries for Nuclear Power Plants."
(The review package is enclosed.)
r 2 3 p.m.
W. Houston (RES) will present for CRGR review a proposed Rev. 3 to
(
Reg. Guide 1.9, "Selection Design, Qualification, Testing, and i
Reliability of Diesel Generator Units Used as Onsite Electric Power l
Systems at Nuclear Power Plants" (relating to the resolution of Generic Safety Issue B-56).
(The review package is enclosed.)
l I
3 4 p.m.
L. 5,hao (NRR) will present for CRGR review a proposed NRC staff $ER i
on generic BWR Emergency Procedure Guidelines.
(The review package
{
is enclosed.)
l t
If a CRGR member cannot attend the meeting, it is his responsibility to assure that an alternate, who is approved by the CRGR Chairman, attends the meeting, t
Persons making presentations to the CRGR are responsible for (1) assuring that I
the information required for CRGR review is provided to the Committee (CRGR I
Charter IV.8), (2) coordinating and presenting views of other offices, (3) as appropriate, assuring that other offices are represented during the presenta-i tion, and (4) assuring that agenda modifications are coordinated with the CRGR contact (J. Conran X29855) and others involved with the presentation.
Division Directors or higher management should attend seetings addressing agenda items under their purview.
In accordance with the E00's March 29, 1984 memorandum to the Commission I
concerning "Forwarding of CRGR Occuments to the Public Document Room (POR),"
the review packages for, items scheduled at this meeting, which contain i
t
[
t t
[
L 190t If o I6[
t
e
.g.
predecisional information, will not be released to the POR until the NRC has considerec (in a public forum) or decided the matter accressed by the information.
%=154aed Dr.
t L Awdm Edward L. Jordan, Chairman Committee to Review Generic Requirements
Enclosures:
As stated cc w/ enclosures:
SECY V. Stello, Jr.
cc w/o enclosures:
Commission (5)
J. Lieberman J. Partlow W. Mcdonald Regional Acministrators W. Parler C. Berlinger G. Arlotto W. Houston L. Shao A. Serki:
S. Aggarwal G. Tr.omas Ofstributi: :
F... o i.. '
J, Heltemes J. Conran C. Sakenas R. Fraley B. Doolittle (w/o en,c.)
CRGR SF
- 5. Treby (./o ene.)
J. Hoyle (=/o enc. )
M. Taylor OEDO POR (NRC/CR3R) (w/o enc. )
Central File (w/o ene.)
6TC
- AEQ4tCRGR AE
'..ic/CRGR:AE00 :
'te NAME :J onran:cg CdHel EL)ordan
.............................'es
..... h...f/
DATE
$br/.1/88
$(I/')/83
/ /88 i
v
-/0FFICIAL RECORD CCPY