ML20151S814

From kanterella
Jump to navigation Jump to search
Advises That Response to Encl Action Item 3824 Re Design & Const of Us Nuclear Power Plants Should Be Submitted to Div of Engineering & Sys Technology by 880718
ML20151S814
Person / Time
Issue date: 07/12/1988
From: Norberg J
Office of Nuclear Reactor Regulation
To: Thadani A
NRC
Shared Package
ML20151S769 List:
References
NUDOCS 8808160119
Download: ML20151S814 (1)


Text

_ _

Ih 'o,, , UNITED STATES

~8' o NUCLEAR REGULATORY COMMISSION 3 e '

WASHING TON, D. C. 20555

  • ..+* July 12, 1988 NOTE T0: A. Thadani/W. Hodges FROM: James Norberg, Special Assistant Division of Engineering and Systems Technology

SUBJECT:

GREEN TICKET ACTION ITEM NO. 3824 -

REQUEST INFORMATION ON DESIGN AND CONSTRUCTION OF US NUCLEAR POWER PLANTS The response to the attached action item is due to DEST (Mr. Shao's Office, 6 8E1) by:JulyJ18p1988.

Please make sure that D/ DEST receives a copy of the final ticket response.

When preparing the response, please add to the concurrence page distribution list "LShao" and the appropriate ticket number identifying the action item.

For example, LShao (WITS 87-XX or DEST 87-XX or YT879XXX or EDO #26XX).

It is DEST policy that the Director receive responses for all tickets at least one working day prior to the due date. If the original action item due date is changed, please inform Nancy at X20884, she will then revise the DEST due date accordingly. You should also keep Nancy informed on the status of all

., EDO, Green Tickets, WITS) assigned to your controlled office (e.g.,action to whatitems branch (e.g/persen the action item was assigned to).

.' rtste b $

James Norberg, Special Assistant Division of Engineering and Systems Technology l

l l

l I

8808160119 8G0728 '

PDR MISC 8806160104 PDC L___._______