- - - - - - _ _ _ - _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _.
I EntIrgy operitions, Inc.
~*
1448 5FL 333 RusscMe.M 72801 Tel 501858-4888
_9 C. Randy Hutchinson Vre Pesjent August 26,1998 RER-98-00035 Mr. Ellis Merschoff Regional Administrator U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 SUB.YECT:
Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. OPR-51 I
Final RO and SRO Initial License Applications Dear Mr. Merschoff Enclosed is a corrected In-plant Significant Reactivity Control Manipulations per Section 13.3.c for Michael Eugene Harris. The affected candidate's current Docket No. is 55-40885.
The applications for the SRO upgrade candidates and other RO's should remain unchanged and the previous submittal for those candidates should be considered the final application.
Should you require further information regarding this request, please contact Jerry Giles at (501) 858-6844.
Sincerely,
{
'b C. Randy Hutchinson f
Vice President Operations - ANO I
CRH/Ir,
. Enclosures
.s,, uo.*
l
[
4
./
l i
- (
9908310273 990826 PDR ADOCK 05000313 3
-V PDR 4 ~%,
'+U
! y,,,
3 4.,
...~
l Mr Ellis Merschoff August 26,1998 -
RER-98-00035. Page 2.'
cc:
Mr. John Pellet, Chief Operator Licensing Section U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064
)
NRC Senior Resident Inspector Arkansas Nuclear One - ANO ' Number 1, Nuclear Plant Road RusselMile, AR 72811 U. S. Nuclear Regulatory Commission
- Document Control Desk Mail Station PI-137 Washington,DC 20555
' CMS File - Licensing ANO-DCC '
o s,
Michael Eugene Harris 55-40885 17 comments (continuation) 13.3.c Significant In-Plant Reactivity Manipulations
- 1. 3/11/98 - Withdrew Axial Power Shaping Rods (APSRs) ~ 4% for end of cycle APSR withdrawal i
- 2. 3/27/98 - Reduced power from 80% to 70% during shutdown for 1R14.
3, 3/27/98 - Reduced power from 40% to 30% during shutdown for 1R14.
- 4. 6/2/98 - Diluted b'oron concentration by 1 ppm to maintain rod position.
- 5. 8/16/98 - Reduced power from 100% to 97% for circulating water pump operations.
j
- 6. 8/16/98 - Escalated power from 97% to 100% der circulating water pump operations completed j