e

-Docket No. 50-346 7g g g License No. NPF-3 EDISON Serial No. 1-613 January 29, 1986 JOE WILUAMS JR Serwr vce prendent-Partes (419)249 2300 (419}249-5223 Mr. John A. Hind, Director Division of Radiation Safety and Safeguards United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Hind:

During your inspection of October 10 - 11,1985 (detailed in Inspection Report No. 50-346/85034 (DRSS) dated October 25,1985 (Log No. 1-1266)),

Toledo Edison indicated that the annual emergency preparedness requalific-ation training may necessitate delay and that an exemption would be prepared for this proposed delay pending revision of the Emergency Plan and Implementing Procedures. Since that time, Toledo Edison has reviewed the supplemental Emergency Plan training which has been provided to Licensed Operators during 1985 and has determined that the supplemental training is acceptable for meeting the annual emergency preparedness requalification training requirements. Therefore, an exemption for the requalification training is not required. This determination has been discussed with your Mr. Thomas Ploski and, per his request, the supple-mental Emergency Plan training which Toledo Edison has found acceptable for meeting the annual requalification requirements is detailed in Attachment I for your information.

Toledo Edison has scheduled the next emergency preparedness requalification training for Licensed Operators for July-August, 1986. This schedule is consistent with the training requirements of the Emergency Plan and provides an additional two-fold benefit. First, this schedule will ensure that the extensive maintenance and testing activities now in progress at Davis-Besse to support restart are afforded the attention and expertise of Station Operating personnel at all times. Second, the schedule will allow the planned revision of the Emergency Plan.and Implementing Procedures to be approved and in place prior to the 1986 training.

It should also be noted that the training schedule supports schedules for the Annual Emergency Exercise Dress Rehearsal (scheduled for August 27, 1986) and the Annual Emergency Exercise (scheduled for September 23, 1986).

Very truly yours,

& (A) h

)h kh 8602060259 860129 JW:RMC:lah PDR ADOCK 05000346 attachment G

PDR p

\\

cc: DB-1 NRC Resident Inspector FEB 3 1986 T. Ploski THE TOLEDO EO! SON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652

?

O SUPPLEMENTAL EMERGENCY PLAN TRAINING GIVEN IN 1985 CLASSROOM TRAINING:

On Shift Licensed Operator (R0 & SRO)

Date Subject 6/17/85 thru 7/26/85 Emergency Plan Activation (EI-1300.01)

Reviewed procedure with emphasis on re-sponsibilities for classifying an event and activating the Plan.

Ceneral Emergency (EI 1300.05)

Reviewed procedure noting the responsi-bilities of the Interin EDO, immediate notification of the State of Ohio, and the Shift Technical Advisor's responsi-bilities.

7/8/85 thru 8/9/85 Station Response to Emergencies (EI 1300.00)

Reviewed procedure emphasizing responsi-bility for activating the Emergency Plan and authorization for radiation exposures above the 10 CFR 20 limits.

6/3/85 thru 7/12/85 Toxic Gas or Liquid Release Procedure 6/24/85 thru 8/9/85 Steam & Feedwater Rupture Control System (SFRCS) Auxiliary Feedwater (AFW),

Reactor Protection System (RPS),

Anticipatory Reactor Trip System (ARTS).

Special emphasis was placed co actuation /

failure of these systems versus the Emergency Action Levels (EAL's).

Senior Reactor Operator (New SRO's)

Approx. 11/1/85 Emergency Plan (One Day Sescion)

Shift Technical Advisor 11/4/85 thru 11/6/85 Comprehensive Energency Duty Officer Training

INL REQUIRED READING:

All Licensed Operators Date Subject 12/27/85 IE 85-80, Timely declaration of an emergency, classification, implementation of Emergency Plan, and emergency notification.

12/27/85 AD 1827.17, T-9677 - Emergency Call Systen 12/27/85 EI 1300.01, T-9740 - Emergency Plan Activation 12/27/85 AB 1203.14, Rev. 5 - Toxic Gas or Liquid Release Non-Shift Licensed Operators (R0 & SRO) 5/21/85 AB 1203.14, Rev. 3 - Toxic Gas or Liquid Release Non-Licensed Personnel 12/27/85 AB 1203.14, Rev. 5 - Toxic Gas or Liquid Release DRILLS / EXERCISES:

6/26/85 Dry-Run for Annual Exercise 7/16/85 Annual Emergency Preparedness Exercise