MONTHYEARML20154N0091998-10-13013 October 1998 Forwards Notice of Docketing & Acceptance Review of License Amend Application for GE - Morris Operation ISFSI & Associated Tss.Notice Has Been Forwarded to Ofc of Fr for Publication ML20154J5311998-10-0909 October 1998 Informs That NMSS Is Updating Distribution List for Correspondence Associated with GE - Morris Operation Isfsi. Licensee Is Requested to Verify That Address Info Is Correct by 981110 ML20151R6621998-08-25025 August 1998 Informs That Pg Brochman Has Assumed Project Mgt Responsibilities for Gemo Isfsi.All Communications W/Nrc Should Be Directed to Brochman as Point of Contact for Facility ML20056F8781993-08-23023 August 1993 Acks Receipt of Transmitting Changes Identified as Rev NEDS-14507-D3 to Morris Operation Physical Plan Per 10CFR72.186(b).Changes Consistent W/Provisions of 10CFR72.186(b) & Acceptable ML20126J1831992-12-30030 December 1992 Ack Receipt of in Response to NRC , Clarifying Concerns Re GE Morris Groundwater Monitoring Evaluation.Evaluation Acceptable ML20126J2151992-12-0303 December 1992 Provides Update & Requested Amplifying Info on Issues Discussed in NRC Re Description of Existing Well Functional Capabilities,Drinking Water Analysis,Aquifer Performance & Vault & Basin Leak Detection Sys ML20062C7851990-09-27027 September 1990 Responds to NRC Re Violations Noted in Insp Rept 72-0001/90-01.Corrective Actions:Procedures Reviewed W/ Personnel Re Review of Special Work Permits ML20059D8831990-08-29029 August 1990 Forwards Safety Insp Rept 72-0001/90-01 on 900212-14,0530,31 & 0601 & Notice of Violation ML20246P4731989-07-19019 July 1989 Forwards NRC Info Notice 89-045,Suppl 1, Metalclad,Low Voltage Power Circuit Breakers Refurbished W/Substandard Parts. No Action or Response Required ML20244B7331989-04-13013 April 1989 Forwards Safety Insp 72-0001/89-01 on 890227-0303 & Forwards Notice of Violation ML20246M0681989-03-17017 March 1989 Forwards GE Annual Rept for 1988 ML20246L5071989-03-0202 March 1989 Advises That 890216 Rev to Physical Security Plan Consistent W/Provisions of 10CFR72.33(e) & Acceptable ML20151S9321988-07-27027 July 1988 Responds to Violations Noted in 880720 Insp Rept.Corrective Actions:Technician Reinstructed Re Protective Clothing ML20196E1501988-02-19019 February 1988 Forwards Safety Insp Rept 72-0001/88-01 on 880111-15.No Violations Noted IR 07200001/19870011987-05-0808 May 1987 Forwards Insp Repts 72-0001/87-01 & 30-29361/87-01 During Nov 1986 Through 870424 & Notice of Violation from 861006-10 Insp.Insp on 870210-13 & 18-20 Also Discussed.No Response Required Since Corrective Actions Already Taken ML20210D2341987-01-16016 January 1987 Forwards Changes to Physical Security Plan,Correcting Reporting Requirements Found in Error During NRC Insp. Changes Withheld (Ref 10CFR73.21) ML20212E4731986-12-29029 December 1986 Forwards Safeguards Insp Rept 72-0001/86-05 on 861215-16 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR73.21) ML20213G0401986-11-0505 November 1986 Forwards Insp Rept 72-0001/86-02 on 861006-10.Decision on Enforcement Action Re Violations Forthcoming in Separate Correspondence ML20197A4971986-10-21021 October 1986 Confirms 861028 Meeting at Region III Ofc in Glen Ellyn,Il to Discuss Results of Radiation Protection Insp Conducted on 861006-10,proposed Corrective Actions & NRC Enforcement Options ML20211E5261986-10-17017 October 1986 Advises That 860917 Changes to Physical Security Plan Consistent W/Provisions of 10CFR72.33(e) & Acceptable ML20209A7941986-08-29029 August 1986 Confirmatory Action Ltr Re 860828 Telcon Discussing Proposed Measures to Be Taken to Ensure That External Package Contamination Levels Do Not Exceed DOT Limits During Transport ML20212P4331986-08-27027 August 1986 Confirmatory Action Ltr Re 860827 Telcon Concerning High Levels of Removable Contamination Measured on Surface of IF-300 Casks on 860729 & 0819.NRC Understands That Casks Will Not Be Released Until Acceptable Measures Taken ML20203E2271986-07-18018 July 1986 Forwards Safety Insp Rept 72-0001/86-01 on 851119-860715.No Violations Noted ML20155F6711986-04-18018 April 1986 Advises That 860404 Rev to Physical Security Plan Consistent W/Provisions of 10CFR72.84(b) & Acceptable.Future Revs to Plan Should Be Sent to Region III at Listed Address ML20197E9081986-04-0404 April 1986 Forwards Changes to Physical Security Plan.Encl Withheld (Ref 10CFR2.790) ML20138B2401985-12-0606 December 1985 Appeals NMSS 851104 Denial of Illinois Safe Energy Alliance 850829 Petition Seeking Detailed Environ Review of GE Interim Spent Fuel Storage Facility in Morris,Il.Facility Never Accorded Review Envisioned Under NEPA & 10CFR51 ML20137Z1131985-12-0404 December 1985 Requests Review of Director'S Decision Denying Request for Federal EIS for GE Morris Operation Due to Numerous Deficiencies in Decision,Including Disregard for Recent Changes in Scope & Nature of Operation ML20138R1501985-11-12012 November 1985 Supports Illinois Safe Energy Alliance 850829 Petition Re License Granted to GE on 820504 for Spent Nuclear Fuel Storage Facility.Nrc Action on EIS Requested IR 05000313/20100071985-10-17017 October 1985 Forwards Insp Rept 72-0001/85-02 on 850313-1007.No Noncompliance Noted ML20209G3271985-09-13013 September 1985 Ack Receipt of Transmitting Changes to Physical Security Plan.Changes Consistent w/10CFR72.84(b) & Acceptable.Amend Fee Will Be Returned ML20128G6091985-06-28028 June 1985 Informs of Acceptance of 840531 & 850531 Annual Updates to Consolidated SAR for Morris Operation.No Comments Offered ML20054J4491982-06-22022 June 1982 Informs That No Addl Category 1H(a) Fee Will Be Required for 790227 Renewal Application for License SNM-1265.Max Fee,Per 10CFR170.31,paid 1998-08-25
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20154N0091998-10-13013 October 1998 Forwards Notice of Docketing & Acceptance Review of License Amend Application for GE - Morris Operation ISFSI & Associated Tss.Notice Has Been Forwarded to Ofc of Fr for Publication ML20154J5311998-10-0909 October 1998 Informs That NMSS Is Updating Distribution List for Correspondence Associated with GE - Morris Operation Isfsi. Licensee Is Requested to Verify That Address Info Is Correct by 981110 ML20151R6621998-08-25025 August 1998 Informs That Pg Brochman Has Assumed Project Mgt Responsibilities for Gemo Isfsi.All Communications W/Nrc Should Be Directed to Brochman as Point of Contact for Facility ML20056F8781993-08-23023 August 1993 Acks Receipt of Transmitting Changes Identified as Rev NEDS-14507-D3 to Morris Operation Physical Plan Per 10CFR72.186(b).Changes Consistent W/Provisions of 10CFR72.186(b) & Acceptable ML20126J1831992-12-30030 December 1992 Ack Receipt of in Response to NRC , Clarifying Concerns Re GE Morris Groundwater Monitoring Evaluation.Evaluation Acceptable ML20059D8831990-08-29029 August 1990 Forwards Safety Insp Rept 72-0001/90-01 on 900212-14,0530,31 & 0601 & Notice of Violation ML20246P4731989-07-19019 July 1989 Forwards NRC Info Notice 89-045,Suppl 1, Metalclad,Low Voltage Power Circuit Breakers Refurbished W/Substandard Parts. No Action or Response Required ML20244B7331989-04-13013 April 1989 Forwards Safety Insp 72-0001/89-01 on 890227-0303 & Forwards Notice of Violation ML20246L5071989-03-0202 March 1989 Advises That 890216 Rev to Physical Security Plan Consistent W/Provisions of 10CFR72.33(e) & Acceptable ML20196E1501988-02-19019 February 1988 Forwards Safety Insp Rept 72-0001/88-01 on 880111-15.No Violations Noted IR 07200001/19870011987-05-0808 May 1987 Forwards Insp Repts 72-0001/87-01 & 30-29361/87-01 During Nov 1986 Through 870424 & Notice of Violation from 861006-10 Insp.Insp on 870210-13 & 18-20 Also Discussed.No Response Required Since Corrective Actions Already Taken ML20212E4731986-12-29029 December 1986 Forwards Safeguards Insp Rept 72-0001/86-05 on 861215-16 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR73.21) ML20213G0401986-11-0505 November 1986 Forwards Insp Rept 72-0001/86-02 on 861006-10.Decision on Enforcement Action Re Violations Forthcoming in Separate Correspondence ML20197A4971986-10-21021 October 1986 Confirms 861028 Meeting at Region III Ofc in Glen Ellyn,Il to Discuss Results of Radiation Protection Insp Conducted on 861006-10,proposed Corrective Actions & NRC Enforcement Options ML20211E5261986-10-17017 October 1986 Advises That 860917 Changes to Physical Security Plan Consistent W/Provisions of 10CFR72.33(e) & Acceptable ML20209A7941986-08-29029 August 1986 Confirmatory Action Ltr Re 860828 Telcon Discussing Proposed Measures to Be Taken to Ensure That External Package Contamination Levels Do Not Exceed DOT Limits During Transport ML20212P4331986-08-27027 August 1986 Confirmatory Action Ltr Re 860827 Telcon Concerning High Levels of Removable Contamination Measured on Surface of IF-300 Casks on 860729 & 0819.NRC Understands That Casks Will Not Be Released Until Acceptable Measures Taken ML20203E2271986-07-18018 July 1986 Forwards Safety Insp Rept 72-0001/86-01 on 851119-860715.No Violations Noted ML20155F6711986-04-18018 April 1986 Advises That 860404 Rev to Physical Security Plan Consistent W/Provisions of 10CFR72.84(b) & Acceptable.Future Revs to Plan Should Be Sent to Region III at Listed Address IR 05000313/20100071985-10-17017 October 1985 Forwards Insp Rept 72-0001/85-02 on 850313-1007.No Noncompliance Noted ML20209G3271985-09-13013 September 1985 Ack Receipt of Transmitting Changes to Physical Security Plan.Changes Consistent w/10CFR72.84(b) & Acceptable.Amend Fee Will Be Returned ML20128G6091985-06-28028 June 1985 Informs of Acceptance of 840531 & 850531 Annual Updates to Consolidated SAR for Morris Operation.No Comments Offered ML20054J4491982-06-22022 June 1982 Informs That No Addl Category 1H(a) Fee Will Be Required for 790227 Renewal Application for License SNM-1265.Max Fee,Per 10CFR170.31,paid 1998-08-25
[Table view] |
Text
- - -_-... . . - . - . - _ . - - _ . _ . - - - .. - . - - . - - . - ..
/ August 25, 1998 Mr. James E. Ellis Manager, Morris Operation
. General Electric Company 7555 East Collin's Road Morris, IL 60450-97f0
SUBJECT:
PROJECT MANAGER FOR THE GENERAL ELECTRIC COMPANY - MORRIS (GEMO) INDEPENDENT SPENT FUEL STORAGE INSTALLATION
Dear Mr. Ellis:
This letter is to inform you that Mr. Philip G. Brochman has assumed project management responsibilities for the GEMO independent spent fuel storage installation (Docket No. 72-01).
Mr. Brochman is a Project Manager in the Spent Fuel Licensing and inspection Directorate of the Spent Fuel Project Office in the Office of Nuclear Material Safety and Safeguards. He may l be reached at telephone number (301) 415-8592 or at e-mail PGB@nrc. gov, All communications with the Nuclear Regulatory Commission (NRC) should be directed to Mr. Brochman as the point of contact for your facility. Future, original, correspondence should be submitted to the NRC Document Control Desk in accordance with 10 CFR 72.4. Any courtesy copies of such correspondence should be sent to Mr. Brochman at the NRC's Washington, DC 20555-0001 address, at Mail Stop 06-G22.
Sincerely, .
l
. original /s/ by Susan Shankman Eric J. Leeds, Section Chief Spent Fuel Licensing Section Spent Fuel Licensing and Inspection Directorate Spent Fuel Project Office .
Office of Nuclear Material Safety and Safeguards Docket No.: 72-01 i>
'V cc: Service List p'g d '"
{'> , . - ..
f Distribution: .
If l DOCKET. ,3ENRC File' Conte'r7 *PUBLIC SFPO r/f i( 0 NMSS r# SFLS r/f VTharpe WKane .klI j CHaughney SShankman WHodges FSturz PEng EEaston TMcGinty WReamer, OGC NJensen, OGC RLandsman, Rlli BJorgensen, Rlil File Name: G:Brochman%emoVow-pm.Rr Proofed By' Division: Date: / /
l oFC SFPo:TSSS C SFPo[FMg/ C ,
NAME PBrochman:dd /d ELeod
- DATE 08/.2 ( 4 8 08/ b / S8 / /98
! C = Cover only E = Cover & Enclosures N = No Copy
,. v * (* OFFICIAL RECORD COPY 9808290125 990825 T PDR ADOCK O'7200001 C ppR 3;
..y _ -