Submits Schedular Changes Needed to Complete Remaining Human Engineering Deficiency Resolutions by Upgrading Main Control Board Based on Results of Dcrdr Required by NUREG-0737,Suppl 1
ML20151R345
Person / Time
Site: Maine Yankee
Issue date: 01/31/1986
From: Whittier G
Maine Yankee
To: Thadani A
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737 GDW-86-27, MN-86-16, NUDOCS 8602060036
Download: ML20151R345 (2)


Text

.

~

RIAIRE HARHEE ATOMICPOWERCGIRPARUe avaus,,Y,,i,*,in"e c%

(207) 623-3521 e

January 31, 1986 MN-86-16 GDW-86-27 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Mr. Ashok C. Thadani, Director PWR Project Directorate #8 Division of Licensing

References:

(a) License No. CPR-36 (Docket No. 50-309)

(b) MYAPCo Letter to USTEC dated Februaty 28,1985 (MN-85-42)

DCRDR Suranary Report

Subject:

Main Control Board Upgrades - DCRDR Gentlemen:

In Reference (b), we provided you our schedule for upgrading the Main Control Board (kCB) based, in part, on the results of the Detailed Control Room Design Review (DCRDR) required by NUREG-0737, Supplement 1.

During the 1985 refueling outage, major modifications were made to Sections B and C of the FCB which resulted in the elimination of over 200 human engineering deficiencies (HEDs) identified as a result of the detailed control room design review.

In order to allow sufficient time to thoroughly review the design of all planned modifications to ensure ro unintended system (s) interaction is introduced, we find it necessary to make a schedular change to complete the Jg remaining HED resolutions. Accordingly, we plan to:

noc 5@.

1.

Resolve the few remaining HEDs pertaining to Sections B and C of the jQ FCB, and upgrade one-half of Section A of the FCB and the majority of the Electric Board during the 1987 refueling outaae.

85 2.

Complete the remaining improvements to Section A of the FCB and the

,0 Electric Board and review the annunciator system during the 1988 8<

refueling outage.

S8 a)a L2-3.

Upgrade the annunciator system and the balance of the control room during the 1989 refueling outage.

b Ee

  1. [p 7030L-SDE m < =. uwo

M AINE YANKEE ATOMIC POWEN COMPANY United States Nuclear Regulatory Commission Page Two Attention: Ashok C. Thadani, Director MN-86-16 Please contact us if you have any questions.

Very truly yours, IMItE YAM (EE ATOMIC POWER COH3ANY

)49 /Wh G. D. Whittler, Manager Nuclear Engineering & Licensing GDW/bjp cc: Dr. Thomas E. Murley Mr. Cornelius F. Holden 7030L-SDE