ML20151R304

From kanterella
Jump to navigation Jump to search

Forwards Application for Amend to License NPF-3,removing Organizational Charts from Tech Spec Section 6.0, Administrative Controls, in Accordance W/Guidance Provided in Generic Ltr 88-06.Fee Paid
ML20151R304
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/22/1988
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20151R307 List:
References
1512, GL-88-06, GL-88-6, TAC-67906, NUDOCS 8804270292
Download: ML20151R304 (1)


Text

e -+

e e e t TOLEDO EDISON A Certeru Erergy Cepry DONALD C. SHELTON Vee Presdo%ctar (419]249 2300 Docket No. 50-346 l

License No. NPF-3 Serial No. 1512 April 22, 1988 United States Nuclear Regulatory Commission Document Control Desk Vashington, D. C. 20555 Subj ec t: License Amendment Application to Remove Organization Charts from Technical Specification Section 6.0, Consistent with NRC Generic Letter 88-06. (TAC No. 67906)

Gentlemen:

Enclosed is an application for an Amendment to the Davis-Besse Nuclear Power Station, Unit No. 1 Operating License No. NPF-3, Appendix A, Technical Specifications.

This application requests that the Technical Specifications be revised to reflect the changes attached. The proposed changes involve removing the organization charts from Technical Specification Section 6.0, Administrative Controls, in accordance with tne guidance provided in NRC Generic Letter 88-06, Removal of Organization Charts from Technical Specification Administrative Control Requirements, dated March 22, 1988.

Generic Letter 88-06 stated that proposed license amendments conforming to this guidance vill be reviewed and approved quickly by the NRC Staff. Toledo Edison has conformed with this guidance and therefore requests that the Technical Specification Autendment be expeditiously approved.

Enclosed is a check for $150 as required by 10CFR170.12(c) for a Lic<rnse Amendment application.

Very tr yours, A

CAB:tlt Enclosures cc: DB-1 Resident Inspector 'I A. B. Davis, Regional Administrator ed g gs o Wfc A. V. DeAgazio, NRC/NRR Davis-Besse Project Manager State of Ohio  ;[-51 M THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MAO l SON AVENUE TOLEDO, OHlO 43652 8804270292 880422 PDR ADOCK 05000346 P rcm