ML20151R086
| ML20151R086 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 07/28/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 8808120044 | |
| Download: ML20151R086 (2) | |
Text
.
UNITED STATES
,a
-a>
NUCLEAR REGULATORY COMMISSION 3 e e-N REGION IV 611 RY AN PLAZA DRIVE, SUITE 1000
,8 ARLINGTON. TEXAS 76011 July 28, 1988
-NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee: Omaha Public Power District Name of Facility: Fort Calhoun Station Docket:
50-285 Date and Time August 11, 1988 at 1 p.m.
of Keeting:
Location of Meeting: Region IV, 8th Floor Conference Roon Purpose of Meeting:
Enforcement Conference Regarding Fuel Cycle 11 Setpoint Errors NRC Attendees:
J. Milhoan, Director, Division of Reactor Safety A. Beach, Deputy Director, Division of Reactor Projects G. Sanborn, Enforcement Officer T. Westerman, Chief, Reactor Project Section B R. Mullikin, Project Engineer P. Harrell, Senior Resident Inspector T. Reis, Resident Inspector Licensee Attendees:
K. Morris, Division hanager, Nuclear Operations S. Ganbhir, Division Manager. Production Engineering K. Holthaus, Manager, Nuclear Engineering J. Fisicaro, Supervisor, Nuclear Licensing & Industry Affairs J. Kecy, Reactor Engineer Note: Attendance by NRC personnel at the NRC/ licensee meeting should be made known by COB on August 10, 1988, via telephone call to T. F. Westerman (FTS728-8145)
ApprovLd By:
o L. J. iCRlan Director Divis(ohofReactorProjects 1
\\D 8008120044 000728 1
i PDR ADOCK 05000205 PMJ g
j G
/>
i
.e
~.
~ Distribution:
J. M. Taylor, DEDR0 T. E. Murley, D/NRR F. J. Miraglia, ADP/NRR T. T. Martin, ADT/NRR J. Lieberman, D/0E L. J. Chandler, Asst. GC for Enf.
I Project Manager, NRR T. O. Martin, DEDR0 Staff I
R. D. Martin, RIV l
R. E. Hall, RIV l
i J. Gilliland, PAO, RIV NRC Attendees DMB 5 6 V 6 I
Licensee Address List i
l l