ML20151R047
| ML20151R047 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 07/25/1988 |
| From: | Stello V NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Panetta L HOUSE OF REP. |
| Shared Package | |
| ML20151R050 | List: |
| References | |
| NUDOCS 8808120034 | |
| Download: ML20151R047 (8) | |
Text
a,-,
og UNITED STATES 8
NUCLEAR REGULATORY COMMISSION o
6 g
p WASHINGTON, D. C. 205b5 k.... p8 July 25, 1988 1
The Honorable Leon E. Panetta The United States House of Representatives Washington, D.C.
20515
Dear Congressman Panetta:
This is in response to a letter written by Ms. Karen Norris of your staff to the Nuclear Regulatory Comission (NRC) on June 27, 1988, requesting information about regulatory responsibility in general and about the current status of the Rancho Seco_ Nuclear Generating Station.
Based on a followup telephone dis-cussion wTrr. Ms. Norris on July 6,1938, we understand that the inquiry was initiated by one of your constituents following a spill of radioactive water in the Rancho Seco reactor building on March 15, 1988.
The NRC has overall regulatory respansibility for all matters involving nuclear safety at comercial nuclear staticns. Other organizations, the Environmental Protection Agency, the Federal Emergency Management Agency, the Occupational Safety and Health Administration, as well as certain State organizations also exercise varying degrees of regulatory influence in matters related to their specific areas of responsibility.
The NRC regulatory activities have the most impact on the day-to-day operations at nuclear plants. The NRC assigns resident inspectors to all comercial nuclear power stations to monitor daily activities.
Three resident inspectors are assigned full time to Rancho Seco. They receive support from the NRC Region V office in Walnut Creek, California, and from NRC Headquarters in Rockville, Maryland.
Rancho Seco is currently progressing through a power ascen'sion program following a two-year, NRC-mandated shutdown. The plant restarted on March 30, 1988 and is scheduled to reach full power operation in November 1986. The shutdown was ordered by the PRC following a period of marginal performance at Rancho Seco that led the NRC to question whether cor.tinued operations could be conducted safely. Extensive upgrades were completed during the two-year shutdown, and in March 1988, the NRC p.mitted Rancho Seco to restart. The NRC is monitoring the restart, which has progressed without significant problems.
'b
=R$ 188U ts8 %
H PDC
The Honorable Leon E. Panetta.
The radioactive water spill that was of concern to your constituent involved approximately 650 gallons of reactor coolant water that was released into the reactor building when a relief valve opened. The reactor building is a watertight and airtight structure that houses most of the radioactive plant systems. Liquid and gaseous releases from these systems occasionally occur; however, the reactor building is designed to contain and collect the releases.
The collected releases are processed for reuse or for disposal as radioactive waste. The staff did not consider this event significant.
On the basis of our communications with Ms. Norris, we feel this information will be sufficient to respond to the concerns expressed by your constituent.
Sincerely, Victor Stello, Jr.
Executive Director for Operations
The Honorable Leon E0 Panetta The radioactive water spill that was of concern to your constituent involved approximately 650 gallons of reactor coolant water that was released into the reactor building when a relief valve opened. The reactor building is a watertight and airtight structure that houses most of the radioactive plant systems. Liquid and gaseous releases from these systems occasionally occur; however, the reactor building is designed to contain and collect the releases.
The collected releases are processed for reuse or for disposal as radioactive waste. The staff did not consider-this event significant.
On the basis of our comunications with Ms. Norris, we feel this information will be sufficient to respond to the concerns expressed by your constituent.
Sincerely, (signed) T. A. Reb Victor Stello, Jr.
Executive Director for Operations DISTRIBUTION Docket Fi T OGC-Rockville NRC PDR w/cy of incoming VStello Local PDR w/cy of incoming DMossburg, PMAS (ED0 #3797) w/cy of incoming ED0 #0003797 PShea ED0 Reading GKalman w/cy of incoming TMurley/JSniezek JLee FMiraglia PD5 Green Ticket File PD5 Reading w/cy of incoming FGillespie DMCrutchfield TMartin GMHolahan SECY 88-600 CA
- PREVIOUSLY CONCURRED RMartin, RIV
.0FC :DRS /Piff
- DRSP/PDV*
- DR5P/D:FDV*:* TECH ED.
- DP.5P/AG
- DRSP/D
- ADP
...______:--__..______:..__________:-___________:._...._____;___<_____....:_e
- DMCjd% eld:FJM1 NAME : Lh
- GKalman:dr :GWKnighton :
- GMHolahan ia
<_____:__s.,_______:____________:____________:____________:.___________:_____________:_.
- DATE : 1/if/88
- 7/18/88
- 7/18/88
- 7/18/88
- 7/18/88
- 7/11/88
- / // //88
~
1
'/
Og.y:NRR:j y _______:._____ p_ (___:.
g
- EDO NAA8 4 :Murley
- VStello
_____:____....___:.....[.[.___:...._______:____________:____________:...........
_ _ _ _ _ : _, _ _ T _8
- 7/ W88
- 7MS DATE : I/k/8
\\#
0FFICIAL RECORD COPY Af
The Honorable Leon E. Panetta The radioactive water spill that was of concern to your constituent involved approximately 650 gallons of reactor coolant water that was released into the reactor building when a relief valve opened. The reactor building is a watertight and airtight structure that houses most of the radioactive plant systems. Liquid and gaseous releases from these systems occasionally occur; however, the reactor building is designed to contain and collect the releases.
The collected releases are processed for reuse or for disposal as radioactive waste. The staff did not consider this event significant.
On the basis of our communications with Ms. Norris, we feel this information will be sufficient to respond to the concerns expressed by your constituent.
Sincerely, Victor Stello, Jr.
Executive Director for Operations DISTRIBUTION Docket File 0GC-Rockville NRC PDR w/cy of incoming VStello Local PDR w/cy of incoming DMossburg, PMAS (ED0 #3797) w/cy of incoming EDO #0003797 PShea ED0 Reading GKalman w/cy of incoming TMurley/SniezeF JLee FMiraglia PDS Green Ticket File PDS Reading w/cy of incoming FGillespie DMCrutchfield TMartin GMHolahan
- DRSP/PDV*
- DRSP/D:FDV*:* TECH ED.
- QREP/AD?
- DR5P/D
- ADP NAME :GKaliaan:dr :GWKnighton
- GMHolahani
- DMCrutchfield:FJMiraglia
... _:. ______...:___.....___ :______.____:)_....
//[f88
/ /88
/ /88 lDATE: 7/18/88
- 7/18/88
- 7/18/88 l0FC :NRR
- EDO
- NAME
- TEMurley
- VStello
'DATE :
/ /88
/ /88 0FFICIAL RECORD COPY
The Honorable Leon E. Panetta The radioactive water spill that concerned your constituent-involved approxi-mately 650 gallons of reactor coolant water which was released into the reactor building when a relief valve opened. The reactor buildin~g is a water and airtight structure which houses most of the radioactiv.e plant systems.
Liquid and gaseous releases from these systems occasionally. occur; however, the reactor building is designed to contain and collect the releases. The collected f
releases are processed for reuse or for disposal as radioactive waste. The staff did not consider this event significant.
Based on our communications with Ms. Norris, tiiis information should be sufficient to respond to the concerns expressed by your constituent.
Sincerely, Victor Stello, Jr.
Executive Director for Operai. ions DISTRIBUTION Docket File GMHolahan DHCrutchfield NRC/LPDR
'JMurray RWeller ED0 3797 GPA/CA (3)
JLee ED0 Reading File SECY CCheng TEMurley VStello JRichardson JSniezek DNossburg (E00 3797)
LShao FMiraglia PShea CSerpan MBell PRabideau
- PREVIOUSLY CONCURRED OFC :0RSP/FDV
- DRSP/PDV*
- DRSP/D:PDV* : TECH ED.
- DRSP
- DRSP/D
- ADP
.....: t....____..:___.... ___:-__._____.:...
_y _..__:..../AD
[
- GMHolahan
- DMCrutchfield:FJMiraglia HAME :JLee\\N
- GKalman:dr :GWKnighton
_____:..........:.__.....___:___.________:...M.'______:__.....____:
DATE : / /88'\\
- 7/18/88
- 7/18/88
- 7/ /88
/ /88
/ /88
/ /88 0FC :NRR
- EDO NAME :TEMurley
- VStello DATE : / /88
/ /88 0FFICIAL RECORD COPY
The Honorable Leon E. Panetta Based on our communications with Ms. Norris, this information shculd be sufficient to respond to the concerns expressed by your constituent.
Sincerely, Victor Stello, Jr.
Executive Director for Operations DISTRIBUTION Docket File GMHolahan DMCrutchfield NRC/LPDR JMurray RWeller EDO 3797 GPA/CA (3)
JLee ED0 Reading File SECY CCheng TEMurley VStello JRichardson JSniezek DMossburg(ED03797)
LShao FMiraglia PShea
-R&tarostecki-MBell PRabideau-CSperpan 6ERf'WN DTC- :DRSP/PDV
- RSP/PDV
- DRSP/
- TECH ED.
- DRSP/AD
- DRSP/D
- 3DP
,L ____: ___
NAME :JLee
- GK)a n:dr :GW
- GMHolahan
- DMCrutchfield:FJMiraglia i
s____
_....:____f._____:...___... __:....._______:_____________:.________
DATE :
/88
- )//P/88
- 7//d/88
/ /88
/ /88
/ /88
/ /88
/
i (
OFC :NRR
- EDO
... __:____________:..__________:__..._..____:______...__.:............:._________~ :______..._.
NAME :TEMurley
- VStello s:
- DATE :
/ /88
- / /88 0FFICIAL RECORD COPY i
i o
I
,, gs y80 04
'g
- jo,,g UNITED STATES 1l, y
NUCLEAR P.EGULATORY COMMISSION f,
8 5
j WASHINGTON, D. C. 20555 JM o
c EDO Principal _ Correspondence Control g
00'3797
-FROM:
DUE: 07/15/88 EDO CONTROL:
0 DOC DT: 06/27/88 FINAL RE/LY:
Rap. Leon E. Panetta TO:
NRC FOR SIGNATURE OF:
- GRN CRC NO: 88-0600 ExecutiveI Director DESC:
ROUTING:
REQUEST INFO ON THE REGULATIONS AND STATUS OF RMartin RANCHO SECO NUCLEAR POWER PLANT a
DATE: 07/01/88
(
ASSIGNED TO:
CONTACT:
i NRR Murley e A b
SPECIAL INSTRUCTIONS OR REMARKS:
s'
'I)\\g Mark envelcpe Attn: Karen Norris
\\
i
\\
URR RECEIVED: JULY 1, 1932 (DRSPi? M ipiELpy 4 ACTION:
NRR ROUTING:
MURLEY/SNISZEK f1IPAGLIA
"^" "
ACTION l
1 GILLOSPIP.
E10SS3URG DUE TO NRR DIRECTOR'S OFFICE BY
?k/d 1
iI
~- l 9M' 9
OFFICE OF THE SECRETARY.
CORRESPONDENCE CONTROL TICKET PAPER NUMBER:
_ CRC-88-0600 LOGGING DATE: Jun 30 88 ACTION OFFICE:
EDO AUTHOR:
L.E.
Panetta AFFILIATION:
_U.S.
HOUSE OF REPRESENTATIVES
-LETTER DATE:
Jun 27 88 FILE CODE: ID&R-5 Rancho Seco
SUBJECT:
Req info on the regulations and status of the~
Rancho Seco_nuc power plant ACTION:
Direct Reply DISTRIBUTION:
OCA to Ack SPECIAL HANDLING: None NOTES:
DATE DUE:
Jul 15 88 SIGNATURE:
DATE SIGNED:
AFFILIATION:
Rec'd 0ff. E00
(- 3 0. P k D3tS_
f:YIo une-100---003797 l
L-