ML20151Q984

From kanterella
Jump to navigation Jump to search
Application for Rev 6 to Certificate of Compliance 9151 for Model HN-100 Series 3.Addl Info Encl,Per NRC 850919 Request.Proprietary Encls May Be Placed in Pdr.W/Four Oversize Drawings.Fee Paid
ML20151Q984
Person / Time
Site: 07109151
Issue date: 01/09/1986
From: Leduc R
WESTINGHOUSE HITTMAN NUCLEAR, INC.
To: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20151Q988 List:
References
26310, WHNI-E-853, NUDOCS 8602050213
Download: ML20151Q984 (10)


Text

j /,/. fg'/

RETURN TO 396-SEi

(

-,/

\\

e 4

w/

B USMac g 1 4 Jg86 > -9 Westinghouse a weamcase r

913in m, u Hittman Nuclear m ag h"*

(301) 51 $036

~

g mglg Incorporated

%M7Ctra Refer to: WHNI-E-853 N

g

_m cn N.._

~"

January 9, 1986

=>

so

  • .l Mr. Charles MacDonald, Chief Transportation Certification Branch U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Certification of Westinghouse Hittman Nuclear Incorporated HN-100 Series 3 Shipping Cask with Shield Insert

Reference:

Certificate of Compliance No. 9151, Rev. 6

Dear Mr. MacDonald:

In response to your September 19, 1985, letter (FCTC: RHO 71-9151) attached are eight (8) copies of the following for your review:

(1) Attachment A

" Responses to NRC Letter of September 19, 1985."

(2) Attachment B - Certificate Changes Requested (3) Attachment C - Description of Drawing Revisions and Descrip-tion of Safety Analysis Report Revisions (4) Revised Hittman SAR, Doc. No. STD-R-02-001, Rev. 8, complete (including those revised pages submitted with our April 9, 1985, letter).

(5) liittman Drawing Numbers:

C001-5-9139, Rev. 6

(

C001-5-9140, Rev. 7 w

%g.

C001-5-9141, Rev. 3 C001-5-9143, Rev. 6 g

a; Per earlier disassions, inadditiontorespondingtothepg-vious NRC comments, liittman has made three significant changes to the p[.l t

3

'l ?. Vd i

4 Applicant.I4hp,. Q,y,/,J,5,,, j y,, wj j -

9602050213 0 [ PDRN9j Cl::ck No. C5 PDR A00CK O l a' x

  • TO Catercrd ? ' A C

y y: c : re a p,,, g,,. 4,,.g j7,

y h

L :e Cicck hat'd.f !;/,((.,,,,

~

Re ccived By tk! <,.,., i g,,,,

Mr. Charles MacDonald Page 2 January 9, 1986 cask SAR as part of this submittal.

First, the cask empty weight has been adjusted from 33,800 pounds to the actual, average as-built weight of 35,200 pounds. As a result of this increase in empty cask weight, the allowable payload has been reduced.

Secondly, a refinement of the calculated empty cask center of gravity along with an evaluation of the waste and container center of gravity has resulted in a more conservative location of the center of gravity for the total package. The analysis also takes into account the shear ring located at the base of the cask.

The third significant change is to incorporate the contents of our Document No. STD-R-02-010, " Addendum to Safety Analysis Report for Shielding Insert for HN-100 Series 3 Radwaste Shipping Cask", into the cask SAR Document No. STD-R-02-001 (Addendum became Appendix A of latter). The analysis included in this new appendix has also been revised according to the first and second items above.

Critical factors of safety have been maintained at the original calculated values or increased as a result of these analysis re-visions. The main body of the SAR has been totally retyped on our word processing system so there are some dif ferences in page format and page numbers.

It is noted that the attached documents are stamped " PROPRIETARY" and bear notices relative to the further dissemination of this informa-tion. Hittman has no objection to the filing of this material in the Nuclear Regulatory Commission Public Document Room, provided that the notices remain in file with this material.

Very truly yours,

/ l f / <-,-.

k Robert J. Leduc Director of Engineering RJL/sm49B Attachments (W/ Admin. Fee Check)

1 ATTACHMENT A RADI0 ACTIVE MATERIALS PACKAGE WESTINGHOUSE HITTMAN NUCLEAR INCORPORATED MODEL NO. HN-100 SERIES 3 CERTIFICATE OF COMPLIANCE NO. 9151, Rev. 8

" Responses'to NRC Letter of September 19, 1985" QUESTION #1 It is noted that the revised pages do not have a revision number or date of revision.

This condition could make compliance with document control requirements very difficult and should be cor-rected.

RESPONSE

From this date forward, we will indicate on each revised SAR page the date of the most recent revision of that page.

QUESTION #2 A note has been added to Drawing Nos. C001-5-9139 and C001-5-9140 making the use of the pins, Items 9 and 4 respectively, optional.

The operating procedures, Section 6.0, require the use of either alignment pins or alignment marks to properly align the covers.

The drawing should be revised to provide for the alternative method.

RESPONSE

The notes on the drawings have been revised to indicate the alternate use of alignment marks as required by the operating procedures, Section 4.0 of the SAR.

QUESTION #3 Section 6.0 Operating Procedures.

Step 6.1.7 should provide a more specific requirement on the installation of the ratchet binders.

It is noted that page 67 of the SAR cites a 100 lb force being applied to the ratchet binder handle.

RESPONSE

Step 6.1.7 has been revised to indicate the requirement that the ratchet binders must be torqued to 175-200 ft-lbs to effect the desired compression on the primary lid gasket.

Page 70 has been revised to express the 100 lb force in terms of torque (175 to 200 ft-lbs). Note that because of retyping the SAR on our word processor, Step

'6.1.7 is now on page 70 rather than page 67.

QUESTION #4:

Section 7.0 Acceptance Tests and Maintenance Program.

J j

o The information given in paragraph 7.1.1 should be stated on i

the packaging drawings.

The nondestructive examination of l

welds should be specific as to the method and location of welds to be examined.

RESPONSE

Notes that detail the specific method and locations of welds which are subject to non-destructive testing have been added to the packaging drawings.

o Paragraph 7.1.2 and 7.2.2 should cite Appendix E, Air Test j

Procedure for HN-100 Series 3 cask, STD-P-02-001, Rev. 1.

" RESPONSE:

i Paragraph 7.1.2 has been revised to indicate the acceptance criteria for the i

pressure (structural integrity) test.

I 2

Paragraph 7.1.3 has been revised to detail the leak test parameters and provide j

commitments sufficient to justify the removal of Appendix E from the SAR. The leak test discription also distinguishes the leak test from the 8 psig pressure a

I test of Paragraph 7.1.2.

a Paragraph 7.2.2 has been revised to delete the repetition of the description of j

the leak test parameters and now makes reference to Paragraph 7.1.3.

o Paragraph 7.2.1 should include ratchet binders in the listing of items to be inspected.

j

RESPONSE

}

Paragraph 7.2.1 has been revised to include ratchet binders in the listing of the items to be inspected.

i o

Paragraph 7.2.4 should include, as instructions for gasket replacement, Note 3, Drawing No. C001-5-9138, Rev. 9.

RESPONSE

I r

Paragraph 7.2.4 has been revised to include a reference to the requirements on i

the packaging drawings.

l l

/

ATTACHMENT B CERTIFICATE CHANGES REQUESTED i

Certificate Section Existing Rev. 8 Change To 5.(a)(3)

C001-5-9138, Rev. 7 C001-5-9138, Rev. 9 C001-5-9139, Rev. 4 C001-5-9139, Rev. 6 C001-5-9140, Rev. 5 C001-5-9140, Rev. 7 C001-5-9141, Rev. 2 C001-5-9141, Rev. 3 C001-5-9143, Rev. 5 C001-5-9143, Rev. 6 STD-02-035, Rev. 1 STD-02-035, Rev. A

[

STD-02-036, Rev. 1 STD-02-036, Rev. A 10 Paragraph 8.1 and Figure 1 (Delete First Sentence).

of Hittman Nuclear &

Seals which show any

~ Development Corporation visual defects (cracking, Procedure No. HNDC-0-001-2/3, goaging, tearing, etc.)

Rev. 7 (Hittman letter dated must be repaired in 2

April 27, 1983) are deleted.

accordance with (Delete Seals which show any visual reference to Procedure defects (cracking, gouging, and Section 7.0) Note 3 tearing, etc.) must be re-on Hittman Drawing No.

paired in accordance with the C001-5-9138, Rev. 9;...

referenced procedure and Note 3 on Hittman Drawing No. C001-5-9138, Rev. 7;...

1 I

)

ATTACllMENT C DESCRIPTION OF DRAWING REVISIONS NOTE:

Attachment B to liittman Letter WlINI E-881, dated April 9,1985, in-cludes details of additional drawing changes which pertain to our request for a revision to the current cask certificate.

Please refer to that attachment for those details.

1.

Cask Weldment Drawing C001-5-9139, From Rev. 5 to Rev. 6:

Revised Note-5 to include a reference to the alternate alignment marks.

Added Note-6 and referenced same on welding symbols throughout the drawing, as appropriate.

Revised improper weld symbol on Section B-B.

Revised Note-2 to reference Drawing No. C001-5-9140.

Revised Section D-D to correctly show the tie-down lugs in zones B-9 and B-7 and cross hatched both.

2.

Cask Primary Lid Weldment Drawing C001-5-9140, from Rev. 6 to Rev. 7.

Revised Note-6 to include a reference to the alternate alignment marks.

Added Note-7 and referenced same on welding symbols throughout the drawing, as appropriate.

Revised improper weld symbols on Sections D-D and C-C.

Revised Note-1 to reference Drawing No. C001-5-9139.

Revised Note-2 to reference Drawing No. C001-5-9141.

Revised dimension tolerance on Section C-C to 0" to 7/16" from 1/16"

~

to 7/16" (0" is preferred condition, anything up to 7/16" is an as-built allowable).

3.

Waldments and Details Secondary Lid Drawing C001-5-9141, from Rev. 2 to Rev. 3.

Added Note-8 and referenced same on all weld symbols.

Revised Note-1 to reference Drawing No. C001-5-9140.

4.

Details Cask Body Drawing No. C001-5-9143, from Rev. 5 to Rev. 6.

Added Note-6 and referenced same on welding symbols throughout drawing, as appropriate.

Revised improper welding symbols throughout drawing, as appropriate.

l l

s

DESCRIPTION OF SAFETY ANALYSIS REPORT REVISIONS NOTE:

Attachment B to Hittman Letter WHNI-E-811 dated April 9, 1985, in-cludes details of additional SAR changes which pertain to our request for a revision to the current cask certificate.

Please refer to that Attachment for those details.

l.

The contents of Westinghouse Hittman Nuclear Incorporated Document No.

STD-R-02-010, Addendum to Safety Analysis Report for Shield Insert for HN-100 Series 3 Radwaste Shipping Cask, were added to Document No.

STD-R-02-001, the " original" cask SAR, as Appendix A.

All of the revisions i

discussed below apply to the main body of the analysis and to this appen-dix. Sections 6.0 and 7.0 of the original text of STD-R-02-010 were de-leted because these were a repetition of those same sections in the main body of the analysis. The pages of the now combined SAR have been renum-bered sequentially (1 through 148) and the contents of the main body of the

" original" SAR have been retyped on our word processing system. Typographi-cal errors and unclear sentence wording were corrected as necessary through-J out the now combined SAR.

2.

The empty cask weight was adjusted to the actual average as-built weight of 35,200 pounds. This increase requires a reduction in the stated allowable payload (waste and liner) of the cask. This cask weight revision and the corresponding adjustment to individual component weights have been incor-porated throughout the analysis. This change was done largely as a clarifi-cation to users. The available payload and the package gross weight now agree (rather than continue with the gross weight as the most limiting condition). Our experience is that casks of this design will weigh within a few hundred pounds of the newly incorporated empty weight.

3.

The total package gross weight has been slightly reduced throughout the analysis to 53,000 pounds from 53,005 pounds. The 53,005 pound limit re-i flected more significant digits than were appropriate.

4.

Paragraph 5.2 has been revised to use the correct minimum torque for the l'

shield plug bolts (120 ft-lbs was 80 ft-lbs). This is in agreement with the torque cited in paragraph 6.1.8.g. and the values used on the gasket compression nomograph in Appendix D-1.

5.

Paragraph 6.1.7 has been revised to stipulate the torque requirements for tightening the primary lid ratchet binders. Correspondingly, paragraph S.1 was revised to express the tightening of the ratchet binders in terms of torque rather than pounds of force applied to their handles.

6.

The acceptance criteria for the 8 psi structural pressure test was added to paragraph 7.1.2.

7.

Deleted Appendix E is no longer referenced in Sections 6.0 or 7.0.

The leak test is now described and the acceptance criteria is specified in paragraph 7.1.3.

8.

Paragraph 7.2 has been revised to clarify the period of the routine tech-nical inspections.

9.

Paragraph 7.2.1 now includes the ratchet binders in the list of cask com-ponents to be subjected to structural inspections.

10.

Paragraph 7.2.2 now makes reference to paragraph 7.1.3 and the repetition of the leak test description has been deleted.

11.

Paragraph 7.2.4 now references the packaging drawings as the documents which provide the procedure for replacing defective cask gaskets.

e

.%g s

3 44, 49D 4

+'O etWEEgnB 4

4 8

+Wd*

.' " W Y WWM 'W&

&&4A, e e

s.. - ic 4 a
  • n ww esp.. =

+e-4edier e r#Mi w

ee ham 8Leneg mu-. esp-e esis". e.de-

' e es mp engern.e6 sare e -

4 As ygy.

)

.,-.w e

i I

i DOCKET NO._

/[

~

CONTROL NO.

OdMd DATE OF DOC.

4//f)k(([

DATE RCVD.

8///!((b FCUF PDR L/

FCAF LPDR D!

I6B REF.

I WUR _

SAFEGUARDS FCTC_ /

OTHER

._.pCRIPTION:

A r i s2 eir a e. d -

J(31A2 ff,hf/ V ?

/ y ElftAJ

// /8

[ INITIAL b$2s

OVERSIZE DOCUMENT

~

PAGE PULLED SEE APERTURE CARDS NUMBER OF PAGES:

ACCESSION NUMBER (S):

g(o o ooso V //

h o O 06 0V/ A Sto n co 6 o 416 8 G 6 o cT5 O LII(D APERTURE CARD / NARD COMf AVAlt.ABLE FROM RECORD SERVICES BRANCH,TIDC FTS 492-8939


e

--w wwwwas ww--sem.g w

we'

-p-*'*

m-W-'"