i TABLE 4.3-2 (Continued) cm ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION h
SURVEILLANCE REQUIREMENTS C
TRIP z
ANALOG ACTUATING MODES
-4 CHANNEL DEVICE MASTER SLAVE FOR WHICH CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION RELAY RELAY SURVEILLANCE pONCTIONALUNIT CHECK CALIBRATION TEST
__ TEST LOGIC TEST TEST TEST IS REQUIRED 4
D. Automatic Opening (Continued) a.
Automatic Actuation Logic and Actuation Re1ays N.A.
N.A.
N.A.
N.A.
N(1)
M(1)
Q 1, 2, 3, 4 8
b.
kWST Level-Low-Low S
R M
N.A.
N.A.
N.A.
N.A.
1, 2, 3, 4 Coincident With Safety Injection See Item 1. above for all Safety Injection Surveillance Requirements ia M. Loss of Power
'I,'
a.
ESF Bus Undervoltage N.A.
R N.A.
M(2, 3)
N.A.
N.A.
N.A.
1, 2, 3, 4 l
f b.
Grid Degraded Voltage N.A.
R N.A.
M(3)
N.A.
N.A.
N. A.
1, 2, 3, 4 9.
Engin2ered Safety Feature Actuation System Interlocks 1
a.
Pressurizer Pressure, N.A.
R M
N.A.
N.A.
N.A, M.A.
1, 2, 0 P-11 b.
Reactor Trip, P-4 N.A.
N,A.
N.A.
R N.A.
N.A.
N.A.
1,2,3
)
c.
Low-Low T,,g, P-12 N.A.
R M
N.A.
N.A.
N.A.
N.A.
1, 2, 3
{
g d.
Steam Generator Water S
R M
N.A.
M(1)
M(1)
Q 1, 2 1
m Level, P-14 j
'i (High-High) g TABLE NOTATION g((1)
Each train shall be tested at least every 62 days on a STAGGERED TEST BASIS.
2)
Undervoltage relay operability is to be verified independently. An inoperable channel may be bypassed j
for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of the OPERABLE channel per Specification 4.3.2.1.
i)
(3)
Setpoint verification is not applicable.
The specified 18 month interval may be extended to 32 months for Cycle 1 only, g