Amend 25 to License NPF-43,revising Provisions Re Footnote in Tech Specs Table 1.2, Operational Conditions
ML20151Q718
Person / Time
Site: Fermi 
(NPF-43-A-025, NPF-43-A-25)
Issue date: 08/03/1988
From: Virgilio M
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20151Q722 List:
References
NUDOCS 8808110267
Download: ML20151Q718 (5)


Text

'

'o,,

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

h WASHINGTON, D. C. 20555

,/

DETROIT EDISON COMPANY WOLVERINE POWER SUPPLY COOPERATIVE, INCORPORATED DOCKET NO. 50-341 FERMI-2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 25 License No. NPF-43 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by the Detroit Edison Company (the licensee) dated March 28, 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; l

D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and 1

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-43 is hereby amended to read as follows:

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 25, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

Deco shall operate I

the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

kkkOIjjyCK67 agogo3-03000341 p

PNU I

2-3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION eM-bog Marti -J.

Virgilio, Director Project Directorate III-1 Division of Reactor Projects - III, IV, V

& Special Projects

Attachment:

Changes to the Technical Specifications Date of Issuance: August 3, 1988

,w

-,.....y--

,v..

-y

.,w.-

.-,.-.,,-,,,x.-

y_.--.,._-.-.,

.-r-....

ATTACHMENT TO LICENSE AMENDMENT N0. 25 FACILITY OPERATING LICENSE NO. NPF-43 DOCKET NO. 50-341 Replace the following page of the Appendix "A" Technical Specifications with the attached page.

The revised page is identified by Amendment number and contains a vertical line indicating the area of change.

The corresponding overleaf page is also provided to maintain document completeness.

REMOVE INSERT 1-10 1-10

DEFINITIONS TAlnj 1.1 SURVEILLANCE FREQUENCY NOTATION NOTATION FREGUENCY S

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

D

.At least once ter 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

W At least once par 7 days.

M At least once p?r 31 days.

Q At least once per 92 days.

SA At least once per 184 days.

A At least once per 366 days.

R At least once per 18 months (550 days).

S/U Prior to each reactor startup.

P Prior to each radioactive release.

NA Not applicable.

1 l

i l

l FERMI - UNIT 2 1-9

DEFINITIONS TABLE 1.2 OPERATIONAL CONDITIONS H0DE SWITCH AVERAGE REACTOR CONDITION

_ POSITION COOLANT TEMPERATURE 1.

POWER OPERATION Run Any temperature 2.

STARTUP Startup/ Hot Standby Any temperature 3.

HOT SHUTOOWN Shutdown #,***

> 200 F 4.

COLD SHUTDOWN Shutdown #,##,***

1 200 F 5.

REFUELING

  • Shutdown or Refuel **,#

1 140 F

  1. The reactor mode switch may be placed in the Run, Startup/ Hot Standby, or Refuel position to test the switch interlock functions and related instrumentation provided that the control rods are verified to remain fully inserted by a second licensed operator or other technically qualified member of the unit technical staff.
    1. The reactor mode switch may be placed in the Refuel position while a single control rod drive is being removed from the reactor pressure vessel per Specification 3.9.10.1.
  • Fuel in the reactor vessel with the vessel head closure bolts less than fully tensioned or with the head removed.
    • See Special Test Exceptions 3.10.1 and 3.10.3.

~

      • The reactor mode switch may be placed in the Refuel position while a single control rod is being recoupled or withdrawn provided that the one-rod-out interlock is OPERABLE.

l FERMI - UNIT 2 1-10 Amendment No. 25