ML20151P984

From kanterella
Jump to navigation Jump to search
Environ Assessment & Finding of No Significant Impact Re Proposed Amend to Tech Specs to Reflect 4-h Div II Battery Emergency Loading Profile
ML20151P984
Person / Time
Site: Clinton 
Issue date: 08/04/1988
From: Olshan L
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20151P988 List:
References
NUDOCS 8808100254
Download: ML20151P984 (4)


Text

i h

B 7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION ILLIN0IS POWER COMPANY, ET AL.

DOCKET NO. 50-461 ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT TheU.S.NuclearRegulatoryCommission(theCommission)iscon:1dering issuance of an amendment to the Illinois Power Company * (IP), Soyland Power Cooperative Inc. and Western Illinois Power Cooperative, Inc., (the licensees) for Clinton Power Station, Unit 1, located in DeWitt County, Illinois.

ENVIRONMENTAL ASSESSMENT Identification of Proposed Action:

In general, the proposed license amendmentwouldreviseTechnicalSpecification(TS)Section4.8.2.1.d.2. bin order to accurately reflect the 4-hour Division II battery emergency loading profile. The licensees proposed to increase the emergency loading profile of the Division II battery by 10 amperes. This increases the first, second, and third periods of the battery emergency loading profile to 462 amperes, 296 i

amperes, and 108 amperes, respectively.

e This revision to the Clinton Power Station license would be made in response to the licensees' application for amendment dated October 30, 1987.

  • Illinois P6wer Company is authorized to act as egent for Soyland Power Cooperative, Inc. and Western Illinois Power Cooperative, Inc. and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.

8808100254 880804 PDR ADOCK 05000461 P

PDC

The Need for the Proposed Action:

Pursuant to 10 CFR 50.90 IP, et al.

have proposed an amendment to Facility Operating License No. NPF-62 in order to accurately reflect the 4-hour Division II battery emergency loading profile.

The purpose of this profile is to define the level of loading in amperes that the battery would have to supply for a specific time period during an emergency condition with the battery charger inoperable. The Technical Specification requires a demonstration once every 18 months during shutdown that the battery can supply a dumy load of that profile or that it can supply the actual emergency loads.

A review conducted by the licensees detemined that a Division II load (Fire P atection dist-*

'on panel) was not considered for this profile during a previous plant modification review.

The proposed Technical Specification change therefore increases the emergency loading profile of the Division II battery by 10 amperes. This increases the first, second, and third periods of the bettery emergency loading profile to 462 amperes, 296 amperes, and 108 amperes, respectively.

Environmental Impacts of the Proposed Action: The licensees stated that the battery capacity has been evaluated using the new loading profile to ensure its capability of supporting required design basis accident loads. The staff 4

has determined that the change in battery load is not significant in comparison to the battery capacity and that the batteries are capable of supplying the new loads now and at the end of their twenty year life per IEE 485.

Based on the relatively small increase in battery loading and the battery's capability of supplying the new loads, the staff conclurles that the Division II cattery will continue to provide its original 4-hour endurance under the new emergency loading profile.

__..._.s

3 l

The Comission has detennined that potential radiological releases during 1

l rormal operations, transients, cnd for accidents would not be increased. With I

regard to non-radiclogical impacts, the proposed amendment involves systems located entirely within the restricted area as defined in 10 CFR Part 20.

l They do not affect non-radiological plant effluents and have no other environmental impact. Therefore, the staff also concludes that there are no l

l significant non-radiological environment impacts associated with the proposed amendment.

I Accordingly, the Comission findings in the "Final Environmental l

Statement related to the operation of Clinton Power Station, Unit No.1" dated May 1982 regarding radiological environmental impacts from the plant during normal operation or after accident conditions, are not adversely altered by l

this action.

IP is comitted to operate Clinton, Unit 1 in accordance with j

standards and regulations to maintain occupational exposure levels "as low as reatonably achievable".

Alternative to the Proposed Actions: The principal alternative would be to deny the requested amendment. This alternative, in effect, would be the same as a "no action" alternative. Since the Comission has concluded that no I

adverse environmental effects are associated with this proposed action, any alternatives with equal or greater environmental impact need not be evaluated.

l e

Alternative Use of_ Resources: This action does not involve the use of resources not previously considered in connection with tne Nuclear flegulatory Comission's Final Environmental Statement dated May 1982 related to this facility.

Agencies and Persons Consulted: The NRC staff reviewed the licensees' request of October 30, 1987 and did not consult other agencias or persons.

FINDING OF NO SIGN!flCANT IMPACT: The Commission has determined not to prepare an environmental impact statement for the proposed license amendment.

Based upon this Environmental Assessment, the Connission concludes that the proposed action will not have a significant adverse effect on the quality of the human environment.

For further details with respect to this action, see the request for amendment dated October 30, 1987 and the Final Environmental Statement for the Clinton Power Station dated May 1982, which are available for public inspection at the Commission' Public Document Room,1717 H Street, N.W.,

Washington, D.C.

20555 and at the Vespasian Warner Public Library,120 West Johnson Street, Clinton, Illinois 61727.

Dated at Rockville, Maryland this 4th day of August 1988.

FOR THE NUCLEAR REGULATORY COMMISSION H 4.W Leonard N. 01shan, Acting Director Project Directorate III-2 Division of Reactor Projects III, IV, Y and Special Projects

..