ML20151P148

From kanterella
Jump to navigation Jump to search
Forwards Rev 6 to Updated FSAR for Prairie Island Generating Plant & Annual Rept of Changes,Tests & Experiments
ML20151P148
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 07/07/1988
From: Musolf D
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20151P151 List:
References
NUDOCS 8808090228
Download: ML20151P148 (1)


Text

.

l Northern States Power Company 414 Neot'et Man Minneapohs. Minnesota 55401 Telephone 1612) 330-5500 July 7, 1988 10 CFR 50.71(c)

U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE IS1AND NUCLEAR GENERATING PIANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Submittel of Revision No. 6 to the Updated Safety Analysis Report ( U S tiR,_).

Pursuant to 10CFR 50.71(c) we are submitting 14 copies of Revision No. 6 to the Updated Safety Analysis Report (USAR) for the Prairie Island Generating Plant. This revision updates the information in the USAR for the period from January 1, 1967 through December 31, 1987.

Exhibit A contains a description and a summary of the safety evaluations for changes, tests and experiments made under the provisions of 10CFR 50.59 during this period.

Exhibit B contains the USAR page changes and instructions for entering the pages. Included in Exhibit B is Revision 12 to the Northern States Power Company Operational Quality Assurance Plan in compliance with 10 CFR 50.54(a).

Changes included in Revision 12 to the plan are described in Exhibit A of this letter.

l l

r. '9bwa#

David Musolf Manager - Nuclear Support rvices DMM/ TAP / tap c: Regional Administrator-III, NRC O Director IE, NRC (w/o Exhibit B) l NRR Project Manager, NLC (w/o Exhibit B) '

g Resident Inspector, NRC (w/o Exhibit B)

G Charnoff (w/o Exhibit B)

Attachments 228 880707 g hlOCK05000292 PDC s . . . . .